RO 82-009:specific Procedures to Test Motor Operated Valve Torque Switch Settings Not in Place by 830930.Caused by Committing Resources to Other Recent Regulatory Requirements.Procedures Will Be Established
ML20081M099
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/09/1983
From: Morgan R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-82-009, RO-82-9, RSEP-83-1270, NUDOCS 8311170071
Download: ML20081M099 (2)


Text

.A

, s

. t CD&L i Carolina Power & Light Company H. B. RNINSW STEAM ELECTRIC PIMP POST TFICE Bm 790 HARTSVILLE, SOU'IH CAROLINA 29550 h ' 4h.' g8 HOV 9 1983 lbbinson File No: .13510C Serial: RSEP/83-1270 Mr. James P. O'Reilly Regional Administrator U. S. Nuclear Regulatory Ca mission Region II

-101 Marietta Street, N. W., Suite 3100 Atlanta, Georgia 30303 H. B. RNINSW STEAM ELECTRIC PLANT, UNIT NO. 2 4

DOCKET NO. 50-261 LICENSE NC. DPR-23 LICENSEE EVENT REPORT 82-009

Dear Mr. O'Reilly:

As a result of a failure of motor operated valve RHR-759A, Carolina Power and Light Ocmpany (CP&L) notified your office on February 28, 1983, that specific procedures to test the motor operated valve torque switch settings would be in place by September 30, 1983.

Although most of the torque switch settings have been recorded, the specific

- procedures have not been developed due to cmmitting resources to other recent regulatory requirenents and because the Plant Operating Manual is in the process of being reorganized.

Procedures including the valve torque switch setting will be established as part of the re-developnent of the Maintenance Procedures Section of the Plant Operating Manual consistent with CP&L's emmitment to the long Term Inprovement Program.

When these torque switch setting procedures are developed, the torque switches will be checked as plant conditions permit. It is expected that incorporating these isolated cannitments into the re-developnent of the Plant Operating Manual will result in 'a better planned schedule and a more canprehensive manual.

-. w' 8311170071 831109

- t l MAIZOW i

PDR ADOCK 05000261 l S PDR 7 2 i 1

{ ) k t

-~~

t ~'= w,-. < - ' , - - ~ -~-v- - w - -- - - ~a~v -

r-

< s v

c- -

'4

. ' letter to Mr. James P. O'Reilly Serials RSEP/83-1270

.Page 2 If you have any questions concerning this plan, please contact me or my staff.

Very truly yours, d

R. E.

General Manager H. B. Ibbinson SEG Plant

' CIM:ME:J)C:CWC/th -

cc: R. C. DeYoung (30)

. R. A. Hartfield - (3)

S. P. Weise INPO (1) f l

1 4