Requests Extension for Time Period Equivalent to That of Current Shutdown.Extension Would Result in Revised Final Expiration Date of Not Earlier than 900318.Plant Would Not Be Brought Above Cold Shutdown W/O NRC Prior Concurrence
ML20247G199
Person / Time
Site: Rancho Seco
Issue date: 09/11/1989
From: Keuter D
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Knighton G
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AGM-NUC-89-095, AGM-NUC-89-95, NUDOCS 8909180387
Download: ML20247G199 (3)


Text

_ _ _ - - - _ - _

i.

(,;Aq SMEJ c -

SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, P.o. Box 15830, Sacramento CA 958521830.(916) 452 3211 g

~

AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA AGM/NUC 89-095 September 11, 1989 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Hashington, DC 20555 Docket No. 50-312 Rancho Seco Nuclear Generating Station License No. DPR-54 EXEMPTION REQUEST TO 10 CFR 50.55a FOR THE REMAINING PORTION OF THE YEN YEAR-INSERVICE INSPECTION (ISI) EXAMINATIONS Attention: George Knighton' By letter dated October 6,1988, the District justified and requested a twenty-seven month extension to the 10-year ISI Program. Tf ; rationale for the extension was the 27-month outage (December 26, 1985 to Nrch 30, 1988) and the one year extension in accordance with ASME Section XI, IHA-2400(c).

The combination of the shutdowrt and the one year extension resulted in our request for a revised expiration date for the initial 10-year ISI inspection period. The Commission granted an expiration date for the initial 10-year ISI inspection period of September 18, 1989.

The plant entered cold shutdown on June 9, 1989 and will remain in cold shutdown for a minimum of six months. Because of this extended cold shutdown, the District requests an extension for a time period equivalent to that of the current shutdown, pursuant to INA-2400(c). This extension would result in a-revised final expiration date of not earlier than March 18, 1990. Attachment 1 lists the ISI inspections that remain to be performed in this 10-year inspection period. ' Attachment 2 lists the inspections we will perform by November 30, 1989.

While the plant is in cold shutdown there is minimal potential for a safety concern posed by deferring these ISI inspections, because the systems are maintained at low pressure and temperature when compared to their design conditions. Additionally, the plant will not be brought above cold shutdown without your prior concurrence regarding completion of the remaining inspections.

Members of your staff with questions requiring additional information or clarification may contact David Swank at (209) 333-2935, extension 4920.

Sincerely, e, S' Dan R. Keuter Assistant General Manager Nuclear 890918o387 890911 FDR ADOCK 05000312

  • PDC Attachment cc w/atch: J. B. Martin, NRC, Halnut Creek I L th A. D' Angelo, NRC, Rancho Seco V RANCHO SECO NUCLEAR GENERATING STATION D 14440 Twin Cities Road, Herald. CA 95638-9799;(2o9) 333-2935 L-- - __ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _

L ~.

.. . ,'[....

I I-

. ATTACHMENT 1 REMAINING FIRST 10-YEAR ISI INSPECTIONS ASME Section XI Reason For Item No. Description Exam Tvoe- Postponement Bl.3 Final'l/3 Held RV Head UT~ Inaccessible with To' Flange - Studs / Nuts in place Bl.8 Final 1/3 RV Studs UT Requires Reactor Vessel Head Stud removal

Bl.9 Ligaments Between RV UT No access unless Threaded Stud Holes Reactor Vessel Head is removed B.1.15 Vessel Internal Surfaces- VISUAL No access unless Reactor Vessel Head is removed B6.7** Three Internal Valve Bodies VISUAL Requires disassembly and would entail defueling for

. Decay Heat Drop Leg Valve B1.11 One CRDM Bolts & Huts VISUAL B.l.18 Thret . ids on One CRDM UT B2.B.1 Four Pressurizer Lugs UT (HX, XY, Y & YZ Axes)

    • NOTE: Decay heat is required for the present mode of operation.

Removal of both trains of decay heat is prohibited by the Rancho Seco Technical Specification 3.1.1.5.

l

, I

l ATTACHMENT 2 )

10-YEAR ISI INSPECTIONS TO BE COMPLETED BY NOVEMBER 30, 1989 I

1

'ASME Section XI Item No. Description Exam Tvoe

{

1 Bl.11 One CRDM Bolts & Nucs VISUAL  !

B.1.18 Three Helds on One CRDM UT B2.8.1 Tour Pressurizer t.ugs UT (HX, XY, Y & YZ Axes)