CP&L CO PLANT PERFORMANCE' DATA SYSTEM- 'PAGE i.

RUN DATE- 04/14/87- OPERATING DATA REPORT RPD36-000-RUN TIME ~i4:20:19 ROBINSON UNIT 2 Enclosure to Serial: RNPD/87-1640 Page 1 of 4. DOCKET N0'. 050-O'261 COMPLETED BY V. E. FRAZIER OPERATING STATUS TELEPHONE (803)383-4524 1.~ UNIT NAME: ROBINSON UNIT 2 l NOTES I

2. REPORTING PERIOD: . MARCH 87 i There are presently 318 Fuel I
3. LICENSED THERMAL POWER (MWT); 2300 l Assemblies in the Spent Fuel .I
4. NAMEPLATE RATING (GROSS MWE): 739.0 l Pool. 1
5. DESIGN ELECTRICAL RATING (NET MWE): 700.0 l l
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 700.0 l l
7. MAX-DEPENDABLE CAPACITY (NET MWE): 665.0 ------------- -----------------
8. IF CHANGES OCCUR IN CAPACITY ~ RATINGS (ITEMS 3 THRU 7) SINCE.LAST REPORT, GIVE REASONS: N/A
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE); None
10. REASONS FOR RESTRICTION IF ANY: - N/A .

THIS YR TO CUMUL MONTH 'DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 2160.00 141000.00
12. NUMBER OF HOURS REACTOR CRITICAL 559.43 1975.43 101151.35
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 3314.65
14. HOURS GENERATOR ON LINE 557.00 1973.00 98771.20
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 23.20
16. GROSS THERMAL ENERGY GEN. (MWH) 1030092.72 4233072.72- 198915087.84
17. GROSS ELEC. ENERGY GEN. (MWH) 349450.00 1429782.00 64344260.00
18. NET ELEC. ENERGY GENERATED (MWH) 327257.~00 1357843.00 60754580.00
19. UNIT SERVICE FACTOR 74.87 91.34 70.05
20. UNIT AVAILABILITY FACTOR 74.87 91.34' 70.07
21. UNIT CAP. FACTOR (USING MDC NET) 66.14 94.53 70.65
22. UNIT CAP. FACTOR (USING DER NET) 62.84 89.80 61.55
23. UNIT FORCED OUTAGE RATE 14.38 4.53- 14.05
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

None 1

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: Fby 23,1987
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 13 2--- - f 2 1-INITIAL ELECTRICITY -------- --------

~~~ ~~~

COMMERCIAL OPERATION ~---~~-- --------

8705050313 870429 .16 - 9 PDR ADOCK 05000261 R

PDR

CP&L CO

~

PLANT PERFORMANCE DATA SYSTEM PAGE i RUN DATE 04/01/87 APPENDIX D - AVERAGE DAILY POWER LEVEL RPD39-OOO RUN TIME 14:06:06 ROBINSON UNIT 2 P;ge 2 of'4 DOCKET NO. 050-0261 COMPLETED BY V. E. FRAZIER TELEPHONE (803)383-4524 MARCH 1987 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MUE-NET) 1 688 17 .-10 2 677 18 -25 3 479 19 -24 4 679 20 -22 5 679 21 223 6 678 22 385 7 678 23 550 8 630 24 592 9 619 25 595 10 619 26 595 11 ^20 27 552 12 620 28 -7 13 621 29 -16

14 620 30 -15 15 620 31 -10 16 546 1.16 - 8

Page 3 of 4 DOCKET NO. 050-0261 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME H. B. Rnhinenn DATE 4-14-87 COMPIETED 3Y Valerie E. Frazier REPORT MONTH %rch TELEPHONE 803-383-4524 Eg Cause & Correceive

.! E 3 hE Licensee Action to No. Date {

H 3g (

jgy Event Report a g?

mV g3 g

V Prevent Recurrence fE j ;f, g 6

0301 870317 F 93.34 A 1 87-001 EE ENGINE While performing weekly Surveillance Test (OST-401), "B" Emergency Generator tripped on a high crankcase pressure.

This cause was contributed to water leakage into Lube Oil System. "B" Emergency Generator declared inoperable and was under a.7-day LCO limit that caused the Reactor shutdown. " B" Emergency Generator was repaired and returned to service.

3 4 I 2 Exhibit C . Instruct 6uns Reason:

Method:

F: Forced 1-Manual for Preparation of Data S. Scheduled A Equipment Failure (Explain) Entry Sheets for Laznese B-Maintenance or Test 2-Manual Scram.

3 Automatic Scram. Event Report (LER) File (NUREG.

C-Refueling 0161) 4Other (Explain)

D Regula ory Restriction E4perator Training & Ucense Examination 5 F Admimstrative Exhibit 1 Same Simtse G Operational Eirur (Emplain)

~

(9/77) llother (Emplain)

Page 4 of 4 050-0261 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS

  • H. B. Robinson UNIT NAME

"-14-D#

DATE Valerie E. Frazier March COMPLETED BY REPORT MONTH TELEPHONE 803-383-4524

. a

~E E E*, Cause & Corrective

.] ? 3 y E3 Licensee .,

{*3 Action to g

thie 255 Event 17 No. h

  • $5

?

5 s

j ;f, g Report a mO g' Prevent Recurrence 6

0302 870327 S 7.34 C 4 ---

ZZ ZZZZZZ Unit ramped down manually to 6 power off-line for Cycle #12 Refueling.

ZZZZ 870328 S 93.42 C 1 ---

ZZ ZZZZZZ Cycle #12 Refueling commenced, and unit was taken suberitical. This outage will continue into April.

3 4

I 2 Exhibit G . Instructiuns Reason: Method:

F: Forced 1-Manual for Preparation of Deta S: Scheduled A Equipment Failure (Explain) Entry Sheets for bcensee B-Maintenance or Test 2-Manual Scram.

3 Automatic Scram. Event Repori (LER) File (NUREG-C. Refueling 44ther(Explain) 0161)

D Regulatory Restriction EOperator Training & License Examination 5

F. Administrative Exhibit I Same Soun:e G-Operational Eirur (Explain) ~

19/77) llother (Emplaini G