MONTHYEARML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20202G4211998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198L6191997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20203F6391997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198T4151997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Jm Farley Nuclear Plant ML20211N7221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20216J3151997-08-31031 August 1997 Monthly Operating Repts for August 1997 for Jfnp ML20210K5981997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20141H3191997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Joseph M Farley Nuclear Plant Units 1 & 2 ML20148K6081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Joseph M Farley Nuclear Plant ML20141E3121997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20137T1841997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20136G4731997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2 ML20138K5881997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20133F4791996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20132C0631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20134K7141996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20128Q1161996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Jm Farley Nuclear Plant,Units 1 & 2 ML20117M1291996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20115D6821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20117M2721996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20111D1401996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Jm Farley Plant Units 1 & 2 ML20101R6271996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Jm Farley Nuclear Plant ML20106H0791996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant ML20097D5651996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant ML20096C0921995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Jm Farley Nuclear Plant Units 1 & 2 ML20095E9451995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Joseph M Farley Nuclear Plant ML20094L3071995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Jm Farley Nuclear Plant ML20093E6441995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Jm Farley Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20211B8931999-08-17017 August 1999 Safety Evaluation Supporting Amend 143 to License NPF-2 ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With 05000364/LER-1999-001-05, :on 990621,plant Was Manually Tripped Due to Decreasing Vacuum in Condenser.Caused by Broken Steam Dump Drain Line.Broken Section of Line Was Repaired & Licensee Will Implement Addl Design Change1999-07-0202 July 1999
- on 990621,plant Was Manually Tripped Due to Decreasing Vacuum in Condenser.Caused by Broken Steam Dump Drain Line.Broken Section of Line Was Repaired & Licensee Will Implement Addl Design Change
ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With 05000348/LER-1999-002-02, :on 990527,Unit 1 Reactor Trip Occurred Following Loss of 1A SG Feedwater Pump.Caused by Personnel Error.Unit Was Stabilized in Hot Standby.With1999-06-25025 June 1999
- on 990527,Unit 1 Reactor Trip Occurred Following Loss of 1A SG Feedwater Pump.Caused by Personnel Error.Unit Was Stabilized in Hot Standby.With
L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206L4551999-05-10010 May 1999 Safety Evaluation Supporting Amends 142 & 134 to Licenses NPF-2 & NPF-8,respectively ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D4391999-03-31031 March 1999 Unit-1 1999 Voltage-Based Repair Criteria 90-Day Rept ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203J0631999-02-19019 February 1999 Safety Evaluation Supporting Amends 107 & 85 to Licenses NPF-2 & NPF-8,respectively ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With 05000348/LER-1998-008-01, :on 981223,reactor Vessel Support Concrete Design Bases Temperature Exceeded Due to Closed Cooling Damper.Caused by Personnel Error.Damper Opened & Secured in Position.With1999-01-18018 January 1999
- on 981223,reactor Vessel Support Concrete Design Bases Temperature Exceeded Due to Closed Cooling Damper.Caused by Personnel Error.Damper Opened & Secured in Position.With
ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With 05000348/LER-1998-007-02, :on 981106,found Several TSP Circumferential Indications & Several TSP Axial Indications Extending Just Beyond Edge of Tsp.Caused by Tube Defects.Sg Tubes Have Been Plugged or Repaired as Required1998-12-22022 December 1998
- on 981106,found Several TSP Circumferential Indications & Several TSP Axial Indications Extending Just Beyond Edge of Tsp.Caused by Tube Defects.Sg Tubes Have Been Plugged or Repaired as Required
05000348/LER-1998-006-03, :on 981124,PRF Sys Suction Damper Was Outside Design & Licensing Basis.Caused by 1976 Personnel Failure to Identify Noted Inconsistency.Scheduled Design Change in 1999 to Modify Dampers to Ensure Licensing Basis Are Met1998-12-18018 December 1998
