Forwards Latest Rev to Action List,Describing Program Plan to Resolve Concerns Stemming from 851002 Transient.All Startup Required Items Completed.All Power Escalation Items Will Be Completed by Full Power Operation
ML20138R929
Person / Time
Site: Rancho Seco
Issue date: 11/15/1985
From: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Thompson H
Office of Nuclear Reactor Regulation
References
RJR-85-555, TAC-59691, NUDOCS 8511190267
Download: ML20138R929 (13)


Text

- - - - - - - - - - - - - - - - _ --

-- 4

.lSMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, P.O. Box 15830, Sacramento, CA 95813; (916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA RJR 85-555 l

November 15, 1985 DIRECTOR OF NUCLEAR REACTOR REGULATION ATTENTION HUGH L THOMPSON JR DIRECTOR DIVISION OF LICENSING U S NUCLEAR REGULATORY COMMISSION WASHINGTON D C 20555 DOCKET 50-312 RANCHO SECO NUCLEAR GENERATING STATION UNIT NO 1 UPDATED PROGRAM PLAN TO RESOLVE ITEMS FROM TRANSIENT OF OCTOBER 2, 1985 In several letters during the period of October 14 thru 25,1985, the District supplied the NRC staff with an " Action List". The " Action List" describes the District's program plan to resolve concerns stemming f rom the transient of October 2, 1985. The District committed to provide a status of the short term items and a completion schedule for those items desigpated as long term by November 18, 1985. Attached to this letter is the latest revision to the " Action List". It is important to note that the District has completed all of the "startup required" items and will have completed all of the " power escalation" items by full power operation.

If you have any questions conerning any of the above items, contact Jerry D leze s i of my staff.

E w R. J. R0 RIGUEZ ,

l ASSISTANT GENERAL 'ANAGER, NUCLEAR Attachment

%g,

-h$kA1'9 J.}

E _-

LEGEND: SU = Startup R:quir:d ,h LT = Long Term

~

STATUS DATE 11-14-85  :

PE = Power Escalation OCTOBER 2, 1985 TRANSIENT TIME 1200 NA = Not Applicable

ST = Short Term - ACTION LIST -

4 j DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ COMMENTS l ETC.  ;

! I Post Trip Report J. Field SU Completed NA l II Root Cause Analysis S. Crunk SU Completed

  • NA Reviewed by Management i Review Team.*

i j III Aux FW ICS Control

a. Verify calibration of N. Brock SU Completed 104969, 104972 i appropriate modules. 104973, 104974

, 104975

b. Reset of Aux FW Valves B. Spencer SU Completed S0-20-85 Crews were trained.

on MFWP Reset.

I

c. Revise procedures for B. Spencer SU Completed NA Temporary change to III b. Operating Procedure A.51. i I

l d. Evaluate design of AFW V. Lewis ST To be NA l valve reset on restart Completed 3

of WW Pump or RCP. 11/22/85  :

I ,

j 1. Revise AFW valve N. Brock SU Completed R-0196  ;

control logic for l loss of MFW pumps. f i
  • October 14 commitment for review by MRT completed. Finalized Root Cause Analysis still in progress.

t i  :

z = : . ; -- - --

- -.z;; =. - - - . . . .

~

i.)

l LEGEND: SU = Startup-Required j LT = Long Term

.PE = Power Escalation OCTOBER 2, 1985 TRANSIENT STATUS DATE 11-14-85 TIME 1200 1

1

-j NA = Not Applicable

.; ST' = Short Tem - ACTION LIST -

-l DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ C0fMENTS ETC.

! IV HPI "A" Inject Line flow l indication

a. Write and perfom J. Field SU Completed STP-180

)

Special Test Procedure.

i

! -b. Perfom calibration N. Brock SU Completed 105228 l check of FT-23807.

j c. Resolve flow anomaly and J. Field SU Completed S-5103,

prepare Summary Report. S-5150, Rev. 2
d. Write and perfom a 2nd J. Field SU Completed STP-184

_. ) Special Test Procedure.

l l e. Infom operators of M. Hieronimus SU Completed SO 22-85 characteristic of

~i flow indication.

l

)' f. Recalibrate HPI flow N. Brock SU Completed 105422, 105424 transmitters so actual 105478, 105421 l flow is greater than indicated.

V Pegging Steam Controls

a. Detemine adequacy of J. Field SU Completed NA l- pegging steam setpoints
and FW heater relief 8 valve setpoints.

s 8

3 1 .

fj j LEGEND: SU = Startup R:quirId LT = Long Term STATUS DATE 11-14-85 3

~l PE = Power Escalation OCTOBER 2, 1985 TRANSIENT TIME 1200 l NA = Not Applicable 1 ST = Short lem - ACTION LIST -

J DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ COMENTS j ETC.

