' JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

0F OPERATIONS July, 1992 There vere no unit shutdowns or major power reductions during the month of July.

The following major safety-related maintenance was performed during the month:

1. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
2. "A" component cooling vater pump was rernved from service for bearing replacement.
3. "B" boric acid pump was removed from service for seal leakage and impeller replacement.
4. Varfous Agastat timing relays vere replaced on the emergency diow t generator load sequencer.

1 ,-

i i

i

'9208180050 920812

-PDR ADOCK 05000348 g 'PDR

. 'OPFRATING DATA REPORT DOCKET No. 50-348 DATE August 4, 1972 COMPLETED BY R. D. Hill TELEPHONE (205)899-5156 OPP. RATING STATUS Notes

1. Unit Name: Joseph H. Farley - Unit i 1) Cumulative data since
2. Reporting Period: July 1992 12-1-77, date of 2,652 commercie3 cperation.
3. Licensed Thermal Fover-(HVt):
4. Nameplate Rating (Gross MVe):- 860
5. Design Electrical Rating (Net HVe):

829 6.-Haximum Dependable Capacity (Gross MVe): 855.7

7. Maximum Dependable Capacity (Net MWe): 812.0
8. If _ Changes Occur in Capacity Ratings (1tems Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Power Level To Vhich Restricted, If Any (Net MVe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative

'11. Hours In Reporting Period 744.0 5,111.0 128,567.0 L12. Number Of Hours Reactor Vas Critical 744.0 5,111.0 101,021.9

.13'. Reactor Reserve Shutdown Hours 0.0 0.0 3,650.9

14. Hours. Generator On-Line 744.0 5,111.0 99,375.3

-15. Unit Reserve Shutdown Hours 0.0 0.0 0.0

16. Gross Thermal Energy Generated (MVH) 1,971,762.0 13,499,723.4 'z54,904,347.5
17. Gross Electrical Energy Generated (HVH) 626,768.0 4,356,304.0 82,141,066.0

-18. Net Electrical Energy Generated (:iVH) -"594,702.0 4,135,608.0 77,550,406.0

19. Unit Service' Factor 100.0 100.0 77.3
20. Ur.it Availability Factor 100.0 100.0 77.3
21. Unit Capacity' Factor (Using MDC Net) 98.4 99.7 74.6~

22~. Unit Capacity Factor (Using DER Net) 93I4 97.6 72.8

23. Unit. Forced Outage Rate 0.0 0.0 6.8
24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):

Refueling /Maintennnce Outage, September 25, 1992, approximately 60 days.

25. If Shut Down AtLEnd Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 08/06/77 08/09/77

-INITIAL ELECTRICITY 08/20/77 08/18/77

. COMMERCIAL OPERATION 12/01/77 12/01/77 Form 2/34' l

DOCKET No. 50-348 UNIT - l'

i DATE August 4, 1992  !

COMPLETED BY R. D. Hill TELEPHONE _ (205)899-5156-IHONTH July DAY AVERAGE DAIIY.POVER L, '

, DAY AVERAGE DAILY POVER LEVEL (MVe-Net) (MVe-Net)

]

1 804 17 801 l

-2 800 18 802 3 796 -19 802

-4 797 20 803 5 782 21 801 o.

6 797 22- 802

=7 -796' 23 802 8 795 24 801

~

9- 794 25 801-101 795- -26 -799

-11 L 800 -27 799

12. ~ -801 28 799 13- 803' 29 801-'

14~ '803- 30 800 1154 :803' 31 799 16T 804--

INSTRUCTIONS.

On'this-format,-!.ist tne average daily unit power level in MVe-Net'for.each day in theLreporting month. ? Compute to the nearest whole megawatt.

Form 13/21 E

. , , - _ . , , , _m _

b

- UNIT SHUTr3WNS AND'POWrR REDUCT104S rK*i f NC.- '50-348' I UNIT NAME' J. M. FARLEY - WIT '1 '

DATE. Auwst 411992

' COMPLETED BY R. D. MILL REPORT MONTH JULY- TELEPHONE (205)S99-5156

................................ .................. .....................................................................a..................................

j. ~^

l' l. 'l .]

lMETHODOF . l LICENSEE - l l j' 'CAUSE & CORRECTIVE l.