- on 981124,PRF Sys Suction Damper Was Outside Design & Licensing Basis.Caused by 1976 Personnel Failure to Identify Noted Inconsistency.Scheduled Design Change in 1999 to Modify Dampers to Ensure Licensing Basis Are Met
ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 05000364/LER-1998-007-01, :on 981116,ESF Actuation Occurred During DG 1000 Kw Load Rejection Test.Caused by Poor Jumper Electrical Connection.Improved Jumpers Will Be Used on Appropriate Terminals in Load Rejection Test Procedures.With1998-12-11011 December 1998
- on 981116,ESF Actuation Occurred During DG 1000 Kw Load Rejection Test.Caused by Poor Jumper Electrical Connection.Improved Jumpers Will Be Used on Appropriate Terminals in Load Rejection Test Procedures.With
ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 05000348/LER-1998-005-03, :on 981021,automatic Start of B Train Penetration Room Filtration Occurred Due to Filling Sf Tc. Caused by Inadequate Procedure.Changed Procedure to Provide Specific Guidance for Filling SFP Tc.With1998-11-12012 November 1998
- on 981021,automatic Start of B Train Penetration Room Filtration Occurred Due to Filling Sf Tc. Caused by Inadequate Procedure.Changed Procedure to Provide Specific Guidance for Filling SFP Tc.With
ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 NUREG-1407, Safety Evaluation Accepting IPEEE for Severe Accident Vulnerabilities,Per GL 88-20 & NUREG-14071998-10-0101 October 1998 Safety Evaluation Accepting IPEEE for Severe Accident Vulnerabilities,Per GL 88-20 & NUREG-1407 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change 05000348/LER-1998-004-03, :on 980909,turbine Trip & Consequent Reactor Trip Occurred.Caused by Reactor Protection Sys Card Failure. Failed Card Was Replaced & Unit 1 Returned to Power on 980910.With1998-09-28028 September 1998
- on 980909,turbine Trip & Consequent Reactor Trip Occurred.Caused by Reactor Protection Sys Card Failure. Failed Card Was Replaced & Unit 1 Returned to Power on 980910.With
05000348/LER-1998-003-04, :on 980816,determined That Wgdt Hydrogen & Oxygen Had Exceeded Concentration Limits,Per TS 3.11.2.5. Caused by Undetected Leak.Leak Was Identified & Isolated & Waste Gas Sys Was Returned to Svc on 980818.With1998-09-11011 September 1998
- on 980816,determined That Wgdt Hydrogen & Oxygen Had Exceeded Concentration Limits,Per TS 3.11.2.5. Caused by Undetected Leak.Leak Was Identified & Isolated & Waste Gas Sys Was Returned to Svc on 980818.With
05000348/LER-1997-003, :on 970315,determined That TS SR 4.5.3.2 Had Not Been Performed,Per Operating Procedure.Caused by Personnel Error.Verified That RHR Discharge to Charging Pump Suction MOVs 8706A & 8706B Were Closed.With1998-09-0808 September 1998
- on 970315,determined That TS SR 4.5.3.2 Had Not Been Performed,Per Operating Procedure.Caused by Personnel Error.Verified That RHR Discharge to Charging Pump Suction MOVs 8706A & 8706B Were Closed.With
05000348/LER-1998-005, :on 980315,failure to Perform Nuclear Instrumentation Surveillance Requirements Prior to Mode 2 & 3 Entry,Was Discovered.Caused by Personnel Error.Revised Applicable Procedures1998-09-0303 September 1998
- on 980315,failure to Perform Nuclear Instrumentation Surveillance Requirements Prior to Mode 2 & 3 Entry,Was Discovered.Caused by Personnel Error.Revised Applicable Procedures
05000348/LER-1998-002-05, :on 980816,SG Tube Leakage Investigation,Repair & Evaluation,Occurred.Caused by ODSCC in Two Locations on Same Tube.Operational Leak Rate Limit Requiring Plant Shutdown Has Been Administratively Reduced1998-09-0303 September 1998
- on 980816,SG Tube Leakage Investigation,Repair & Evaluation,Occurred.Caused by ODSCC in Two Locations on Same Tube.Operational Leak Rate Limit Requiring Plant Shutdown Has Been Administratively Reduced
ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept 1999-09-30
[Table view] |
Text
__
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS MAY, 1985 The cycle VI-VII refueling outage continued into the month of May. The unit was returned to service on May 27.
The following major safety-related maintenance was performed in the month of May:
! 1. Miscellaneous corrective and preventive maintenance was ,
performed on the diesel generators. '
]
- 2. Eddy _ current examinations were performed on tubes in the IB steam ,
generator. No tubes were found to exceed the pluggable limit.
- 3. The anti-vibration bar (AVB) replacement in the IB steam generator '
was completed.
- 4. An 0-ring leak on the IC reactor coolant pump seal housing was repaired.
i
- 5. The removal, inspection and replacement of the containment vertical tendons is continuing with six vertical tendons remaining
-to be worked. Three vertical tendon anchors with cracks have been identified.
- 8506240041 850531 s-PDR ADOCK 05000340 e 6 R PEWt
,r
(
I m
m --+ , ,
OPERATING DATA REPORT
[] DOCKET NO.
'50-340 DATE 6-7-85 J. D. Woodard 4
COMPLETED BY
. TELEPHONE (205)89 7- 5156 OPERATING STATUS N
( l. Unit Name: J seph M. Farlev - Unit 1
- 2. Reporting Pened: May, 1985 1) Cumulative data since
- 3. Licensed Thermal Power (31Wt):
2652 12-1-77, Cate of conunerciaL 860 operation.
