Ro:On 830926,svc Water Leak Discovered on Containment Fan Cooler HVH-2.Cooler Declared Inoperable.Repairs Initiated. Event Considered Degradation of Containment Boundary Per IE Bulletin 80-24
ML20078D429
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/27/1983
From: Morgan R
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-80-24, RSEP-83-1236, NUDOCS 8310040516
Download: ML20078D429 (1)


Text

Form 244 Carolina Power & Light Company g H. B. RCBINSW STEAM ELECTRIC PIANT

  • Company Correspondence POST TFICE BOX 790 HARPSVIILE, SCXfrH CAROLINA 29550 h

SEP 2 71983 Ibbinson File No: 13510C Serial: RSEP/83-1236 Mr. James P. O'Reilly Regional Administrator U. S. Nuclear Regulatory Ca mission Region II 101 Marietta Street, N. W., Suite 3100 Atlanta, Georgia 30303 H. B. RTINSW STEAM ELECTRIC PIANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 PRmPT NorIFICATICN - HVH COOLER LEAK

Dear Mr. O'Reilly:

In accordance with Plant Technical Specification 6.9.2.a.3, the following event is reported.

At 1452 hours0.0168 days <br />0.403 hours <br />0.0024 weeks <br />5.52486e-4 months <br /> on Septanber 26, 1983, a service water leak was discovered on Containment Fan Cooler HVH-2. HVH-2 was then declared inoperable at 1601 hours0.0185 days <br />0.445 hours <br />0.00265 weeks <br />6.091805e-4 months <br /> (breaker open), and at 1640 hours0.019 days <br />0.456 hours <br />0.00271 weeks <br />6.2402e-4 months <br />, the HVH-2 leak was isolated. The NBC was notified of this Unusual Event via the Bnergency Notification System (ENS) at 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br />. At 1700 hours0.0197 days <br />0.472 hours <br />0.00281 weeks <br />6.4685e-4 months <br />, the NBC was notified via the ENS that the Unusual Event had terminated at 1640 hours0.019 days <br />0.456 hours <br />0.00271 weeks <br />6.2402e-4 months <br />. In accordance with Technical Specification 3.3.2.2.a, operability testing of the containment spray pumps was empleted at 1735 hours0.0201 days <br />0.482 hours <br />0.00287 weeks <br />6.601675e-4 months <br />. Subsequently, repairs were performed, and HVH-2 was returned to service at 0630 hours0.00729 days <br />0.175 hours <br />0.00104 weeks <br />2.39715e-4 months <br /> on September 27, 1983. This event is considered a degradation of a containment boundary pursuant to IE Bulletin 80-24 and is reported as such.

'Ihis event was reported to Mr. G. P. Beatty, Jr. , Manager - Robinson Nuclear Project Department, on September 26, 1983, and to NRC Region II on September 27, 1983.

Very truly yours, R. E. bb B310040516 830927 General Manager

{DRADOCK 05000261 H. B. Robinson SEG Plant PDR CIN/bss cc: G. P. Beatty, Jr. -

I S. P. Weise g-tf.8g"?T g