ML20212F532
| ML20212F532 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 07/31/1986 |
| From: | Morgan R, Scott A CAROLINA POWER & LIGHT CO. |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| RSEP-86-3513, NUDOCS 8608130339 | |
| Download: ML20212F532 (3) | |
Text
,
Enclo:ure to S: rial: RNPD/86-3513 Pagd 1 of 2 CP&L CO PLANT PERFORt1ANCE DATA SYSTEM PAGE i
RUN DATE 08/05/06 OPERATING DATA REPORT RPD36 RUN IIME i0:32:23 ROBINSON UNIT 2 DOCKEI NO. 050-0261 COMPLETED BY A.
E. SCOTT OPERATING STATUS TELEPHONE (003)383-4524
- i. UNIT HAME: ROBINSON UNIT 2 1 NOTES There are presently 270 1
2.
REPORTING PERIOD: JULY 06 i fuel assemblies in the Spent i
3.
LICENSED THERMAL POWER (MWI) 2300 l Fuel Pool.
I 4.
NAMEPLAIE RATING (GROSS MUE) 739.0 l
1 5.
DES [GN El ECTRICAL RAIING (NET MWE) 700.0 l
l 6.
MAX DEPENDADLE CAPACITY (GROSS MUE) 700.0 1 1
7.
MAX DEPENDABLE CAPACITY (NET MUE) 665.0 O.
IF CHANGES OCCUR Ir1 CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: n/a 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NFI MWE) none
- 10. REASONS FOR RESIRICTION IF ANY: n/a THIS YR 1U CUtiUL MONTH DATE AIIVE ii. !iOUR S IN REPORIING PER10D
'744.00 500'7.00 135 0 ~77. 0 0
- 12. NUM11ER OF HOURS REACIOR CRIIICAL 744.00 3700.17 95765.19
- 13. REACTOR RESERVE SHUTDOWN HRS
.00 200.02 3091.49
- 14. HOURS GENERATOR Ot1 LINE
'744.00 3624.20 93392.10
- 15. UNIT RESERVE SHUIDOWN HOURS
.00
.00 23.?O
- 16. GROSS THERMAL ENERGY GEN. (HWH) 1693500.40 7653206.00 107145255.52
- 17. GROSS El EC. ENERGY GEN. ( 11UH )
553076.00 2537091.00 603(7'7362.00
- 10. N E. T ELEC. ENERGY GENERA 1ED (t1UH) 527016.00 2403303.00 5705'2767.00 1Y. UNII SERVICE FACTOR 100.00 71.24 69.14
- 20. UHff AVAILAlflLITY F ACT OR 100.00 71.24 69.16
- 22. UNIT CAP. FACTOR (USING DER NET) 101.19 67.49 60.34
- 23. UN[T FORCED OUTAGE RAIE
.00 7.14 14.46
- 24. SHU1 DOWNS SCHED. OVER NEXT 6 HUNIHS (IYPE, DATE, AND DURATION OF EACH) nonc
?S. IF SHUTDOUN Al END OF REPORI PERIOD, ESTIMATED DATE OF START UP n/a
FORCAST ACHEIVED
~~
INITIAL CRITICALITY
- I- - -- -
~~
INI1IAL FLEC1RIClTY ConnLRCLAL OPERAlLON
~
~
8608130339 860731 PDR ADOCK 05000261 R
\\
g 1.16 9
}
P:ga 2 of 2 o
CP&L CO PLANT PERFORMANCE DATA SYSTEti PAGE i
RUN DA'IE 08/05/86 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39 RUN TItiE i0:3?:27 ROBINSON UNI 1 2 DOCKET NO. 050-0261 COMPLETED BY A.
E.
SCOTI TELEPHONE (003)383-4524 JULY 1906 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) i 718 17 712 2
718 18 709 3
718 19 593 4
71 9 20 705 5
7iO 21 706 6
717
". 2 709 7
720 23 700 3
719 24 708 9
717 25 709 10 715 26 709 11 712 27
'709 i '<?
'714 28 707 13 716 29 704 14 713 30 700 iS 713 31 707 i6 710 j
Cp&L Carohna Power & Light Company l
ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 AUG 8 1986 1
1 Robinson File :
15505 Serial: RSEP/86-3513 Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission
-Washington, D. C.
20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. Taylor:
In accordance with Technical Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of July, 1986.
Very truly yours, R. E. Morg General Manager H. B. Robinson SEC Plant AES/ac Enclosure cc:
R. A. Hartfield (2)
J. P. O'Reilly (1) d h+
/Y s\\