- 4. Nameplate Rating (Gross 31We):
829
- 5. Design Electrical Rating (Net MWel:
- 6. Maximum Dependable Capacity (Gross 31We):
860.9
- 7. Maximum Dependable Capacity (Net 31We):
816.5
)
- 3. If Changes Occur in Capacity Ratings litems Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Lesel To Which Restricted,If Any (Net 31We): N/A
- 10. Reasons For Restnetions. If Any: N/A
! This Month Yr to Date Cumularise 744 3,623 65,735 i1. Hours in Reporting Period 137.5 2,404.9 44,533.9
- 12. Number Of Hours Reactor Was Critical u.o 0.0 3,650.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 94.6 2,315.9 43.340.3 0.0 0.0 0.0
- 15. Unit Reserve Shutdown Hours 85,286 5,878,489 109,779,064
- 16. Gross Thermal Ener;v Generated (MWH) 19,130 1,895,290 34,989,604
- 17. Gross Electrical Energy Generated IMWH)
- 7. U U l /50./32 32,909,778
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 12.7 63.9 65.9
"*#- D -
65.9
- 20. Unit Availability Factor 1.2 60.2 62.7
- 21. Unit Capacity Factor (Using MDC Nett
- 22. Unit Capacity Factor iUsing DER Net) 1.2 59.3 60.4
- 23. Unit Forced Outage Rate 0.0 2.7 12.7
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each):
N/A
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
) 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed 08-06-77 08-09-77 INIT IA L CRITICALITY
! INITIAL ELECTRICITY 08-20-77 08-18-77 12-01-/7 12-01-77
- COMMERCIAL OPERATION mm
DOCKET.NO. - .so- m I
UNIT DATE 6-7-85 i
CO.\fPLETED BY i D Wattar<l O
v TELI?!!ONE M99 Moo-9196 4
StCNT11 May, 1985 DAY AVERACE DA:LY F0 Weit LEVEL DAY AVER ACE D AILY POWER LEVEL t.'.t h e-Ne t ) (.\tWe Net) 0 g7 0 1
2 0 13 0 '
3 0 -
g9 0 4 0 ;g 0 5 0 21 o 0 0 I 6 n l 7 0 y 0 s
0 :4 0 0 0 7 3-0 10 n 26 0 11 0 7 23 g, 0 .. g7 j 13 0 ;7 178-0 179 14 30 15 0 3g 210
. 16 0 CGTRt CONS On this form:t.'ist the 2ver:;; d:ily unit power levet in . '!We Net for e:ch c:y in the reporting snunih. Campute to
, tr.c cc:re:t shuie me;: watt.
O l'
l l
~
p -
%J '
- m.)
DOCKET NO 5'0-348 UNITSilll1 DOWNS ANI' POWl:R HliDilCllONS gj gg agggj J.M.Farley-Unit 1 DAIE 6-7-D HI PORI klONill BaL_1261.- COMPl.E ~Ilill ilY -J.D. Woodard 1 Eg.g 3.ggong; (205)899-5156~
s:
No. Date g
.$E 3g "g jN'5 I.itcusee [ s, y*8 l, Cause & Concosive
- 2sy !!sent g 'l Atison to f= y
<$=? Itegunt u va' u {U o Voocus Hecussence u
6 002 850501 S 638.4 C N/A 1 N/A N/A The Cycle VI-VII refueling outage continued from 4-6-85.
003 850528- S 11.0 B 4 N/A N/A N/A Turbine Overspeed trip test;
= maintenance testing.
v i 2 3 14 l'ussed 4 itenon: hicehod:
S: S,l.edukd A Equipnicne Iailure(Explain) lialubis G - Instinctions 1 Alanual for P4cpasannen of Data is hiaintenance of Tes 2 klanual Sciam. 1:nisy Shecis (os I i ensee C-Hefueling 3 Autonulic Scram.
D llegulai ny itesisitsinn Esen Repois (i Elt)l'ik gNtillEG-4 04hes (linplain) 0161I i -Opciator Isaining & Ikenic Ex4:nsuaison I Adsiniinistissive 5
15 Opc8JilaHadi I;8f ul lI 4fIal48)
(9/n) ll Ot hei (E xplain) Ifibibl: I
. Mamng Address
. Alatcm2 Power Company 6'O North 18th Street Post Off:ce Box 2641 6:rmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintndge Du ! ding / Milk)[llllil!OWCf June 12, 1985 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operating Data Report Attached are two (2) copies of the May 1985 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, required by Section 6.9.1.10 of Appendix A of the Technical Specifications.
If you have any questions, please advise.
Yours very t ly,
) ,
p R. P. Mcdonald RPM /KWM: sam Enclosures .
xc: Director, IE (10 copies)
Director, RII (1 copy) 7 d
\
. t}}