CP6L CO PLANT PERFORMANCE' DATA SYSTEM PAGE i I RUN DATE 04/01/87 OPERATING DATA REPORT RPD36-000
' RUN TIME.i4:03:44 ROBINSON UNIT 2 Enclosure to Serial: RNPD/87-1512 Page 1 of 4 DOCKET NO. 050-0261 COMPLETED BY V.
E. FRAZIER 4
OPERATING STATUS TELEPHONE (803)383-4524
- i. UNIT NAME: ROBINSON UNIT 2 l NOTES l
2.
REPORTIt1G PERIOD: MARCH 87 l
l 3.
LICEMSED THERMAL POWER (MWT): '2300 l There are presently 318 Fuel l
4.
NAMEPLATE RATING (GROSS MWE): 739.0 l Assemblies in the Spent Fuel Pool.l 5.
DESIGN ELECTRICAL RATING (NET MWE): 700.0
.l l
6.
MAX DEPENDABLE CAPACITY (GROSS MWE)- 700.0 l l
- 7. MAX.. DEPENDABLE CAPACITY (NET MWE): 665.0 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: N/A 9.
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MUE): None
- 10. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 744.00 2160.00 141000.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 559.43 1975.43
.101151.35
- 13. REACTOR RESERVE SHUTDOWN HRS
.00
.00 3314.65
- 14. HOURS GENERATOR ON LINE 557.00 1973.00 98771.20
- 15. UNIT RESERVE SHUTDOWN HOURS
.00
.00 23.20
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1030092.72 4233072.72 198915087.84
- 17. GROSS ELEC. ENERGY GEN. (MWH) 349450.00 1429782.00 64344260.00 1
i i8. NET ELEC. ENERGY GENERATED (MWH) 327257.00 1357043.00 60754580.00
- 19. UNIT SERVICE FACTOR 74.87 91.34 70.05
- 20. UNIT AVAILABILITY FACTOR 74.87 91.34 70.07
- 22. UNIT CAP. FACTOR (USING DER NET) 62.84 89.80 61.55
- 23. UNIT FORCED OUTAGE RATE 14.38 4.53 14.05
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF.EACH)-
None
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: May 23, 1987
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I
B704140222 870331 i.i6 - 9 DR ADOCK 050 1
/
Yt
.iPAl. ' CO' PLAi1T PF.RF ORMANCE DATA fiY!rlFM PAGE i
RilN'DATE 04/01/07 APPENDIX Et - AVERAGE DAll_Y POWER LEVEL RPD39-000
,RUN 1111F - 12:39.:3?
ROltINSON llNIT 2 PJge 2 of 4 DOCKF.T NO. 050-0261 COMPLETED BY V, E. FRA'ZIER TELFPllONE (I:03)303-4524 MARCH 190/
DAY AVG. DAll.Y POlll R LEVEL DAY AVG, DAll Y POWER I.EVEl
( MUE-N!: r )
(MWE-NEI) 1 600 17
-10 2
677 i0
-25 3
679 iY
-24 4
67V 20 27 5
679 21 223 6
678 22 385
/
6/U 23 S50 8
630 24 5'72 9
61Y 25 595 10 619 26 59b li 420 27 552 12 620 20
+7 13 621 27 16 14 620 30
-1S 15 6?O At 10 i
ib
- ) 4 b i.16 - O l
a
Page 3 of 4 "
3 DOCKET NO.
050-0261 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME H.
B. Robinson DATE 4-3-87 COMPLETED BY valerie E. Frgier REPORT MONTH Mnrch TELEPHONE 803-383-4524 E
c Licensee
[*,,
Cause & Corrective jg 3
y E5 Action to No.
Ihre k
3y 4
2s5 Event 3 'g pb f3 s
j ;c,j Report 2r mO Prevent Recurrence g
H 6
0301 870317 F, 93.34 A
1 87-001 EE ENGINE While performing weekly Surveillance Test (OST-401), "B" Emergency Generator tripped on a high crankcase pressure.
This cause was contributed to water leakage into Lube Oil System.
"B" Emergency Generator declared inoperable
/ "'
and was under a 7-day LCO limit that caused the Reactor shutdown.
"B" Emergency Generator was repaired and returned to service.
f
- ~
I 2
3 4
Method:.
Exl'.ibit G. Instrections F: Forced Reason:
1.Manust for Preparation of Data S: Scheduled A Equipment Failure (Explain) 8-Maintenance or Test 2-Manual Scram.
Entry Sheets for Lacensee
- 3. Automatic Scram.
Event Report (LER) File (NUREG-C.Refveling D.Regulaiory Restriction 4-Other (Explain) 0161)
EOperator Training & Ucense Examination 5
F. Administrative Exhibit i. Same Soutee Goperational Eiror (Explain)
~
(9/77) llother (Explain) l b
[Page 4 of 4' DOCKET NO. 050-o m UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME H.
B.
Robinann DATE 4-%R7 COMPLETED gy Va1 erie E.
Frazier Pfarch REPORT MONTH TELEPHONE 803-383-4524
~$
5 Licensec Ev, ge, Cause & Corrective jg 3
j E5 No.
Ihate
{
3g 4
2s&
Event g7 gi Action to mv V
Prevent Recurrence y=
jgg Report a g
H 6
0302 870327 S
7.34 C
1 ZZ ZZZZZZ Unit ramped down to a cold shutdown for Cycle #12 Refueling.
i 3
4 l
2 Method:
Exhibit G -Instructions F: Forced Reason:
1 Manust for Preparation of Dets S. Scheduled A Equiprnent Failure (Explain) 2 Manual Scrarn.
Entry Sheets for I.Jerneer B Maintenance of Test 3 Automatic Scram.
Event ReporI (LER) File (NUMEG-C Refueling 4-Other (Explain) 0161)
D Regulatory Restrierion E Operator Training & License Examination 5
F Admimstrative Exhibit I Same Souvce G Operational Eirut (Explain)
~
(9/77)
IIOther(Explaini
e CP&L Carolina Power & Light Company ROBINSON NUCLEAR PROJECT DEPARTMENT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 APR 0 91987 Robinson File:
15505 Serial: RNPD/87-1512 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.
20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Sir:
In accordance with Technical Specifications 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of March, 1987.
Very truly yours, R.E.Morgab General Manager H. B. Robinson S. E. Plant VEF:sdm Enclosure cc: