ML20211B560
| ML20211B560 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 05/31/1986 |
| From: | Morgan R, Scott A CAROLINA POWER & LIGHT CO. |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| RNPD-86-2481, NUDOCS 8606110737 | |
| Download: ML20211B560 (3) | |
Text
clisur; t; S:rinl: RNPD/86-2481 1 of 2 s
6L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 06/02/06 OPERATING DATA REPORT RPD36 RUN TIME 15:21:49 ROBINSON UNIT 2 DOCKET NO. 050-0261 COMPLETED BY A.
E. SCOTT OPERATING STATUS TELEPHONE (803)383-4524
- i. UNIT NAME: ROBINSON UNIT 2 l NOTES There are presently 1
- 2. REPORTIt4G PERIOD: MAY 86 l 270 fuel assemblies in the Spent l
- 3. LICENSED THERMAL POWER (MWT): 2300 l Fuel Pool.
l
- 4. NAMEPLATE RATING (GROSS MWE) 739.0 l
l 5.
DESIGN ELECTRICAL RATING (NET MWE): 700.0 l
l
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE). 700.0 l l
- 7. MAX DEPENDABLE CAPACITY (i4ET MWE): 665.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
N/A
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)-
None
- 10. REASONS FOR RESTRICTION IF ANY:
N/A THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 3623.00 133613.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 744.00 2271.35 94328.37
- 13. REACTOR RESERVE SHUTDOWN HRS
.00 280.82 3091.49
- 14. HOURS GENERATOR ON LINE 744.00 2192.48 91960.38
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00 23.20
- 16. GROSS THERiiAL Et1ERGY GEN. (MWH) 1659472.08 4422646.08 183914614.00
- 17. GROSS ELEC. ENERGY GEN. (MWH) 554882.00 1478158.00 59337629.00
- 18. NE1 ELEC. ENERGY GENERATED (tiWH) 528977.00 1394411.00 56043875.00
- 19. Ut41T SERVICE FACIOR 100.00 60.52 68.83
- 20. UNIT AVAILABILITY FACTOR 100.00 60.52 68.84
- 22. UNIT CAP. FACTOR (USING DER f4ET) 101.57 54.98 59.92
- 23. UNII FORCED OUTAGE RATE
.00 10.10 14.63
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONIHS (TYPE, DATE, AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT Et4D OF REPORI PERIOD, ESTIMATED DATE OF START UP:
N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAIION)
FORCAST ACHEIVED INITIAL CRITICALITY 2----
-- 2 2 - --
INIIIAL ELECIRICITY
-#2----
2-C0tir1ERCIAL OPERATJON f$
8606110737 860531 PDR ADOCK 05000261 1.16 -9
\\
R PDR
2 of 2 GF&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
RUN DATE 06/02/86 APPEND [X B - AVERAGE DAILY POWER LEVEL RPD39 RUN TIME i5:20:20 ROBINSON UNIT 2 DOCKET NO. 050-0261 COMPLETED BY A. E. SCOTT TELEPHONE (803)383-4524 MAY 1986 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-t4ET)
(liWE-NE T )
1 722 17 712 2
720 18 713 3
720 19 712 4
720 20 71 3 5
719 21 713 6
719 22
~713 7
718 23 711 8
714 24 710 9
712 25 626 10 711 26 713 11 712 27 714 12 712 20 712 13 712 29 711 14 711 30 710 15 712 31 709 16 712 i
r 1.16 - H
/
CP&L Carolina Power & Light Company musDtsmstsauxassaaurzem m.um ROBIN 5ON NUCLEAR PROJECT DEPAR'? MENT POST OFFICE BOX 790 HARTSVILLE, SorJTH CAROLINA 29550 JilN 0 51536 Robinson File:
15505 Seria : RNPD/86-2481 Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Cormnission Washington, D. C.
20555 ROBINSON NUCLEAR PROJECT DEPAR'a' MENT UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO, DPR-23 MONTHLY OPERATIONS REPORT Dear Mr. Taylort In accordance with Technical Specifications 6,9.1.c for the H. R. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith
, submits the report of operstion statistics and shutdown experience for the month of May, 1986.
Very truly yours,
[s2 R. E. H gan General Manager H. B. Robinson S. E. Plant AEStac Enclosure ces R. A. Hartfield (2)
J. N. Graco (1)
~b t \\.