Forwards Biennial Update to Rancho Seco Post-Shutdown Decommissioning Activities Rept
ML20137W809
Person / Time
Site: Rancho Seco
Issue date: 03/20/1997
From: Redeker S
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Weiss S
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137W812 List:
References
MPC&D-97-057, MPC&D-97-57, NUDOCS 9704210009
Download: ML20137W809 (2)


Text

' '

tb kd 1/7

,/ V////f7 Usuun SACRAMENTO MUNICIPAL UTIUTY D: STRICT O 6201 S Street, P.O. Box 15830, Sacramento CA 958521830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA MPC&D 97-057 March 20,1997 i

U.S. Nuclear Regulatory Commission I Attn.: Document Control Desk J Washington, DC 20555 1

Docket No. 50-312  !

Rancho Seco Nuclear Generating Station License No. DPR-54 )

h RANCIIO SECO POST-SIIUTDOWN DECOMMISSIONING ACTIVITIES REPORT Attn.: Seymour Weiss j

As required by the Rancho Seco Decommissioning Order, we are submitting the biennial l update to the Rancho Seco Post-Shutdown Decommissioning Activities Report (PSDAR). l The NRC approved the Rancho Seco Decommissioning Plan on March 20,1995, and l under the current 10 CFR 50.82 requirements, the document is now the Rancho Seco PSDAR.

As required by 10 CFR 50.82, the Rancho Seco PSDAR includes a description of planned decommissioning activities, the schedule of activities through license termination, an estimate of expected costs, and a discussion of whether existing environmental impact statement: bound the environmental impacts of the proposed actions.

In addition to the PSDAR, we have included the associated 10 CFR 50.59 determination, which evaluates the changes made to revise the Decommissioning Plan to conform to the PSDAR content requirements specified in 10 CFR 50.82. Information contained in the Decommissioning Plan that is not required to be in the PSDAR has been removed; however, the basic decommissioning strategy remains the same. g As discussed in the 10 CFR 50.59 determination, certain information removed from the Decommissioning Plan, including the decommissioning accident analysis, will be retained f in the Decommissioning Safety Analysis Report. Also, the 10 CFR 50.59 determination ,/

9704210009 970320 DR ADOCK 050003 2 l$llll[]ll]lllll]l[ll$

RANCHO SECO NUCLEAR GENERATING STATION D 14440 Twin Cities Road, Herald, CA 95638-9799;(209) 333 2935

, - .-. . -.- . _ . . . .-. .~ .- . .. .

I 1 S. Weiss MPC&D 97-006  ;

I

discusses replacing the Certified Fuel Handler training program with the ISFSI training  !

l program, after Rancho Seco's spent fuel is in dry storage.

l If you, or members of your staff, have questions requiring additional infonnation or ,

clarification, please contact Jerry Delezenski at (916)452-3211, extension 4914.

Sincerely,

, . a \) b l Steve J. Redeker "

Manager, Plant Closure and Decommissioning Attachment  ;

cc w/ attachments: NRC, Region IV, Arlington i R. Dudley, NRC, Rockville -l California Department of Health Services I i

i

(

i l

-)

l I

- - -_ _ ,,