1 V b. 1. Verify setpoints of R. Lawrence SU Completed 104541, 104544 All setpoints as per

, . 2nd and 4th Point 104542, 104543 Process Standards.

heater shell relief 104562, 104563 valves. '

2. Reset 4th point R. Lawrence SU Completed 104581, 104583 Revised setpoint values .

! heater shell reliefs 104582, 104584 per V a.  ;

j to new setpoint ,

values.  ;

) c. Verify setpoints of all R. Lawrence PE To be 104573, 104575 Will require use of hydro i secondary system relief Completed 104574, 104576 assist on valves without i

valves which could 11/19/85 recent setpoint history. ,

j cause rapid cooldowns/ *

, other FW heater shell rel ief s.

l

d. Detemine appropriate R. Lawrence LT To be To be done as part of PM
periodic test program Completed program upgrade.

1 (i.e., either PM or SP 6/1/86 i Program) and implement i same for all secondary relief valves.

}

i e. Resolve report of MSR J. Field SU Codipleted NA Resolved that MSR Reliefs i

Reliefs lifting after did not lift.

l Rx/ Turbine trip.

t

f. Establish criteria for V. Lewis LT To be l process setpoint Completed determination. 2/1/86 ,

l J.

I LEGEND: SU = Startup R:: quired LT = Long Term STATUS DATE 11-14-85 i PE = Power Escalation OCTOBER 2, 1985 TRANSIENT TIME 1200 NA = Not Applicable ST = Short Tenn - ACTION LIST -

DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ CCMMENTS ETC.

V g. Review plant for proper V. Lewis LT To be application of criteria. Completed 5/1/86

} h. Add setpoints for R. Colombo LT To be AP.152

FSL-32243, 32244, and Completed
32453 to Process 12/1/85 l Standards.

1 VI "A" Main Feedwater Pump seal water and controls

a. Repair linkage on N. Brock SU Completed 104965, 105378 l controller.
b. Check common mode N. Brock LT To be NA Looking for common mode 1 failure possibility on Completed relations to VI a.

j controller linkage. 12/15/85 j VII Main Feed Pump Trip Event

a. Perform test to duplicate J. Field NA Deleted STP-181 Test not required.

j low vacuum condition.

b. Install monitoring N. Brock SU Completed
  • instrumentation.

I

c. Verify "as built" wiring C. Linkhart SU Completed 102722 Plant drawings accurately of "A" FWP trip circuits. show "as built" l configuration.

}

l 1

i I

l

i

.1 -

I j LEGEND: SU = Startup R: quired '

.)

LT = Long Term -

STATUS DATE 11-14-85 PE = Power Escalation OCTOBER 2, 1985 TRANSIENT TIME 1200 NA = Not Applicable ST = Short Terin - ACTION LIST -

, DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ COM4ENTS

'i '

ETC.

-l VII d. Check setpoints of trip N. Brock PE Completed 102716, 102721

. devices. 102718, 103272 102720, 103273

e. Compile history of FW N. Brock ST Completed NA pump control problems.

i i f. Check end play on main R. Lawrence SU Completed 102719 Acceptable.

} shaft of "A" MFW Pump.

j g. Obtain L0 sample from R. Lawrence SU Completed 103269, 102719 Normal. '

j "A" and "B" MFW Pump and i have analysis performed.

i  !

h. Verify "as built" wiring C. Linkhart SU Completed 105686 Acceptable; elementaries of "B" FWP trip circuits. are correct. S-5119 written. i i

i 1. Install Trip Circuit C. Linkhart LT To be Requires pump out of I' i Alarm Lights. Completed service.

{ During Cycle j 8 Refueling 1 Outage l

VIII Main Condenser Loss of Vacuum Event l a. Update drawings to R. Lawrence SU Completed R-0177

! reflect "as built" conditions of MSR relief sealing steam.

1

g i

}!

i LEGEND: SU = Startup R; quired <

j LT = Long Term STATUS DATE 11-14-85

~

. PE = Power Escalation OCTOBER 2, 1985 TRANSIENT TIME 1200 NA = Not Applicable ST = Short Tem - ACTION LIST -

DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ COMMENTS ETC.

