Text
- Encin ura to S;irialt-' RNPD/86-5648
'Pfga.I'of 3 CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN'DATE. 12/02/06 OPERATING DATA REPORT RPD36 (RUN TIME ii:00:54 ROBINSON UNIT 2 DOCKET.NO. 050-0261 COMPLETED BY V. E. FRAZIER OPERATING STATUS, TELEPHONE (803)383-4524
- i. UNIT;NAME: _ ROBINSON UNIT'2 1 NOTES 1
c
'i
- 2. REPORTING PERIOD: NOVEMBER 86 I
I
- lThere are presently 270 FuelAssemblie
- 3. LICENSED-THERMAL POWER (MWT)- 2300
- 4. NAMEPLATE RATING (GROSS.MUE)- 739.0 1
I 5.
DESIGN ELECTRICAL RATING ~(NET MWE): 700.0 l
-l
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 700.0 1:
I
- 7. MAX DEPENDABLE CAPACITY (NET MWE). 665.0
'8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS-3 THRU 7) SINCE LAST REPORT, GIVE' REASONS:
9c POWER LEVEL TO WHICH RESTRICTED IF ANY.(NET-MWE)'
None
- 10. REASONS FOR RESTRICTION IF ANY:
N/A THIS YR TO CUMUL-MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 720.00 8016.00-130006.00 i2. NUMBER OF HOURS REACTOR' CRITICAL
.720.00 6382.93 98439.95
- 13. REACTOR RESERVE SHUTDOWN HRS
.00 503.98 3314.65
- 14. HOURS GENERATOR ON LINE 720.00 6295.83 96063.73
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00 23.20
- 16. GROSS THERMAL-ENERGY GEN. (MWH) 1623282.96 13632600.48 193124569.20
'17.
GROSS ELEC. ENERGY GEN. (MWH) 547322.00 4530428.00 62389899.00
- 18. NET ELEC.-ENERGY GENERATED (MWH) 522122.00 4298838.00 58948302.00
- 19. UNIT SERVICE FACTOR 100.00 78.54 69.61 i
- 20. UNIT AVAILABILITY FACTOR 100.00 78.54 69.63
- 22. UNIT CAP. FACTOR (USING DER NET) 103.60 76.61 61.02
- 23. UNIT FORCED OUTAGE RATE
.00 7.84 14.31
.24.
SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE. DATE, AND' DURATION OF EACH)-
Refueling / Maintenance, April 11, 1987, 55 Days
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL UPERATION)
FORCAST ACHEIVED INITIAL CRITICALITY 2
INITIAL ELECTRICITY
~ 1 ~- -
2--
~
COMMERCIAL OPERATION 2 1 ---
- 2 f--
l R
1.16 - 9 f
l N
' P;;gg 2 c f 3 CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN"DATE 12/02/86 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39
' RUN TIME ii:02:00 ROBINSON UNIT 2 DOCKET NO. 050-0261 COMPLETED BY V.
E.
FRAZIER TELEPHONE (803)383-4524 ROVEMBER 1986 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MUE-NET)
(MWE-NET) 1 736 17 733 2
735 18 735 3
737 19 736 4
736 20 736 5
735 21 729 6
~737 22 547 7
735 23 728 8
736 24 738 9
735 25 74i 10 734 26 739 11 735 27 739 12 735 28 739 13 736 29 739 14 737 30 742 15 705 16 632 1.16
-8
5 Page 3 of 3 Q
l DOCKETNO. E-02M UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME H.
B.
Robinson DATE 12-2-86 COMPLETED SY Valerie F.
Frn7ier REPORT MONTH Novomhor TELUHONE 803-381-1??n e.
E c
j?
3
$ E~
Licensee gg
{"3 Cause & Corrective 9
Action to No.
Date i
3g i
j~s Event u?
}V Prevent Recurrence g
e j ;y, c Report a mO 6
I 1101 861122 S
B 4
HH PUMPXX Maintenance was performed on heater drain pump to repair steam leak.
While unit was at reduced power, turbine valve test was performed.
Unit returned to full load.
I l
1 2
3 4
l F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C Itefoding 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E. Operator Training & License Examination F-Administrative 5
G-Operational Er ror (Explain)
Exhibit I - Sanw Source (9/77) liether(Esplain) t
CP&L Carolina Power & Light Company ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 DEC 8 1986 Robinson File:
15505 Serial: RNPD/86-5648
/
Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 ROBINSON NUCLEAR PROJECT DEPARTMENT UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. Taylor:
In accordance with Technical Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of November, 1986.
Very truly yours, R. E.
gan General Manager H. B. Robinson S. E. Plant VEF:jch Enclosure cc:
R. A. Hartfield (2)
J. N. Grace (1)
M V
I
&