ML20099G958

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jul 1992 for Joseph M Farley Nuclear Plant Units 1 & 2 & Revised Rept for June 1992 for Unit 2
ML20099G958
Person / Time
Site: Farley  
Issue date: 08/12/1992
From: Woodward J
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20099G962 List:
References
NUDOCS 9208180049
Download: ML20099G958 (1)


Text

Sw+hefn Nuclear Ope <atre; company Ptr.;t 0".cc Box 1295 ILmniv; ham. Atabama

,-01 Telephone 705 eG8 SW L

Southern Nudear Operating Company

a. o. wooo.ro t

M southem cicoc s:,s:em August 12, 1992 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D. C.

20555 Joseph M. Farley Nuclear Plant Unit 1 and 2 Monthly Operatina Data Reports Gentlemen:

Attached are the July 1992 Monthly Operating Reports for Joseph M. Farley Nuclear Plant Units 1 and 2, as required by Section 6.9.1.10 of the Technical Specifications.

Also include 6 is a revised copy of the June Unit Shutdown and Power Reduction log for Unit 2.

This revision reflects updates to the reason and type fields for event numbers 9 and 10.

If you have any questions, please advise.

Respectfully submitted,

.?k J-a

. Woodard AEJ:edb6457 Attachments cc:

Mr. S. D. Ebneter-Mr. S. T. Hoffman Mr. G. F. Maxwell l

i W

[/

9208180049 920812 j {(g/ g'/

i DR ADOCK 0500034s FDR v,

(