Monthly Operating Rept for June 1981.Narrative Summary Encl
ML20065T422
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20065T407 List:
References
NUDOCS 8211020450
Download: ML20065T422 (7)


Text

- - . - ._ . - . -_ - _ _ _ _ - _ - __ ._

JOSEPH M. FARLEY NUCLEAR PLAhT UNIT 2 NARRATIVE

SUMMARY

OF OPERATIONS JUNE, 1981 The projected date for commercial operation is 8/1/81.

s 8211020450 810713PDRADOCK05000g R

STEAM GENERATOR TUBE INSPECTION Date of Inspection: 6/27/81.

One tube (row 37, column 19) in Steam Generator 2A was satisfactorily plugged on June 27, 1981. The defective tube was located by pressurizing the secondary side and performing a visual inspection for leaks. The defective tube was discovered prior to an inservice inspection. This information is submitted for information only.

2 e

OPERATLNG DATA REPORT DOCKET NO. 50-364 DATE _7/1/81 III COMPLETED TELEPHONEBY W.G.Hairston$

(205)899 315 OPERATING STATUS .,

I. Unit Name: Joseph M. Farley - Unit 2 Notes : (1) Projected date for

2. Reporting Period: June, 1981 commercial operation is
3. Licensed Thermal Power (MWt): 2652 8/1/81.
4. Nameplate Rating (Gross MWe): 860 ,
5. Design Electrical Rating (Net MWe): 829
6. Masimum Dependable Capacity (Gross Mwe): 860*
7. Maximum Dependable Capacity (Net MWe): 829*
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reascr:s:

NA

9. Power LevelTo Which Restricted.If Any(Net MWe):NA -
10. Reasons For Restrictions.If Any: NA This Month Yr to-Date ' Cumulative
11. Hours In Reporting Period 720 866.2 866.2
12. Number Of Hours Reactor Was Critical 338.3 681.5 681.5
13. Reactor Reserve Shutdown Hours 185.1 211.5 211.5
14. Hours Generator On-Line 291.7 360.5 360.5
15. Unit Resene Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 369.436.5 418,646.7 418,646.7
17. Gross Electrical Energy Generated (MWH) 85.600 95,280 95,280
18. Net Electrical Energy Generated (MWH) 67.512 72,156 72,156
19. Unit Service Factor NA NA NA
20. Unit Availability Factor NA NA NA
21. Unit Capacity Factor IUsing MDC Net) NA NA NA
22. Unit Capacity Factor (Using DER Net) NA NA NA
23. Unit Forced Outage Rate NA NA NA
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Durationof Eacht:

NA

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 7/6/81
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY 5/6/81 5/8/81 INITIAL ELECTRICITY 5/24/81 5/25/81 COMMERCIA L OPER ATION 8/l/81
  • The Nameplate Rating / Design Electrical Rating will be used for the Maximum Dependable Capacity until an accurate value can be determined from operating experience, gyf77,

. ,,o

.. 50-364

.. ._ DOCKET NO.

N i UNIT 2

/ '

- 7/1/81

... DATE s *

  1. ,7 . . . . .

J .

- W. G. Hairston, III COMPLETED BY f TELEPHONE (205) 899-5156

,yo, igg June. 1981 * .

d . .

DAY AVERAGE DAILY POWER LEVEL

  • DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe. Net) 1 186 37 303 -

2 195- .

33 267 156- g, 256 -

,, 3 261 -

20 296 4 ,

~

97 21 ' 351 -

5 113 g 190 , .

6 161 7 3 .,

. .' ~

g 222 y "0-k .

. gy . -

9 10 26 gg _

gj -0 .

, .3 . . .c 33 29

' 14 .

30

-o-

\ -~

,.- 15 31 __

16  : ... ,,, , , ,

. .s.. .. .- .

1

[ -

- . i INSTRUCT 10NS .

. On this formst. list the aversge daily unit power levet in MWe-Net for each day in the reporung month. Compute to i the nearest whole mepwatt.

m

, (9p7) .

g

.g

- es. .

l

_ _ _ . . . _ _ _ - - - - _ _ _ _ _ _ ~ . _ _ ,. .

v s  % ,

! i

) >

l UNIT Sil01 DOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT NAME J.M.Farlev-Unit 2 DATE 7/1/81 June, 1981 , COMPLETED BY W.G.Hairston.III REPORT MONTil TELEPHONE (205)899-5156 I ,, .

