ML20213F312
| ML20213F312 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 10/31/1986 |
| From: | Frazier V, Morgan R CAROLINA POWER & LIGHT CO. |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8611140147 | |
| Download: ML20213F312 (3) | |
Text
1 CP&L CO PLANT PERFORMANCE DATA SYSIEM PAGE i
RllN DATE ii/0//06 OPERATING DATA REPORT RPD36 RUN TIME 08:Si:59 ROBINSON UNIT 2 Enclosure to Serial:
RNPD/86-5290 Page 1 of 2 DOCKEI NO. 050-0261 C0tiPIE1ED BY V.
E.
FRAZIER OERAIING S T ATUS TELEPHONE (803)383-4524
- i. (JNIT NAME ROBINSON UNIT 2 I NOTES I
2.
REPORIING PER10D: OC10 DER 06 i
i 3.
1ICENSED THERMAL POWER (MWi) 2300 i There are presently 270 Fuel l
4.
NAMEPLA1E RAIIf4G (GROSS MWE>
739.0 i Assemblies in the Spent Fuel I
5.
DFSIGN El.ECIRICAL RATING (NET MWE) 700.0 l Pool.
I 6.
MAX DEPENDAHLE CAPACIFY (GROSS MWE) 700.0 l l
7.
tiAX DEPENDADIE CAPAC1IY (NET MWE)- 665.0 O.
IF CHANGES OCCUR IN CAPACIIY RAT'NGS (IIEtiS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
N/A 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
None
- 10. REA' ION ; FOR RES TRICIION IF ANY:
N/A THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PER]OD 745.00 7296.00 137206.00
- 12. NUtiltER OF LIOURS REAC10R CRITICAL 745.00 5662.93 97719.95
- 13. REACTOR RESERVE SHUTDOWN HRS
.00 503.90 3314.65
- 14. Il0URS GEt8 ERA 10R ON L.INE 745.00 5575.03 95343.73
- 15. IJN11 RESERVE SHUIDOWN HOURS
.00
.00 23.20
- 16. GROSS IHERMAL ENERGY GErl. (MWH) 1695677.76 12009317.52 191501206.24
- 17. GROSS El EC. ENERGY GEN. (MWH) 567199.00 3983106.00 61842577.00
- 10. NEI El.EC. ENERGY GENERATED (MWH) 541309.00 3/76716.00 50426100.00
- 19. UNIT SERVlCE FACf0R 100.00 76.42 6(7.45
- 20. UNIT AVAll AltiLI T Y FAC10R 100.00 76.42 69.47
- 22. UNIT CAP. FACIOR (USIt1G DER NEf) 103.00 73.95 60.00
- 23. UNII FORCED OUTAGE RATE
.00 8.77 14.40
- 24. SHUTDOWNS SCHED. OVER NEXT 6 (10N I HS (IYPE, DATE, AND DURATION OF EACH)
Reiteling/ Maintenance, April 11, 1987, 55 Days
- 25. IF SHU1DOW4 AT END OF REPORT PERIOD, ESIIMATLD DATE Of SIART UP --
- 26. UNITS IN IEST STATUS (l'R I OR 10 COMl1ERCIAL OPERATION)
FORCAST ACHEIVED IN1IIAL CRIIICAL1IY
- ~ E- - -
~~I---
~
~~
~~
INIIIAL ELECTR1ClIY
- ^
I-~-
~
~
COMMERCIAL Of'LRAIION
--- 1 --
8611140147 861031 PDR ADOCK 0000 1
R 1.16 - 9
,t
- . Page 2 of 2 CP&L CO PLANT PERFORMANCE DAT A SYSTEri PAGE i
RUN DATE 1i/07/96 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 R U t1 T I ti E 08:5i:56 R 0 ltI N S u t4 U t1 I I 2 DOCKEI NO. 050-0261 COMPl_ETED BY V.
E.
FRAZIER TELEPH0t4E (803)383-4524 OCTOBER i'786 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL.
( MWE --t4E T )
(MWE-t4EI) i 720 17 735 2
719 18 735 3
710 19 735 4
~716 20 735 5
716 21 735 6
719 22
/33 7
723 23 733 0
724 24
/27 9
726 25 734 iO 725 26 734 11 719 27 735 12 66 ~/
28 737 13 728 29 735 14 730 30 736 15 72'i 31 736 16 733 i.16 - B
f CP&L Carohna Power & Light Company n : n..
- .m ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 NOV 7 1986 Robinson File
15505 Serial:
RNPD/86-5290 Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 ROBINSON NUCLEAR PROJECT DEPARTMENT UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPE 1ATIONS REPORT
Dear Mr. Taylor:
In accordance with Technical Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of October, 1986.
Very truly yours, J.d&gL R. E. Morgan General Manager H. B. Robinson S. E. Plant HRN:leh Enclosure cc:
R. A. Hartfield (2)
J. N. Grace (1)
Z G 2-4
%