.l~ l l l DURATION j l SHUTTING . lEVENTf l SYSTEM lCOMONENT._l ACTION TO- l'

[No. 'l'DATE l

l TYPE. l(HOURS) 2 lREA50N.jDOWNREACTOR 3 l REPORT #.il CODE' -l: CODE S ,j. PREVENT RECURRENE 'l-i lThere were no unit shutdowns or major power reductions daring the month of July. j' -l' .l 1 11. -l_ l l l' l' .I 1 1 I l l 'l-l- i i 1 l 1 i l' .I I i I i I i 1 1 I i l' l 1 'I I l 'l I-

1 1 I . l I- I l' I I I
l ' i 1 1 1- l i 1 l l 1 1 I l- .1 .1 - -l I l- 1 I I I I l- l 'l l I i 1 I I I I l' l 'l I- 1 1 1 1 I i 4 1- I l- I .I I :l' I I l-1 it' .l i 1 ~1 I i i i 1- '

"I I 'l -

! .I I I I I I i I I I I I I I l' I I i

! I I i  ! ,1 I i i i 1 l i l i I l' l l l I I I -l i I I l i 'l. I I  !

I I i l 1 1 I I I I i 1 1 1 1 I i l 1: 1 1 1 I I i i l I i l i 1  !.

~

l I  ! I i l i I i 1 1 I I i l- 1 I I I I I l-1 I I I I l 1 l I i I, i

i l l I I I i 'l 1 -l I I I 1. I I i 1 I i 1 l I:F Forced 2 Reason: 3 Method: ' Exhibit C-Instructions S: Scheduled .A-Equipment Failure (Explain) 1-Manual for Preparation of Data ,

B-Maintemnce or Test 2-Manual Scram. Entry Sheets for f icensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG- '

  • D-Regulatory RestrictionL 4-Other (Explain) 0161)

-E-Operator Training & 1icense Examination F-Ackniristrative 5 Exhibit 1 s me Source

- G-Operational Error (Explain).

(9/77) H-Other (Explain).

JOSEPH M. FARLEY NUClf.AR PLAhT UNIT 2 NAFRATIVE

SUMMARY

OF OPERATIONS July, 1992 At 0318 on 7--5-92, reactor power was reduced to 65 percent due to problems with the bearing oil system on the "2A" steam generator feedvater pump. The unit was returned to 100 percer.t povec at 1440 on 7-9-92.

The following major safety related maintenance was performed during the month:

1. Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
2. Various Agastat timing relays vere replaced on the emergency '

diesel generator load sequencer.

O s

4

PPERATING DATA REPORT DOCKET NO. 50-364 DATE August 4, 1992 COMPLETED BY R. D. Hill TELEPHONE _(205)899-5156 OPERATING STATUS Notes

1. Unit Names- Joseph M. Farley - Unit 2 1) Cumulative data since
2. Reporting Period: July 1992 7-30-81, date of
3. Licensed Thermal Power (MVt): 2,652 commercial ooeration.
4. Nameplate Rating (Gross MVe): 860
3. Design Electrical Jacing (Net HWe): 829
6. Maximum Dependable Capacity (Grnss HWe): 85'. 3
7. Maximum Dependable Capacity (Net MVe): 824.0
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
9. Foyer Level To Vhich Restricted, If Any (Net hVe): N/A

'10. Reasons For Restrictions, If Any: N/A This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 744.0 5,111.0 _96,480.0
12. Number Of-Hours Reactor Vas Critical 744.0- 3,505.2 82,369.5

-13. Reactor Reserve Shutdown Hours- 0.0 0.0 138.0

, 14. Hours Generator On-Line 744.0 3,357.0 81,28575

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16._ Gross Thermal Snergy Generated (MVH) 1,877,441.0 8,240,954.0 207,200,275.6

'17. Gross Electrical Energy Generated (MVH) 603,633.0 2,675,462.D 67,971,546.0

18. Net Electrical-Energy Generated (MVH) 572,877.0 2,515,038.0 ~B4,449,100.0
19. Unit Service' Factor '

100.0 65.7

~

8473

20. Unit A ailability Factor 100.0 65.7 84.3 21 Unit-Capacity Factor (Using MDC Net)_ _,

93.4 59.7 81.5

22. Unit Capacity Factor (Using DER Net) 92.9 59.4 80.6

-23. Unit Forced Outage Rate 0.0 .

