ML20129D506

From kanterella
Jump to navigation Jump to search
Informs of Decision to Replace Current Health Physics Network (HPN) Telephone Sys W/Dedicated Commercial Circuits. Priority Order,In Which Commercial HPN Svc Will Be Installed,Listed
ML20129D506
Person / Time
Site: Palisades, Big Rock Point, 05000000
Issue date: 07/11/1985
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8507160555
Download: ML20129D506 (2)


Text

w c... 3_

c 0-_.'

g 3 3 g.  ;- -

.. s

- .c j ' Docket No.-50-155 /g f Docket No. 50-255~ '

[ f/ ,

i - ,

i Consumers Power Company .

-f  ;

o ATTN: Mr. R. B. DeWitt "

Vice President Nuclear Operations M , v- , .;

212 West Michigan Avenue -

! Jackson, MI 49201

. 8 Gentlemen: -

l.

L Forthepastseveralyears,NRCHeadquartershasbeenworkingtoprovidEa l Health Physics. Network (HPN) that will operate reliably. We are now convinced i' that the current system cannot be made to operate to our satisfaction.

Therefore, a decision has been made to replace the current HPN telephorie system with dedicated commercial circuits. In order to increase the probability of being available in an emergency, each of the replacement HPN commercial

, circuits will be routed through an exchange at a telephone company Central Office different from.the office that~the facility's circuits are routed through. -

Existing HPN service is currently installed, or ordered to be installed, in the EOF, TSC, Health Physics Office and NRC Resident Inspector's Office. .The

! new system will be located only in the EOF and TSC, and will be removed from

the Health Physics Office and the Resident-Inspector's Office where currently i installed.~ In order to make these changes, telephone company personnel will

! need access to'all HPN extensions currently installed _and any locations in the EOF and TSC where an HPN extension was to be located ,but is not yet installed.

~

The following is the priority order,in which we will ,have commercial HPN' service installed. -

- 1. Install commercial service at those facilities where no HPN service exists.

2. Install commercial service at those facilities where no HPN service exists
.in the EOF but does in the TSC.

p i' 3. Install commercial service at those facilities where no HPN service exists l in the TSC but does in the E0F.

i~ '4. Replace existing HPN special circuitry with commercial service at those facilities that currently have HPN special circuitry. Replacement service will be in the EOF and TSC, only.1 All other locations are to be removed.

, ( i r a

\ ,

~~ '

< h' $, ' '

0507160555 050711 +

( 0j

! PDR ADOCK 05000155 ,.

F PDR r. ,

s !.

Consumers Power Company. 2 More definitive, plant-by plant schedules will be forthcoming when the dates for changes in service are known.

Should you have any questions or need further information Ms. Linda Kers, Emergency Response Coordinator, is the Regional point of contact for assuring coordination between your facilities and the telephone companies. She may be reached on (312) 790-5711.

Sincerely, ft

. A. Hind, Director Division of Radiation Safety and Safeguards cc: D. J. VandeWalle, Director Nuclear Licensing D. P. Hoffman, Plant Superintendent J. F. Firlit, General Manager DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission Nuclear Facilities and Environmental Monitoring Section RIII RIII [] RIIT RII R f

r d

Cyl' M (

Norel us ind Phil]1Lps Papgelfl '1

  • 02/85 ygS  ? ///JJ' T