ML20085E371
| ML20085E371 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/14/1991 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20085E376 | List: |
| References | |
| NUDOCS 9110180200 | |
| Download: ML20085E371 (2) | |
Text
_
.3 al Amt,am Pew cornpany 40 lns+vnest cenM P4rk way hat Ottcc Des 12%
[h}nungham Alotiamn 3$201 h tephorie 20L Of.BM01 w o. Hairston, tu h
4,nar Vee Peopdent twcar opi ctin,*
Alabama POWCf October 14, 1991 f'* W"*'"o" N 3r*'
Docket No. 50-348 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C.
20555 Joseph M. fariry Nuclear Plant Unit 1 Monthly Opfratina Data Rep. ort Gentlemen:
Attached is the September 1991 Monthly Operating Report for Joseph M.
farley Nuclear Plant Unit 1, as required by Section 6.9.1.10 of the Technical Specificaticas. Also included is a revision to the August 1991 Unit 1 Operating Data R3 port which incorporates a correction to the Unit Commulative Capacity Factor (using MDC ne').
If you have any questions, please advise.
Respectfully submitted, l } _ }{ A$~~.[
W. G. Hairston, 111 AEJ:edb3014 Attachments cc: Mr. S. D. Ebneter Mr. S. T. Hoffmari Mr, G. F. Maxw11 i
911018020n 910930
[j' DR ADOCK O'300 8
/
l t
g' i
l JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS September 1991 l
i l
There were no unit shutdowns or major power reductions during the month.
The following major safety-related maintenance was performed during the month
)
1.
Hiscellaneous corrective and preventive maintenarce was performed on the diesel generators.
2.
While the unit was at 85 percent power for goverror valve testing, the 1A Condensate Pump Motor was replaced.