4.5 4.2

.24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

, N/A

25. If Shut Dova At End Of Report Per ud, Estimated Date of Startup: N/A
26. Units _ In Test Status (Prior to t emmercial Operation)
Forecast- Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 65/24/81 ~

05/25/81 COMMERCT F ' OPERATION 08/01/81 07/30/81 Fctm 2/30 v.

-' DOCKET NO. 50-364 UNIT 2 DATE August 4,1992 COMPLETED BY R. D. Hill TELEPHONE (205)899-3156 MONT.9 July DA~f AVER, 'E DAILY POVER LEVEL DAY AVEPAGE DAILY POVER LEVEL (MVe-Net) (MVe-Net) 1 822 17 818 __

2 818 18 820 3 815 19 820 4 817 I" 823 p 5 555 21 818 6 473 22 ___

818 7 471 23 819 8 477 24 818 9 650 25 817 10 809 26 815 ,

11 ii14 27 815

-12 815 28 816 13 817 29 818 14 819 10 815 15 819 31 ___

B14 16 818_

INSTRUCTIONS On this format, list the average daily unit power level in MVe-Net for each day in the reporting month. Compute to the nearest whole megavatt.

Form 13/21

' UN!T-SHUTDOWS CS1D POJER REDUCTIONS DCCKET NO.30-364 (CIT. NAME - J. Q. FARLE7 - (MIT 2 DATE August 4. 1992 _

. COMPLETED SY R. D,. HILL REPORT MONTH JULY TEtrppogE (2053899-5156 l .l l~ ] l lMEi3000F. l LICENSEE.l' l l CAUSE & CORRECTIVE l l l. l l DURATION -l l' SHUTTING' l E'/FNT --l SYSTEM l COMP 0 KENT l ACTION TO l

, lNO. -lOATE lTYFE l

l(HOURS) lREASGn2 j DuWN REACTOR 3 l REPORT #'l CODE C l CODE5 l PREVENT RECURRENCE l 5- l011 l920705 .l' F l 107.4 l A l 'N/A' l N/A l SL l ' , N/A l lAt0318on7-597,reactorpowerwasreducedto65l l_ l- l l l l .l l l l percent due ;a problems 'with the bearing oi( system l .

l l l l l -l l l l lon the ZA s' eam generator feedwarv pwp. Theunit]

'l l l l l l ll l l [ returned to 100 percent power at 1440 on 7-9-C. l l i i I I I I I I I I i l I I I  ! I I I I I  !

I I i 1  ! I I I I I i i i I I I i l I I I I I I I I I I I I i l- 1 I I I I I I I I I I  !

l I i  ! I I i i i l i I i i l I l- 1 1 1 I I I I I I I I i i l I I

'l I .I l- 1 I i 1 i i I i l- I  ! I I I I I I I I I I I I I i i i l I I I 1 i  ! 'l I I I I I I I l- 1 I 'l i I I I I l I l i I i l i I I I I i I I i i l I i l i l I i i l I i l l I I I l i I I I I I i l i I I I i l i I I I I I I  ! I I l l 1 l I i i l i 1 I I I I I I l- 1 -

I:F Forced 2 Reason; 3 Method: 4Exh; bit G-Instructions S: Schedat ed A-Equipment Failure (Explain) 1-Manual for Preparation of f.ra ta B-Maintenance or test 2-Manual Scram. Entry Sheets for Licensee C Refueling Automatic Scram. Event Report (LER) File (NURCG-

..D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & t.f cense Examination

~

F-Adainistrat ive . 5 Exhibit ! -Same source G Operational' Error (Explain)

--_.- __.__.- _- - _-_.--__ _ _ _ - -