Part 21 Rept Re Matl Stamped w/non-low Stress Stamps,In Violation of Util Purchase Order.Stamping Done Prior to Solution Heat Treatment.Heat Treatment After Marking Would Minimize Any Local Stresses
ML20054H301
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/16/1982
From: Peters P
MCJUNKIN CORP.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-PT21-82-663-000 PT21-82-663, PT21-82-663-000, NUDOCS 8206230215
Download: ML20054H301 (12)


Text

s

$N GENE R AL OF FICES, CH ARLE STON. w vA, sRaNCHES IN PRINCIPAL ANDUSTRI AL CENTERS P O. B O x 513 -

CH ARLESTON WE5T ViRG1NIA 25322 r, .s a June 16, 1982 'I I U [Y' Nuclear Regulatory Commission il 2 l l'M2 611 Ryan Plaza Drive Suite 1000

  • L ----

Arlington, Texas 76011 Attention: Mr. John Collins

Subject:

Reporting of a Nomcompliance per 10CFR Part 21

Dear Mr. Collins:

McJunkin Corporation has received f rom Carolina Power & Light a Deficiency and Disposition Report (DDR #841) which states that they received two items of material which has been die stamped with non-low stress stamps. Since Carolina Power & Light's purchase order requested stamping with low stress stamps to prevent sharp discontinuities, the stamping done was in violation of their purchase order and, due to the nature of the problem Carolina Power & Light reported the situation to the Nuclear Regulatory Commission (NRC) under the requirements of 10CFR50.55E.

McJunkin has been asked to report this noncompliance under the provisions of 10CFR Part 21. Enclosed for your information, therefore, is:

1. Carolina Power & Light's DDR #841
2. Carolina Power & Light's letter informing McJunkin of the situation
3. McJunkin's CAR (#154) to Flowline (manu-facturer involved)
4. Flowline's letter in response to McJunkin's Corrective Action Request Should you require additional information, please feel free to call.

Sincerelv P. E. Peters QA Manager PFP/pw Enclosures cc: Bill Buckner Carolina Power & Light 8206230215 820616 PDR ADOCK 05000400 S PDR

[dO. -k N FLOWLINE CORP. - m_, .

4 NEW CASTLE, P E N N S Y LV A N I A 16103 k'_

M ANUFACTURERS OF CORROSION. RESISTANT FLOWLINE e "mm m-s April 15, 1982 Mr. P. E. Peters Q. A. Manager McJunkin Corporation P.O. Box 513 Charleston, WV 25322

Reference:

Your Order #16-71378 Our Order #8-8372 Carolina Power & Light Order #11-23910 McJunkin CAR #154

Dear Mr. Peters:

Please refer to your CAR #154 regarding the marking of 2 pcs. of 2" Tees Ilt. #51794 and 2 pcs, of 2"x3/4" Conc. Reducers Ht. #56077.

Review of our Production Order indicates that the instruction issued to our shop was that the heat number on both of these items was to be applied by using a low stress stamp. However, as reported by your customer, a non low stress stamp may have been used. As of this date, we have removed any non low stress steel stamps from our Marking Department so this problem should not occur in the future.

May we suggest that your customer return these parts to us for full credit or alternately we could remove the stamp by grinding and reapply the heat number by eithet electro etch or vibro tool marking. Unfortunately, we do not have in our inventory additional pieces tc, replace and quantity is not sufficient for production.

We would like to point out that the stamping was done prior to solution heat treatment and in our opinion the heat treatment af ter marking would have minimized any local stresses. Ue believe that the use of a non low stress steel stamp and subsequent solution annealing the parts would introduce less stress than by using a low stress stamp and not heat treating after marking.

Incidentally, the " Code" does not require heat treatment after low stress steel stamping which is detrimental to Stainless Steel.

CURPORATP APPkOVED ^

59nuL e d %dP- Dolwd -

K

, __. . _ - . ._ .. __- . _ . . _ - .. ~ . -_ .. _. -

FLOWLINE. CORP.

N EW C A STLE. PEN N SYLVANI A Mr. P. E. Peters April 15, 1982 We hope that we have answered your complaint and apologize for any inconvenience we may have caused you.