! VIII b. Revise procedure (s) to B. Spencer SU Completed NA Temporary change to

! show MSR relief sealing Operating Procedure A.49 steam valves. written.

l ,

l c. Determine whether B. Spencer SU Completed NA Revision 12 to Operating sealing steam procedures Procedure A.49.

are adequate and usable.

d. Review / analyze perfom- J. Field LT To be NA ance of the gland steam Completed

, condenser. 7/1/86 1

e. Investigate when/why MSR B. Spencer SU Completed NA Investigation unable to

) sealing steam valve was to ascertain when/why ,

l closed. valve was closed.

I

{ f. Determine whether MSR R. Lawrence LT Completed NA Review shows adequate Relief Sealing Steam for restart.

l System works as designed.

i'

g. Initiate WR for rework R. Lawrence LT Completed 104113 Work Request written to be t of leaking MSR relief reworked at the next

, val ve. refueling outage.

I

h. Resolve setpoint error S. Carmichael SU Completed 105116 Reset to proper value.

of main turbine low vacuum trip.

l 1. Correct / upgrade docu- R. Lawrence LT To be i mentation for Completed I maintenance on turbine 1/1/86 j trip block.

l l

- _ _ _ - - _ . _ . q l

LEGEND: SU = Startup Required j LT = Long Ters -

STATUS DATE 11-14-85

'I PE = Power Escalation OCTOBER 2,.1985 TRANSIENT TIME lau j NA = Not Applicable  :

i ST = Short Tem - ACTION LIST - i J

DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ COPMENTS

ETC.

VIII j. Include placement / B. Spencer SU Completed Temporary change to l removal of MSR relief Operating Procedure B.3 valve covers in written.

procedures.

4 l k. Fabricate new MSR relief R. Lawrence ST To be i valve covers. Completed i 12/15/85 i

i

1. Include main turbine R. Colombo ST To be

} trip setpoints in Completed j Process Standards. 12/1/85 1

i m. Develop design improve- V. Lewis LT To be Living Schedule will ment to reduce leakage Included in determine final completion of MSR relief valves. Living date.

j Schedule

by 1/1/86 i

i IX Condensate /FW Oscillation J. Field SU Completed NA-l l

l X ICS Tuning f a. Prepare ICS/Feedpump N. Brock PE Completed STP-657 Approved by PRC 10/18/85.

.i tuning STP.

?

I

b. Perform tuning as plant N. Brock PE To be Based upon achieving full i conditions pemit. Completed power prior to this date and j 12/1/85 allowing 2 days of tuning at 100 percent power.

t

_a------- _ _---------------- .

t LEGEND: SU = Startup Required LT = Long Tern STATUS DATE 11-14-85 -

t PE = Power Escalation OCTOBER 2, 1985 TRANSIENT TIME 1200

! NA = Not Applicable ST = Short Term - ACTION LIST -

DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ COMMENTS ETC.

X c. ATc Control N. Brock LT To be Completed 12/15/85 4

XI Valve Identification Program

a. Develop list of selected B. Spencer SU Completed To incigde Operating systems for Operations Procedures A.37, walkdown. A.49,A.41, A.42, A.50, A.46, A.34, A.38, A.40, A.51, A.47, A.28, A.39, A.53, A.6.

. b. Operations crew to walk B. Spencer SU Completed

down systems to identify valves not on prints.
c. Prepare NCRs on findings, B. Spencer SU Completed NCRs written. Temporary revise procedures as changes to procedures necessary, and tag valves. written. Valves tagged.
d. Update drawings D. Abbott LT To be (P and ids). Completed 4/1/86
e. QA Surveillance H. Canter SU Completed No's. 492,

, 488 I

I i,

i

1 ,

i

  • I LEGEN0: SU = Startup R:: quired *

, LT = Long Ters -

STATUS DATE 11-14-85 l OCTOBER 2, 1985 TRANSIENT TIME 12U0 t

! PE = Power Escalation i NA = Not Applicable ST = Short Tem - ACTION LIST -

DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ C0fMENTS6 ETC. -

XII "B" Feedwater Line Leak R. Lawrence SU Completed 104548, 104564 Report addressing the

Reactor Building. 104560, 104572 cause and the repair done.

I 102095, 104569 Material meets applicable

  • l 104567, S-5090 code. l 1 S-5111, S-5093 i 1 i XIII P-319 Bearing Failure t
a. Pump Repair R. Lawrence SU ' Compl eted  !

n .

Surveillance History and

b. Maintenance History R. Lawrence SU Completed l l Cause of Failure / Post Repair Test

} Corrective Action  ;

I c. QA Surveillance J. Jewett SU Completed No. 485  !

