ML20150B881

From kanterella
Jump to navigation Jump to search
Forwards Draft Rev 5 to ES-601, Administration of NRC Requalification Program Evaluations. W/O Encl
ML20150B881
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/23/1988
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Overbeck G
DETROIT EDISON CO.
References
NUDOCS 8807120226
Download: ML20150B881 (1)


Text

, . . . .- -

$ 2 3188 Docket No. 50-341 Detroit Edison Company Fermi Power Plant ATTN: Mr. Greg Overbeck Training Department 6400 N. Dixie Highway Newport, MI 48166

SUBJECT:

REQUALIFICATION EXAMINATIONS

Dear Mr. Overbeck:

Region III has completed a pilot requalification' exam at the Perry facility utilizing the new requalification examination methodology.

In order to provide you with' the latest,_ although not necessarily final, procedure and guidance on the requalification process the following information is being provided for your information. '

1. Draft of ES601 Rev 5 "Administration of NRC Requalification Program Evaluations".
2. Written Exam from Perry
3. Selected Simulator Scenarios from Perry
4. Selected Job Performance Measures (JPM) from Perry.

4 If you have any questions on the present status of the process please contact meat (312)790-5695.

Sincerely, ORIGINAL. SIGNED BY. GE0EFREY C. WRIGHT Geoffrey C. Wright, Chief Operations Branch i

Enclosures:

As stated cc w/ enclosures:

Fermi, SRI ,

cc w/o enclosures: '

s R. Cooper, DRP 1

R II  ;

pg .

Wright /mc l I ,

set V

.