Forwards Long-Term Defueled Condition Security Training & Qualification Plan. Encl Withheld (Ref 10CFR2.790)
ML20056B259
Person / Time
Site: Rancho Seco
Issue date: 08/20/1990
From: Keuter D
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AGM-NUC-90-217, NUDOCS 9008280016
Download: ML20056B259 (2)


Text

-

4..

3.* :

gi liSMUD N

" SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201'S Street. P.o, Box 15830. Secremento CA 95852 1830 (916) 452 3211'

,i AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA-b

'AGM/NUC 90-217-August 20, 1990 t

U. S. Nuclear Regulatory Commission Attn: l Document Control Desk-Hashington, DC 20555 Docket Ne. 'iG-312 -

Rancho Seco fluclear Generation Station License No DPR-54 LONG TERM DEFUELED CONDITION SECURITY TRAINING AND QUALIf';

1 PLAN

REFERENCES:

1.

D. Keuter (SMUD) letter to John Lart dated April 26,--1990, "Long Term Defueled Condit j Plan"

-Attention:.

John Larkins j

Pursuant to 10 CFR 73.50(a)(4) " Requirements physical protection of _

I licensed activities," the District hereby s'

..its the.Long Term Defueled Condition Security Training and-Qualification han and 10 CFR 50.54(p) analysis (Attachment 1).

The Long Term Defueled Condition Training and i

. Qualification-Plan is an adjunct to the previously submitted Long Term-4 Defueled. Condition Security Plan-(Reference 1), and follows the guidance in Regulatory Guide 1.86, June 1.974, and NUREG-0130, June 1978,.to the extent o

L applicable for a permanently shutdown, defueled facility.

Reference 1 previously analyzed radiological sabotage and determined that.the security requirements of.10 CFR 73.55 and Appendix B to Part 73 are no longer" applicable to Rancho Seco.

Since the Long Term Defueled Condition Security Training and Qualification Plan has been developed to support Reference 1 E

line item changes from the current Training and Qualification Plan, Revision 5, have not been individually addressed in the attached 10 CFR 50.54 (p) p analysis. The newly developed Training and Quailification Plan will become effective ~upon approval of the Long Term Defueled Condition Security Plan.

L Information contained in this Long Term Defueled Condition Security Training a

v and Qualification Plan addresses the specific training and qualification w[

requirements for security officers at Rancho Seco, and is' to be exempt from public disclosure under the provisions of 10 CFR 2.790.

l 9008280016 900e20 000C9 3@

l' PDR ADoCK 05000312 F

PDC RANCHO SECO NUCLEAR GENERATING STATloN O 1444o Twin Cities Road, Herald, CA 95638 9799;(209)333-2935 L

I

gN o

+

3. Larkins - AGM/NUC 90-217-Hembers of your staff who need information or clarification may contact Larry 2:

l

'Houghtby at (209) 333-2935 extension 4260..

Sincerely.

- (

N1 i

wv l

- Dan R. Keuter.

Assistant. General Manager

-Nuclear.