July 30, 1998
SUBJECT:
PALISADES INSPECTION REPORT 50-255/98010(DRP) AND NOTICE OF VIOLATION
Dear Mr. Palmisano:
On July 1,1998, the NRC completed an inspection conducted from May 7 through July 1,1998,
. at your Palisades Nuclear Generating Plant. The areas examined during the inspection are identified in the enclosed report. The inspectors noted improved performance, as compared to past refueling outages, pertaining to the implementation of your switching and tagging order program. Operator performance was also good, including good compliance with the shutdown operations plan during the outage. During the inspection period, a misalignment of a single control rod occurred during low power physics testing. While the rod misalignment exceeded procedural requirements, the consequences of the rod misalignment were minor. Nonetheless, the incident was significant because operators are required to perform self-checking during the conduct of a reactivity manipulation. A secondary issue with the event was the recurrence of a problem with the Primary Rod Position Indication System (PIP).' The problem with the PIP delayed the receipt of the four inch and eight inch deviation alarms.
Based on the results of this inspection, the NRC determined that a violation of NRC requirements occurred regarding inadequate equipment control. The violation is of concern because it
involved proper plant configuration not being maintained while filling the safety injection tank bottles, and the establishment of a flow path allowing approximately 1200 gallons of water to be pumped from the refueling cavity to the containment sump with the shutdown cooling system in operation.
_
This violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding the violation is described in detail in the enclosed re sort. You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response.= The NRC will use your response, in part, to determine whether further
. enforcement action is necessary to ensure compliance with regulatory requirements.
l f
)
I f
!
,
!
i 9908040098 990730 M
,
'
p PDR ADOCK 05000255 ;
j i
G PDR g i
I
_ _ -
_ _,
-
._
_ _ _ _ - _ _ _ - _ - _ _ _ - _ - _ _ _ _
___-_
_ _ _ - _ - - -
-
.
l
..
\\ In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
'
original signed by Geoffrey E. Grant, Director Division of Reactor Projects Docket No.: 50-255 License No.: DPR-20 Enclosures:
1.
Inspection Report
50-255/98010(DRP)
cc w/encis:
Robert A. Fenech, Senior Vice
President, Nuclear, Fossil
and Hydro Operations
Nathan L. Haskell, Director
Licensing
Richard Whale, Michigan
Public Service Commission
Michigan Department of
Environmental Quality
Department of Attomey General (MI)
Emergency Management
Division, Mi Department
of State Police
DOCUMENT NAME: R:\\insprpts\\ powers \\ pali \\ pal 98010.drp
To seconve e copy of this document,indeste in the hos *C" = Copy m4thout attoclesnentlenciosuse *E' = Copy evith attachmentleneloeuse
"N* = No oesy
OFFICE
Rill,,,
$
Rlll
A(
Rill
Rlli
NAME
SchMnz\\ml
BurgNh
Grant g
DATE
0792/98
07bl6/98
07@/9h[
OFFICIAL RECORD COPY
N
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ - _ _ _
..
..
'. Distribution:
CAC (E-Mail)
Project Mgr., NRR w/encls
C. Paperiello w/encls
J. Caldwell w/encls
B. Clayton w/encls
SRI Palisades w/encls
DRP w/encls
TSS w/encls
DRS (2) w/encls
Rlli FRR w/encls.
PUBLIC IE-01 w/encls
Docket File w/encls
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
l
'
e
l,
.
I
i
_
.
.
_
1