JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS MAY, 1985 The cycle VI-VII refueling outage continued into the month of May. The unit was returned to service on May 27.
The following major safety-related maintenance was performed in the month of May:
1.
Miscellaneous corrective and preventive maintenance was
]
performed on the diesel generators.
2.
Eddy _ current examinations were performed on tubes in the IB steam generator. No tubes were found to exceed the pluggable limit.
3.
The anti-vibration bar (AVB) replacement in the IB steam generator was completed.
4.
An 0-ring leak on the IC reactor coolant pump seal housing was repaired.
i 5.
The removal, inspection and replacement of the containment vertical tendons is continuing with six vertical tendons remaining
-to be worked. Three vertical tendon anchors with cracks have been identified.
8506240041 850531 s-PDR ADOCK 05000340 e
6 R
PEWt
,r
(
I m
--+,
m
OPERATING DATA REPORT
[]
'50-340 DOCKET NO.
DATE 6-7-85 4
COMPLETED BY J. D. Woodard TELEPHONE (205)89 7-5156 OPERATING STATUS N
(
- l. Unit Name: J seph M. Farlev - Unit 1 May, 1985
- 1) Cumulative data since
- 2. Reporting Pened:
2652
- 3. Licensed Thermal Power (31Wt):
12-1-77, Cate of conunerciaL 860
- 4. Nameplate Rating (Gross 31We):
operation.
829
- 5. Design Electrical Rating (Net MWel:
860.9
- 6. Maximum Dependable Capacity (Gross 31We):
816.5
)
- 7. Maximum Dependable Capacity (Net 31We):
- 3. If Changes Occur in Capacity Ratings litems Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Lesel To Which Restricted,If Any (Net 31We):
N/A N/A
- 10. Reasons For Restnetions. If Any:
This Month Yr to Date Cumularise 744 3,623 65,735 i1. Hours in Reporting Period 137.5 2,404.9 44,533.9
- 12. Number Of Hours Reactor Was Critical u.o 0.0 3,650.0
- 13. Reactor Reserve Shutdown Hours 94.6 2,315.9 43.340.3
- 14. Hours Generator On-Line 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 85,286 5,878,489 109,779,064
- 16. Gross Thermal Ener;v Generated (MWH) 19,130 1,895,290 34,989,604
- 17. Gross Electrical Energy Generated IMWH)
- 7. U U l /50./32 32,909,778
- 18. Net Electrical Energy Generated (MWH) 12.7 63.9 65.9
- 19. Unit Service Factor D
65.9
- 20. Unit Availability Factor 1.2 60.2 62.7
- 21. Unit Capacity Factor (Using MDC Nett 1.2 59.3 60.4
- 22. Unit Capacity Factor iUsing DER Net) 0.0 2.7 12.7
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each):
N/A
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
)
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed 08-06-77 08-09-77 INIT IA L CRITICALITY INITIAL ELECTRICITY 08-20-77 08-18-77 12-01-/7 12-01-77 COMMERCIAL OPERATION mm
-.so-m DOCKET.NO.
I UNIT 6-7-85 DATE i
CO.\\fPLETED BY i D Wattar<l O
v TELI?!!ONE M99 Moo-9196 4
StCNT11 May, 1985 DAY AVERACE DA:LY F0 Weit LEVEL DAY AVER ACE D AILY POWER LEVEL t.'.t h e-Ne t )
(.\\tWe Net) 0 0
1 g7 2
0 13 0
3 0
g9 0
0 0
4
- g 5
0 21 o
I 0
0 6
n l
7 0
y 0
0 0
s
- 4 0
7 0
3-0 10 n
26 0
23 11 0
7 g,
0 g7 j
13 0
- 7 178-0 14 30 179 210 15 0
3g 16 0
CGTRt CONS On this form:t.'ist the 2ver:;; d:ily unit power levet in. !We Net for e:ch c:y in the reporting snunih. Campute to
, tr.c cc:re:t shuie me;: watt.
O l'
l l
~
p
- m.)
%J 5'0-348 UNITSilll1 DOWNS ANI' POWl:R HliDilCllONS DOCKET NO gj gg agggj J.M.Farley-Unit 1 6-7-D DAIE COMPl.E ~Ilill ilY -J.D. Woodard HI PORI klONill BaL_1261.-
1 Eg.g 3.ggong; (205)899-5156~
s:
.$E "g
jN'5 I.itcusee
[ s, y*8 l,
Cause & Concosive No.
Date g
3g 2sy
!!sent g 'l
{U Atison to f=
y<$= Itegunt u va' u o Voocus Hecussence ? u 6 002 850501 S 638.4 C 1 N/A N/A N/A The Cycle VI-VII refueling outage continued from 4-6-85. 003 850528-S 11.0 B 4 N/A N/A N/A Turbine Overspeed trip test; maintenance testing. = v i 2 3 4 14 l'ussed itenon: hicehod: lialubis G - Instinctions S: S,l.edukd A Equipnicne Iailure(Explain) 1 Alanual for P4cpasannen of Data is hiaintenance of Tes 2 klanual Sciam. 1:nisy Shecis (os I i ensee C-Hefueling 3 Autonulic Scram. Esen Repois (i Elt)l'ik gNtillEG-D llegulai ny itesisitsinn 4 04hes (linplain) 0161I i -Opciator Isaining & Ikenic Ex4:nsuaison I Adsiniinistissive 5 15 Opc8JilaHadi I;8f ul lI 4fIal48) Ifibibl: I
- bJme bonfie (9/n) ll Ot hei (E xplain)
Mamng Address Alatcm2 Power Company 6'O North 18th Street Post Off:ce Box 2641 6:rmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintndge Du ! ding / Milk)[llllil!OWCf June 12, 1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the May 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications. If you have any questions, please advise. Yours very t ly, ) p R. P. Mcdonald RPM /KWM: sam Enclosures xc: Director, IE (10 copies) Director, RII (1 copy) d 7 \\ t .}}