ML20207M245
| ML20207M245 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/31/1986 |
| From: | Frazier V, Morgan R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| RNPD-87-58, NUDOCS 8701130126 | |
| Download: ML20207M245 (4) | |
Text
.
Enclorura to Serielt RNPD/87-58 W
Pega 1 of 3
-PLANT PERFORtiANCE_ DATA SYSTEM PAGE
-1
' CP&L;CO OPERATING DATA REPOR' RPD36
- RUN - ITATE 01/06/87
- RUN_ TIME 08:40:48 ROBINSON. UNIT 2 DOCKET NO. 050-0261 COMPLETED BY V.-E.
FRAZIER OPERATING STATUS TELEPHONE.(803)383-4524
- i. UNIT NAME: ROBINSON UNIT 2.
-l NOTES 1
- 2. REPORTING PERIOD: DECEMBER. 86 i There are presently'270 fuel-1
-3.
LICENSED THERMAL POWER (MWT)' 2300 l
assemblies in the Spent Fuel Pool)l
.4.
NAMEPLAlE RATING (GROSS MWE) 739.0-I 5.. DESIGN ELECTRICAL RATING: (NET MWE). 700.0 -- l -
l 6.
MAX. DEPENDABLE CAPACIiY (GROSS MWE) 700.0 l l
- 7. MAX DEPENDADLE CAPACITY.(NET MWE). 665.0-8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU.7) SINCE LAST REPORT, GIVE REASONS:
N/A 9.' POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE). None
~i0.-REASONS FOR RESFRICTIDHLIF ANY: N/A THIS YR TO.
.CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 8760.00 138750'00
- 12. NUMBER OF HOURS REACTOR CRITICAL 735.97 7118.90 99175.92
- 13. REACTOR RESERVE SHUTDOWN HRS
.00 503.98 331'4.65
- 14. HOURS GENERATOR ON LINE 734.47 7030.30 96798.20
- 15. UNIT RESERVE SIIUlDOWN HOURS
.00
.00 23.20
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1557445.92 15190046.40 194682015.12
- 17. GROSS ELEC. ENERGY GEtJ. (MWH) 524579.00 5055007.00 62914478.00
- 10. NET ELEC. ENERGY GENERATED (MWH) 499180.00 4790026.00 59447490.00
- 19. UNIT SERVICE FACTOR 98.'72 00.25-69.76
- 20. UNIT AVAILABIL ITY FACTOR 98.72 80.25 69.78
100.09 82.36 64.43-
- 22. UNIT CAP. FACTOR (USENG DER NET) 95.05 78.25 61.21
- 23. UNIT FORCED OUTAGE RATE i.28 7.20 14.23
- 24. SHUTDOWNC SCHED. OVER NEX1 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)-
Refueling / Maintenance, March 28, 1987, 55 Days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START U P : --
- 26. UNITS IN 1EST STATUS (PRIOR TO COfiMERCI AL OPER ATION)
FORCAST ACHEIVED INITIAL CRITICALIfY INI TI AL ELEC TRICI TY ZC---
22---
COMMERCIAL OPERATION
- I- - -
--E--
~~
v o[h61
/g#
0
/
i.16 - 9 PDR p
N Enclorurs to S: rial: RNPD/87-58
~'
Page 2 of 3 CP&L,CO PLANT PERFORMANCE DATA GYSTEM PAGE i
RUti DATE Oi/06/87 APPENDIX B - AVERAGE DAILY POWER LEVEL kPD39 RUN TIME 08:37:49 RGBINSON UNIT 2 DOCKET NO. 050-0261 COMPLETED BY V.
E.
FRAZIER T EL.EPH ONE (803)383--4524 DECEMBER 1986 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) i 741 17 741 2
742 10 741 3
743 19 672 4
743 20 330 5
742 21 335 6
743 22 293 7
~/42 23 303 0
'744 24 394 9
743 25 703 10 742 26 735 ii 740 27 735
N 735 12 741 J
)3 74i 29 737 14 74i 30 738 iS 741 31 7 3'/
16 741 i.16 8
Enclosura to Srrial: RNPD/87-58 Pcga 3 of 3 DOCKET NO. 050-0 W p
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME M-R-
Rnhin=nn DATE 01-06-87 COMPLETED BY Valerie E.
Frazier REPORT MONTH December TELEPHONE 803-383-1220 "L
c j?
3 jU Licensec h
{*?
Cause & Corrective Action to N. i.
Date g
3g j
2sE Event
~g g
Prevent Recurrence fE c2 j #3 Report a mo g
6 1201 861219 S
0 B
1 CH VALVEX Unit was ramped down to perform maintenance on HDV-1530A Control Valve and both main feed pump couplings. Valve and pump couplings were repaired.
However, power escalation was delayed until proper core power distribution was reestablished. Unit was then returned to full power.
1202 861222 F
9.53 A
3 LER-014 CH VALV0P "B" Feedwater Regulator Valve feedback linkage failed causing "B" Feedwater Regulator Valve to open'.
"B" Steam Generator high level initiated a Turbine Trip and subsequent Reactor Trip. The linkage was repaired and the linkage on all three regulator valves was lockwired prior to startup.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets fer Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
EOperator Training & Ucense Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit i. Same Source (4/77)
It 0:her (Explain) o
l
\\
w CD&L Carolina Power & Light Company ggg wrwm-e-remmes ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 JAN O 91987 Robinson File:
15505 Serial: RNPD/87-58 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 ROBINSON NUCLEAR PROJECT DEPARTMENT UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT In accordance with Technical Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of December, 1986.
Very truly yours, R. E. Morgan General Manager H. B. Robinson SEG Plant VEF:jbs Enclosure cc:
J. N. Grace (1)
Resident Inspector - RNPD (1) l r
I nil
...,