ML20236K827

From kanterella
Jump to navigation Jump to search
First Partial Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl
ML20236K827
Person / Time
Site: Peach Bottom, Palisades, Point Beach, Arkansas Nuclear, 07201007  Constellation icon.png
Issue date: 06/30/1998
From: Racquel Powell
NRC OFFICE OF ADMINISTRATION (ADM)
To: Dums D
CITIZENS' UTILITY BOARD
Shared Package
ML20236K829 List:
References
FOIA-98-188, RTR-NUREG-CR-5965, RTR-NUREG-CR-5985 NUDOCS 9807100097
Download: ML20236K827 (4)


Text

h/ l> 00 CC NRC FORM 464 Part i U.S. NUCLEAR REGULATORY COMMISSION RESPONSE NuMIER

" [ neo %

FOIAIPA 98-188 1

RESPONSE TO FREEDOM OF 5

INFORMATION ACT (FOIA) / PRIVACY

RESPONSE

ACT (PA) REQUEST TYPE b "^

YJ

  • e.<*

1 REQUEST ER DATE Dennis Dums I' E PART l. -INFORMATION RELEASED (See checked boxes)

] No additional agency records subject to the request have been located.

] Requested records are available through another public distribution program. See Comments section.

APPENDICES O

Agency records subject to the request that are identified in the listed appendices are already available for public inspection and copying at the NRC Public Document Room.

APPENDICES Agency records subject to the request that are identified in the listed appendices are being made available for A

public inspection and copying at the NRC Public Document Room.

]- Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, NW, Washington, DC.

ty APPEN0 ices h/j Agency records subject to the request are enclosed.

A El Rec rds subje t t the request that ntain inf rmati n rigin ted by r finterest t an ther Federal agency have been referred to that agency (see comments section) for a disclosure determination and direct response to you.

Q We are continuing to process your request.

] This completes NRC's action on your request.

l PART 1.A - FEES p

h ouNf'

~~

You will be billed by NRC for the amount listed.

] None. Minimum fee threshold not met.

I j/ '

] You will receive a refund for the amount listed.

Fees waived.

g. c PART l.B -INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE i

] No agency records subject to the request have been located.

]~~

Certairs information in the requested records is being withheld from disclosure pursuant to the exemptions described in and for ttm reasons stated in Part II.

This determination may be appealed within 30 days by writing to the FOIA/PA Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Clearly state on the envelope and in the letter that it is a "FOIA/PA Appeal."

PART l.C COMMENTS (Use attached Comments continuation page if required)

A

/,A /

s s

t c= o"'cta 9007100097 980630 PDR FOIA DUMS98-180 PDR NRC FORM 464 Part 1 (3-1998)

PRINTED ON RECYCLED PAPER This form was designed using informs C

/ b 0 'I/0 C O {} l

+.

l l

FOIA-98-188 APPENDIX A RECORDS BEING RELEASED IN THEIR ENTIRETY HQ DATE DESCRIPTION (PAGE COUNT) 1.

04/27/98 E-mail Update on the VSC-24 Weld issues (pp 2) 2.

04/27/98 Talking Points for WFK Meeting (pp 2) 3.

04/24/98 E-mail VSC-24 UT Inspection Update (pp 2) 4.

04/22/98 tof-pali.xis (pp 6) 5.

04/21/98 Sheet 1 tof-data.xis (pp 4) 6.

04/17/98 SNC UT inspection Plan (pp 2) 7.

04/16/98 UT Test 2.xis (pp 3) 8.

04/15/98 E-mail Evaluation of NDE Capability for Storage Casks - Forwarded (pp 5) 9.

04/15/98 E-mail P-scan and TestPro (pp 3)

-]

10.

04/13/98 E-mail Evaluation of NDE Capability for Storage Casks (pp 4) 11.

04/08/98 E-mail Current inspection Schedule (pp 2) 12.

04/01/98 E-mail Here is the Latest (pp 4) j 13.

04/01/98 E-mail Data from P-Scan Demo (pp 5) 14.

04/01/98 E-mail NRC Demo Data (pp 6) 15.

04/01/98 E-mail Confidence latervals (pp 5)

I 16.

03/31/98 UT-Testi.xis (pp 2) 17.

03/31/98 E-mail EXCEL Chart (pp 4) 18.

03/26/98 E-mail VSC-24 Weld issues Status (pp 5) 19.

03/26/98 Structural integrity Associates, Inc. (pp 13) 20.

03/23/98 E-mail Inspection Report Format (pp 17) 21.

03/12/98 E-mailinspection Plan (pp 4) 22.

03/11/98 E-mail 72.48 at ANO (pp 2)

I 23.