1

d. Provide oiling B. Rausch SU Completed TS 85-1033 To include safety related I l instructions pumps. How to determine  ;

l level. How to maintain oil i level. Pump specific

'li instructions, j t

i e. Past practice on LO B. Spencer SU Completed Level. '

il l f. Investigate whether R. Lawrence SU Completed HLC 85-067 No level change was made.

l "Nomal" level was  ;

changed. t l

[ g. 48-Hour Endurance Run J. Field SU Completed STP-182 1 l 1

1

_ :_ . - . . - - , 1 . 2. - - - . -

3

_ _ _ ~

j . -

(

LEGEND: SU = Startup Required 4 i LT r Long Term -

STATUS DATE 11-14-85 i

i PE = Power Escalation OCTOBER 2, 1985 TRANSIENT . TIME 1200 l l NA = Not Applicable '

)

ST = Short Ters - ACTION LIST -

i i

DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ C0fMENTS ETC.

XIII h. Identify all safety R. Lawrence SU Completed NA .

related pumps which j utilize slinger rings.

1. Oil level indication for V. Lewis SU Completed S-5120, S-5124 P-318, 319, 482 A and B, S-5114, S-5115

, and 261 A and B. S-5117, S-5118 i

j j. Root Cause S. Crunk SU Completed

  • Reviewed by Management Review Team.

l l k. Inspect rings in pumps R. Lawrence SU Completed 102096, 102097 j which have been 102099 previously disassembled.

i 1

XIV Loss of Aux Steam Event

] a. Prepare Report M. Nickerson SU Completed TS 85-1021 I

b. Root Cause S. Crunk LT To be NA Included in RC 85-021.

Completed i 12/15/85 f c. Investigate Aux Boiler C. Linkhart SU Completed NA j Power Supply.

5

d. I and C analysis of N. Brock LT Completed XIV c.
  • Review by MRT completed. Finalized Rcci Cause Analysis still in progress.

l 1

1 1

4.

LEGEND: SU a Startup R:quir:d .-e '

LT = Long Term STATUS DATE 11-14-85 TRh PE = Power Escalation DCTOBER 2, 1985 TRANSIENT TIME 1200 Gb NA = Not Applicable  :,0 ST = Short Term - ACTION LIST - f r, -

DESCRIPTION RESPONSIBILITY SCHEDULE

STATUS WR No./NCR/ COMMENTS ETC.

XV Training

a. Lessons Learned F. Thompson LT To be NA Review and if determined i<

Completed necessary, revise lesson a 4/1/86 plans.

b. Training on Item III.b B. Spencer SU Completed NA SO 20-85 (Instructions / '.

Recommendation) ,; ,

c. Training on pumps / motor M. Hieronimus SU Completed SO 24-85 oiling
d. Training on Item III.d.1. B. Spencer SU Completed SO 23-85 Crews trained prior to -

going on shift.

XVI Procedure Adequacy

a. E0Ps D. Comstock SU Completed NA Rule 4 and E.05 revised. .
b. Normal Procedures D. Comstock LT To be NA To include Operating Completed Procedures B.1, B.2, B.3, 3/1/86 and B.4.
c. Identify operator actions M. Hieronimus LT Active NA Problem Feedback Report not specifically Program System initiated by addressed in procedures. Operations 10/10/85.
d. Monitor operation D. Comstock PE Completed NA procedures during SU.
e. Evaluate operator D. Comstock SU Completed NA performance during the '

trip.

Is

q t

i LEGEND: SU = Startup R:quir:d LT' = Long Tenn -

STATUS DATE 11-14-85 PE = Power Escalation OCTOBER 2,1985 TRANSIENT TIME Izuu NA = Not Applicable ST = Short Term - ACTION LIST - .

DESCRIPTION RESPONSIBILITY SCHEDULE STATUS WR No./NCR/ COMENTS ETC. <

XVII Health Physics / Emergency Plan

a. Health Physics aspects. F. Kellie SU Completed FWK 85-202 No !!ealth Physics impact.

$ b. Emergency Plan B. Spencer SU Completed NA Emergency Plan did not 1 utilization. require activation.

XVIII RCS Overcooling

a. Tech Spec Review R. Colombo SU Completed NA
b. B and W Evaluation J. Field SU Completed NA B and W letter, SMUD-85-222, dated Oct. 4, 1985, " Structural Integrity j of Pressure Boundary Components are Suitable for Continued Power Operation.

l XIX Preventive Maintenance Program t for Non-safety Related

]

Equipment

! a. Description of existing R. Lawrence SU Completed NA j program. .

b. Planned improvements. R. Lawrence LT Requires NA i 11/30/85
response to NRC.

1 1

1 1