ML20210R634
| ML20210R634 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 01/31/1987 |
| From: | Frazier V, Morgan R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RNPD-87-509, NUDOCS 8702170462 | |
| Download: ML20210R634 (3) | |
Text
I Enclosurs to S;rirl: RNPD/87-509 P;ga 1 of 2 c'
TP&L C0 PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 02/02/87 OPERATING DATA REPORT RPD36 RUN TIME 15:30:14 ROBINSON UNIT 2 DOCKET NO. 050-0261 COMPLETED BY V. E.
FRAZIER OPERATING STATUS TELEPHONE (803)383-4524
- 1. UNIT NAME: ROBINSON UNIT 2 i NOTES l
- 2. REPORTING PERIOD: JANUARY 87 l
l 3.
LICENSED THERMAL POWER (MWT): 2300 1 There are presently 270 fuel I
4.
NAMEPLATE RATING (GROSS MWE) 739.0 l assemblies in the Spent Fuel Pool.1 5.
DESIGN ELECTRICAL RATING (NET MWE): 700.0 l
l 6.
HAM DEPENDABLE CAPACITY (GROSS MWE) 700.0 l l
7.
HAX DEPENDABLE CAPACITY (NET MWE) 665.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
N/A 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
None
- 10. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 744.00 139494.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 744.00 744.00 99919.92
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 3314.65
- 14. HOURS GENERATOR ON LINE 744.00 744.00 97542.20
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00 23.20
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1694529.60 1694529.60 196376544.72 i7. GROSS ELEC. ENERGY GEN. (MWH) 571469.00 571469.00 63485947.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 545257.00 545257.00 59992747.00
- 19. UNIT SERVICE FACTOR 100.00 100.00 69.93
- 20. UNIT AVAILABILITY FACTOR 100.00 100.00 69.94
- 22. UNIT CAP. FACTOR (USING DER NET) 104.70 104.70 61.44
- 23. UNIT FORCED OUTAGE RATE
.00
.00 14.13
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling /Mair.tenance, March 28, 1987, 55 Days
- 25. IF SHUlDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: --
'26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)
FORCAST ACHEIVED INITIAL CRITICALITY r--
INITIAL ELECTRICITY r--
CUMMERCIAL OPERAfION
- - - l r- -
fr--
ohs 3 k
1.16 -9 A
\\s
Encl":urs to Strirl: RNPD/87-509 Pzgs 2 of 2 o'
~
P&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 02/02/87 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 RUN TIME 15:28:03 ROBINSON UNIT 2 DOCKET NO. 050-0261 COMPLETED BY V. E.
FRAZIER TELEPHONE (803)383-4524 JANUARY 1987 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 740 17 736 2
739 18 735 3
739 19 736 4
738 20 737 5
739 21 737 6
738 22 735 7
737 23 734 8
737 24 684 9
737 25 656 10 737 26 737 11 736 27 737 12 737 28 737 13 737 29 737 14 737 30 738 15 737 31 738 16 738 1.16 - 8
e orm 244 Carolina Power & Light Company ROBINSON NUCLEAR PROJECT DEPARTMENT Company Correspondence POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 FEB 6 1987 Robinson File:
15505 Serial: RNPD/87-509 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET No. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Sir:
In accordance with Technical Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of January, 1987.
Very truly yours, R. E. Morgan General Manager H. B. Robinson S. E. Plant VEF:1ko Enclosure l
cc:
J. N. Grace i
H. E. P. Krug
\\