03/11/98 E-mail Update inspection Plan (pp 4) 24 03/10/98 F-mailInspection Plan (pp 4) 25.

03/09/98 E-mail VSC-24 UT Inspection 3/16/98 (pp 3) 26.

03/06/98 E-mail Latest on VSC-24 UT (pp 3)

)

27.

03/06/98 E-mail Latest VSC-24 UT Issues (pp 2) 28.

03/05/98 E-mail Today's questions - FYi(pp 3) 29.

03/05/98 E-mail Draft Call Summary (pp 3) 30.

03/04/98 E-mail Near Field Effects (pp 4) 31.

03/04/98 E-mail VSC-24 UT Procedure (pp 2) 32.

03/04/98 E-mail RE: Near Field Effects - Reply (pp 3) 33.

03/04/98 E-mail Near Field Effects - Reply (pp 2)

I

I 2

M QM,E DESCRIPTION (PAGE COUNT) 34.

03/03/98 E-Mail UT-Issues - Questions (pp3) 35.

03/03/98 E-mail P-scan information (pp 3)

36. -

03/02/98 E-mail UT-Issues - Phone Call (pp 2) 37.

02/24/98 E-mail More on Grinding the Weld Crown (pp 2) 38.

02/23/98 E-mailInspection Postponed!!(pp 2) 39.

02/23/98 E-mail FYl-SNC Inspection at ANO Postponed (pp 2) 40.

02/23/98 E-mail RE: Discussion on Grinding the Weld Crown (pp 3) 41.

02/19/98 -

E-mail inshection PlanningsNew Time (pp 2)

' 42.

02/17/98 E-mail Schedules (pp 3) 43.

02/16/98 E-mail Conference Call Cuttoff (pp 3)

~

44.

02/16/98 E-mail Update on P-Scan Hardware (pp 3) 45.

02/13/9u E-mail Responses from Steve Doctor on UT Questions (pp 2) 46.

02/13/98 E-mail Update on P-scan Hardware (pp 2) 47, 02/12/98 E-mail Conference Call Cutoff (pp 2) 48.

02/11/98 Sumrnary of NUREG/CR-5985...(pp 5) 49.

02/06/98 E-mail SNC Phone Calls (pp2) 50.

01/30/98 E-mailitems FYi(pp 3) 51.

01/28/98 E-mail Schedule for Palisades Flawed Mockup (pp 3) 57..

01/26/98 E-mail item of Interest - FlawTech (pp 3) 53.

01/08/98 E-mail EPRI is helping the VSC-24 Owners Group (pp 1) 54.

undated VSC-24 Owners Group Welding Guidelines for MSB Material Toughness Testing

)

(pp 3) 55.

undated VSC-24 Structural Lid Weld - Mockup 2 (pp 1) 56.

undated For Reasonable Assurance in UT (pp 4)

[

57.

undated Tip-to-Backwall Depth Sizing - All Data Sets (pp 3) 58.

undated Depth Regressicn - Lateral Sizing (Painted) (pp 12) 59.

4/20/98 E-Mail from Kobetz,

Subject:

VSC-24 CAL Closeouts (2 pp) 60.

4/23/98

. E-Mail from Kobetz,

Subject:

Update on VSC-24 UT inspection (2 pp) -

1 61.

. 4/24/98 E-Mail from Kane,

Subject:

VSC-24 UT Inspection Update Forwarded (1 pp) 62.

5/12/98 E-Mail from Kobetz,

Subject:

VSC-24 Status (2 pp) 63.

1/14/98 E-Mail from Hackett,

Subject:

VSC-24 (1 pp) 64.

11/24/97 E-Mail from Hackett,

Subject:

Use of PNNL for Dry Cask issues (1 pp) 65.

4/24/98 E-Mail from Leeds,

Subject:

VSC-24 UT Inspeciton Update (1 pp)

I i

l- ---

1 i

s

!- NCL DATE DESCRIPTION /(PAGE COUNT) 66.

2/3/98 Note to Leeds and Sturz from Kobetz and Howe.

Subject:

Minutes from the January 28,1998 Weld Team Meeting (1 pp) 67.

3/18/98 Letter to Haughney from Shillinglow (4 pp) 68.

Undated

~ Memorandum to Howe from Parkhill and Battige,

Subject:

Flawtech Trip Report (3 pp) 69.

12/17/97 Ltr to Kobetz from Moeckel with enclosure (78 pp) 70.

11/26/97 Ltr to Kobetz from Moeckel with enclosure (81 pp) l e

4 I

m_______1_________________1___________.__._____

_ _ _ _ _ _