JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS MAY, 1985 The cycle VI-VII refueling outage continued into the month of May. The unit was returned to service on May 27.

The following major safety-related maintenance was performed in the month of May:

! 1. Miscellaneous corrective and preventive maintenance was ,

performed on the diesel generators. '

]

2. Eddy _ current examinations were performed on tubes in the IB steam ,

generator. No tubes were found to exceed the pluggable limit.

3. The anti-vibration bar (AVB) replacement in the IB steam generator '

was completed.

4. An 0-ring leak on the IC reactor coolant pump seal housing was repaired.

i

5. The removal, inspection and replacement of the containment vertical tendons is continuing with six vertical tendons remaining

-to be worked. Three vertical tendon anchors with cracks have been identified.

  • 8506240041 850531 s-PDR ADOCK 05000340 e 6 R PEWt

,r

(

I m

m --+ , ,

OPERATING DATA REPORT

[] DOCKET NO.

'50-340 DATE 6-7-85 J. D. Woodard 4

COMPLETED BY

. TELEPHONE (205)89 7- 5156 OPERATING STATUS N

( l. Unit Name: J seph M. Farlev - Unit 1

2. Reporting Pened: May, 1985 1) Cumulative data since
3. Licensed Thermal Power (31Wt):

2652 12-1-77, Cate of conunerciaL 860 operation.

4. Nameplate Rating (Gross 31We):

829

5. Design Electrical Rating (Net MWel:
6. Maximum Dependable Capacity (Gross 31We):

860.9

7. Maximum Dependable Capacity (Net 31We):

816.5

)

3. If Changes Occur in Capacity Ratings litems Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Lesel To Which Restricted,If Any (Net 31We): N/A
10. Reasons For Restnetions. If Any: N/A

! This Month Yr to Date Cumularise 744 3,623 65,735 i1. Hours in Reporting Period 137.5 2,404.9 44,533.9

12. Number Of Hours Reactor Was Critical u.o 0.0 3,650.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 94.6 2,315.9 43.340.3 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 85,286 5,878,489 109,779,064
16. Gross Thermal Ener;v Generated (MWH) 19,130 1,895,290 34,989,604
17. Gross Electrical Energy Generated IMWH)
7. U U l /50./32 32,909,778
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 12.7 63.9 65.9

"*#- D -

65.9

20. Unit Availability Factor 1.2 60.2 62.7
21. Unit Capacity Factor (Using MDC Nett
22. Unit Capacity Factor iUsing DER Net) 1.2 59.3 60.4
23. Unit Forced Outage Rate 0.0 2.7 12.7
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each):

N/A

25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A

) 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed 08-06-77 08-09-77 INIT IA L CRITICALITY

! INITIAL ELECTRICITY 08-20-77 08-18-77 12-01-/7 12-01-77

COMMERCIAL OPERATION mm

DOCKET.NO. - .so- m I

UNIT DATE 6-7-85 i

CO.\fPLETED BY i D Wattar<l O

v TELI?!!ONE M99 Moo-9196 4

StCNT11 May, 1985 DAY AVERACE DA:LY F0 Weit LEVEL DAY AVER ACE D AILY POWER LEVEL t.'.t h e-Ne t ) (.\tWe Net) 0 g7 0 1

2 0 13 0 '

3 0 -

g9 0 4 0 ;g 0 5 0 21 o 0 0 I 6 n l 7 0 y 0 s

0 :4 0 0 0 7 3-0 10 n 26 0 11 0 7 23 g, 0 .. g7 j 13 0 ;7 178-0 179 14 30 15 0 3g 210

. 16 0 CGTRt CONS On this form:t.'ist the 2ver:;; d:ily unit power levet in . '!We Net for e:ch c:y in the reporting snunih. Campute to

, tr.c cc:re:t shuie me;: watt.

O l'

l l

~

p -

%J '

- m.)

DOCKET NO 5'0-348 UNITSilll1 DOWNS ANI' POWl:R HliDilCllONS gj gg agggj J.M.Farley-Unit 1 DAIE 6-7-D HI PORI klONill BaL_1261.- COMPl.E ~Ilill ilY -J.D. Woodard 1 Eg.g 3.ggong; (205)899-5156~

s:

No. Date g

.$E 3g "g jN'5 I.itcusee [ s, y*8 l, Cause & Concosive

2sy  !!sent g 'l Atison to f= y

<$=? Itegunt u va' u {U o Voocus Hecussence u 6 002 850501 S 638.4 C N/A 1 N/A N/A The Cycle VI-VII refueling outage continued from 4-6-85. 003 850528- S 11.0 B 4 N/A N/A N/A Turbine Overspeed trip test;

                                 =                                                                                                            maintenance testing.

v i 2 3 14 l'ussed 4 itenon: hicehod: S: S,l.edukd A Equipnicne Iailure(Explain) lialubis G - Instinctions 1 Alanual for P4cpasannen of Data is hiaintenance of Tes 2 klanual Sciam. 1:nisy Shecis (os I i ensee C-Hefueling 3 Autonulic Scram. D llegulai ny itesisitsinn Esen Repois (i Elt)l'ik gNtillEG-4 04hes (linplain) 0161I i -Opciator Isaining & Ikenic Ex4:nsuaison I Adsiniinistissive 5 15 Opc8JilaHadi I;8f ul lI 4fIal48) (9/n) ll Ot hei (E xplain) Ifibibl: I

  • bJme bonfie
 . Mamng Address

. Alatcm2 Power Company 6'O North 18th Street Post Off:ce Box 2641 6:rmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintndge Du ! ding / Milk)[llllil!OWCf June 12, 1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the May 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. If you have any questions, please advise. Yours very t ly,

                                                                 )                  ,

p R. P. Mcdonald RPM /KWM: sam Enclosures . xc: Director, IE (10 copies) Director, RII (1 copy) 7 d

                                                                                                    \
                                                                      .                           t}}