q CP&L CO PLANT PERFORMANCE DATA SYSTEM PAGE i
',RUN"DATE' 10/07/86 OPERATING DATA REPORT RPD36 RUN TIME 09:09:00 ROBINSON UNYT 2
' Enclosure to Serial: RNPD/86-4820 Pcge 1 of 4 DOCKET NO. 050-0261 COMPLETED BY A. E. SCOTT OPERATING STATUS TELEPHONE (803)383-4524
- i. UNIT NAME: ROBINSON UNIT 2 l NOTES I
- 2. REPORTING PERIOD: SEPTEMBER 86 l
l There are presently 270 fuel
- 3. LICENSED THERMAL POWER (MWT): 2300 l
assemblies in the spent fuel 4.
NAMEPLATE RATING (GROSS MWE)r 739.0 l
y Pool.
5.
DESIGN ELECTRICAL RATING (NET MWE): 700.0 i
l
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 700.0 l l
- 7. HAX DEPENDABLE CAPACITY (NET MWE): 665.0 8.-IF CHANGES OCCUR IN CAPACITY RATINGS
(. ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
N/A 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)*
- 10. REASONS FOR RESTRICTION IF ANY:
N/A THIS YR TO CUMUL MONTH DATE ATIVE ii. HOURS IN REPORTING PERIOD 720.00 6551.00 136541.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 624.34 4917.93 96974.95
- 13. REACTOR RESERVE SHUTDOWN HRS 64.58 503.98 3314.65
- 14. HOURS GENERATOR ON LINE 621.20 4830.83 94598.73
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00 23.20
- 16. GROSS' THERMAL ENERGY GEN. (MWH) 1344743.76 10313639.76 189805608.48
- 17. GROSS ELEC. ENERGY GEN. (MWH) 447111.00 3415907.00 61275378.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 423821.00 3235407.00 57884871.00
- 19. UNIT SERVICE FACTOR 06.28 73.74 69.28
- 20. UNIT AVAILABILITY FACTOR 86.28 73.74 69.30
- 22. UNIT CAP. FACTOR (USING DER NET) 84.09 70.".55 60.56
- 23. UNIT FORCED OUTAGE RATE 13.72 9. <7 9 14.50
.24.
SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE. DATE, AND DURATION OF EACH):
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST SThTUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED
~~~
~~~
INITIAL CRITICALITY
--~-----
INITIAL ELECTRICITY COMMERCIAL OPERATION 5610170105 540930-
.PDR ADOCK,05000261 R
PDR i.16 - 9 gg d \\.
A
l P g t. 2 'o f 4 CP&L CO F Lat:1 i-E R r: C IM A N L'.E DATA S YS T lin P A r,i:
i RUN DATE 10/01/86 iA'PENDIX B - AVERJ.fE DALLY POWF.R i. F.VE L RPD39 y
Riit' 1IME 43 16 ' ?
H U M 1 N H O,'1 thJr; DO-
,E i rW U. d S O -O '!!: 61 ConPi itTEL f,
E.
SCOTT
! ELEl =H ff td. ( 0 0 3 ) a t, ',- N.i 2 4 SEf'I En EW R i900 li A Y AV.. DA[!Y i'U W LE R L L V E:.
pro fW L, l'nILY PvWER L t, E !.
( MlJ E - N L i )
i rii)E-N E )
i
-10 l' /
72'3
.iu 5a r
., -n ;
a
'l
) 's
.. ()
,'sr
/
i <
sA /
~
i 6
- s
' r 'i f,
-: \\
') : \\
lOb 4.
...' 4
"/
f g cj 4
n
-I,. u,
,,t i-t.
t J
.#b
'i E) ',5 i
i (.'
2 '.) /
[22 11 240
) /
'7 ; :
s 12
<1 n 9
/ ',' S
'Y
?i H 5
i iS 16 I
t /
i i
_ _.. _ _. ~,, _. -... _,. _.
Page 3 of 4 DOCKET NO.
050-0261 UNIT SHUTDOWNS AND POWER REDUC 110NS UNIT NAME H.
B.
Robinsnn DATE 10-06-R6 COMPLETED BY H. Rav Norris REPORT MONTH September TELEPHONE (803) 383-4524 5
E c
., g 3
$ Ey Licensee
,E*
j"3 1,
Cause & Corrective Action to No.
Ihte g
g 4
is&
Event gg gV Prevent Recurrence f=
5 j di g Report
- mV g
(Continuation of Event 0801) 0901 860901 F
78.63 G
3 86-012 CB PUMPXX This outage originated with the loss of both heater drain pumps and subsequent reactor trip from an overboration event. The outage duration was extended to allow repair of several leaking steam generator handhole covers discovered during an inspection immediately following the trip.
NOTE:
Reason previously reported as H reclassified as G.
1 1
2 3
4 F: Forced Reason:
ththod:
Exhibit G. Instructions S: Scheduled A-Equipment Failure (Explain)
I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G Operational Er ror (Explain)
Exhibit I. Same Source (9/77) llother (Explain)
P::g2 4.of 4 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
050-0261 UNIT NAME H-R-
Rnhin=nn DATE 16-06-86 COMPLETED BY H. Ray Norris REPORT MONTH Rantamhar TELEPHONE (803) 383-4524 1 =2 E
c m
7.s ;;
Licensee ge, E%
.2 _e c
Cause & Corrective
=
No.
Nie g
3g s
jg g 5 Event s?
[3 Action to 5
j di g Report *
'N 0 Prevent Recurrence 6
0902 9-10-86 F
20.15 G
3 86-013 CH INSTRU While tierforming a maintenance surveillance test on the Steam Generator Pressure Instrumentation, the personnel involved failed to properly follow procedural instructions. This resulted in the loss of an active control channel, causing a reduction in feed flow to the effected steam generator. A steam generator low-level reactor trip occurred as level continued to fall.
All individuals involved were counsele i, 1
and procedures are being revised to
]
more definitively identify l
responsibility for each action.
4 2
i I
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions i
S: Scheduled A Equipment Failure (Explain)
I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee l
C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-l D-Regulatory Restriction 4-Other ( Explain )
0161)
I li-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit 1 - Same Source 4
(9/77) 110 her(Explain)
?,
s CP&L Carolina Power & Light Company ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 OCT 0 91986 Robinson File:
15505 Serial: RNPD/86-4820 Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 ROBINSON NUCLEAR PROFCT DEPARTMENT UNIT NO. 2 DOCKET No. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. Taylor:
i In accordance with Technic'al Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of September, 1986.
Very truly yours, N
R. E. Mo an General Manager H. B. Robinson S. E. Plant HRN:/4c Enclosure cc:
R. A. Hartfield (2)
J. N. Grace (1) d
/>?
o a
-