Revised Monthly Operating Rept for Aug 1991 for Jm Farley Nuclear Plant,Unit 1,incorporating Corrections to Cummulative Capacity Factor
ML20085E772
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/31/1991
From: Dennis Morey
ALABAMA POWER CO.
To:
Shared Package
ML20085E376 List:
References
NUDOCS 9110210163
Download: ML20085E772 (1)


Text

_ _ _ _ _ _ - _ _ -

OPERATIlc nMA REKmT DOCKart to. 50-348 DME October 7, 1991_,

COMPIX11!D BY "D. N.16tey

'IELEPIENE (205)i9F513F~~

OranATnw avacs

~~

Notes

1. Unit Name: Joseph M. rarley - Unit 1 1) Cunutative atita since
2. Reporting NIffo~ds August 1991 12-1-77, date of
3. Licensed Wermal Power (tMt): 2,652 comercial operation.
4. Nameplate Rating (Gross We) ___ 860
5. Design Electrical Pating (Net m e): ____8 2 9
6. Maximum Dependable Capacity (Gross m e):_ 856.4
7. Maxits.im Dependable Capacity (Net Me): 814.0
8. If Changes Occur in Capacity Ratings (Items liumber 3 Through 7) Since Last Report, Cive Reasons:_ N/A
9. Iower Level To Which Restricted, If Any (Net We): N/A
10. Reasons for Restrictions, If Any: N/A his Month Yr-to-Date cumulative
11. Hours In Reporting Period 744 5831 120,527
12. Number Of Hours Reactor Was Critical 721.1 4073~f 93,028.2
13. Reactor Reserve Shutdown Hours 0~0 O.0 3,650 7
14. Hours Generator On-Line 671.8 3968.5 91,360.2
15. Unit Reserve Shutdown !!ours 0.0 0.0 0.0
16. Gross hermal Energy Generated (MI) 1,72 29 3 129,439 TJE763,420
17. Gross Electrical Energy Generated (MI) ~~55 62~ 58 130 ~ 75 308,468
18. Net Electrical Energy Generated (MI) ~~51 60 ,IlhDF-~~7Ih55,020 t
19. Unit Service ractor 90.3 68.1 75.8
20. Unit Availability ractor 9U'3~ 68~I~ 75.0-
21. Unit Capacity Factor (Using i1DC Nct) 85.7 64.5 ~~ 72 T
22. Unit Capacity ractor (Using DER Net) l 84.2 63.3 71.1
23. Unit Forced Outage Rate _ 9.7 3.3 7.3~
24. Shutdowns St.heduled Over Next 6 Months (Type, Date, and Duration of Ei~h): >

-I.E l 25. If Shtt Down At End Of Report Period, Estimated Date of Startup N/A

26. Units In Test Status (Prior to Cottenercial Operation): rotecast Achieved INITIAL CRITICALITY 08/06M 7 , 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 rorm 2/34 91to21n163 911014 U PDR' ADOCK O*J'OO ,

n

.