- E E

, ,$E 3 yYN Licensee ,Eg . Cause & Currective No. Date g 5g M 2s5 Event gy mo l*1 gu Action to 8- yI 5 g gjj g Report # g Prevent Securrence c5 Continued Phase III Testing at various reactor power levels.

005 810603 F 7.7 A 3 NA HH VALVEX Unit tripped due to..a blown fuse in the S/G 2B feed regulating valve control loop resulting in a low level trip with steam flow greater than feed flow.

006 810605 F 11.1 G 3 NA HH INSTRU Unit tripped on S/G 2B high-high level caused by a transient induced while preparing to perform Phase III Test-ing of SGFP speed control.

w a
007 810606 F 9.2 H 3 NA EB XXXXXX Unit tripped on main generator high H temperature when the turbine build-2
ing Service Water isolation valve j closed as a result of being adjusted to the wrong setpoint.

1 2 3 4 3 F: Forced Reason: Method: Exhibit G. Instructions

S
Sclieduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i D Maintenance of Test 2 Manual Scram. Entty Sheets for Lkensee

! C Refueling 3 Automatic Scram. Event ReporI (LER) File (NUREG. <

D-Regulatory Resniction 4-Other (Explain) 0161)

E-Operator Training & IJcense Examination

, F-Administrative 5

G Operational Error (Explain)

" Exhibit I - Same Source (9/77) Il Other (Explain)

m ~ .t

) -> .

UNIT SilulDOWNS AND POWER REDUCTIONS DOCKETNO. 50-364 UNIT N AME J.M.Farley-Unit 2 DATE 7/1/81 REPORT MONTil June, 1981 COMPLETED BY W.C.Hairston.III TEl.EPIIONE (205)899-5156 e.

E E

,5 g 3 $h Licensec Eg je. Cause & Corrective No. Date g Eg s .3 s s Event g3 g3 Action to 6- yE 5 Report # mO u j g5 g g Prevens llecurrence 6

008 810608 S 158.2 B 3 NA RB ZZZZZZ Unit tripped during Phase III Negative Rate Trip Test. One week scheduled maintenance outage followed trip test.

009 810615 S 8.3 B 3 NA EA ZZZZZZ Unit tripped during" Phase III Loss of Site Power (LOSP) Test.

010 810615 S 26.3 B 4 NA IA ZZZZZZ Unit tripped during Phase III Shutdown From Outside the Control Room Test.

011 810618 S 5.2 B 1 NA HA ZZZZZZ Turbine manually tripped during Phase III Turbine Trip without Rx Trip Test.

, 012 810622 F 5.7 A 3 NA HH VALVEX Unit tripped due to blockage in the S/G 2A feed regulating valve instru-

. ment air line causing S/G low level.

I 2 3 -4 i F: Forced Reason: Mettuxt: Exhibit G. instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3-Automatic Scram. _ Event Reporn (l_ER) File INUREG-D Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & Ucense Examination F Administrative -

5 l G-Operational Error (Explain) Exhibit i . Same Source

! (9/77) Il Olher (Explain) i

v m _.

) } *'

'~

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 UNIT N AME J.M.Farley-Unit 2 DATE 7/1/81 COMPLETED 8Y W.G.Hairston, III REPORT MONTil June. 1981 TELEPflONE (205)899-5156

- E E

, .$'E 3 $ $N Licensee E v, . Cause & Currective No. Date g 5g @ ,g g rE Event g? {*3 gu Action su H

$E cE jisg llepor # mO g Prevens Becurrence 6

013 810622 S 196.6 H 1 NA CI HTEXCll Unit manually shutdown to investigate and repair tube. leak on S/G 2A.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance of Test 2-Manual Scram. Entry Sliccis for Licensee i

C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG.

I D-Regulatory Restriction 4 Other (Explain) 0161)

E-Operator Training & Ucense Examination

. F Administrative -

5 l G-Opera 6ional Error (Explain) Exhibii 1 Same Source

' Il Other (Explain)