Sincerely, FLOWLINE CORP.

bfll ff/V1l E. H. Leimbacher Vice President - Operations and Q. A. Manager EllL:cbm 1

I J

l

@ M*Junkin C O R P O R ATI O N

@g FODRPPTTVR AFTTON DFOf1F9T O_A_F_ 1012 Dato Issued: ,_79_a2 CAR # I54 McJunkin/ Customer Purchase Order carniinn Power & Tiche H-?R910 To Flowline Corporation From: P. E. Peters PO Box 860 Mc3nnkin cornornrinn New Castle. PA 16103 PO Bnr 511 Attn: Mr. R. Mohn chnvlonenn. UV 751??

Deficiency: Contract /PO y Product Inspection / Testing Specification System Procedure x Other (Explain) Materin1 Mnrteine Techninuns i

References:

Flowline Order No. 8-8372 McJ. Order 16-71378 l Item No. 12 - 2" Sch. 40 Tee HT. #51794 Item No. 17 - 2" x 3/4" Sch. 40 Conc. Red. HT #56077 CP&L DDR #841 .

Description of Deficiency: Heat Numbers on subject fittings were applied by the vendor with non-low stress stamps. This was determined during a 100% reinspection of stamping techniques utilized on vendor supplied ASME Stock pipe & fittings currently in CP&L warehouse storage.

Corrective Action Request: Please submit to McJunkin:

a) The cause of this problem (is it an isolated case or inherent problem) .

b) Method of resolution provided with back-up information.

c) What prevenative measures will be taken to prevent recurrence.

McJunkin Q.A. Evaluation of Action Taken:

Corrective Action Evaluation: Accepted Rejected Follow-up Verified Date IT IS REQUESTED THAT A REPLY AS TO CORRECTIVE ACTION TAKEN 'BE ATTACHED TO THIS FORM AND SUBMITTED WITHIN 30 DAYS OF THE ABOVE ISSUED DATE, IN THE EVENT CORRECTIVE ACTION CANNOT BE COMPLETED WITHIN THE SPECIFIED DATE, REQUEST DATE SAME WILL BE CONCLUDED.

~9 d P. E. Peters

/ ,

Corporate QA Manager k _ _ _ _ . . _

IONII i ' T 1 ~S - ey S h u./

G LN CR AL oFf eC E S. CH ARLC 51uM. W. VA, BR ANCHES 6N PRINCIPAL INDUSThiAL CLNICNb 63 O.uOA bI3 .

CHARLCSTON*WC5T VIRG8NiA*25322 March 29, 1982 Flowline Corporation PO Box 860 -

New Castle, PA 16103 Attention: Mr. Robert Mohn

Subject:

McJunkin Order #16-71378 Flowline Order ' #8-8372 Carolina Power & Light Order #H-28910 McJunkin CAR #154

Dear Mr. Mohn:

McJunkin's attached Corrective Action Request (CAR #154) is <

result of having received a Deficiency and Dispositlun Report (DL,.

from Carolina Power & Light concerning the stamping used on Items 4.

17 of the subject, purchase order.

We have been informed that, due to the nature of this problem, Carolina Power & I.ight has reported this deficiency to the Nuclear Regulatory Commision (NRC) under the requirements of 10CFR 50.55E.

Your prompt attention to this matter will be appreciated.

Sincerely, P. E. Peters QA Manager PEP /pw .

Attachment l

4 6 __ _ - - _ . _ _ _ _ _ - _ _ _ . - - _ _ _ . _ - .

Cp&L w asy Carolina Power & Light Company t  ? ' N LI4" ' 2 "'d . 'f i Z ". ' T""l * " T ? ; '.-7 Ir 'I P.O. Box 101, New Hill, N.C. 27562 March 24, 1982 t

McJunkin Corporation PLS-3924 P.O. Box 513 1400 Hansford St.

Charleston, W. VA. 25322 Atta: Mr. Robert Maxwell - Sales Dept.

CAROLTNA POWER AND LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT 7 1985-89 900,000 KW UNITS 1 & 2

, 7 i

Reference:

Attached DDR #841; CP&L Order No. H-28910, dated 9/26/80

/

Dear Mr. Maxwell:

i To confirm telecon of 3/22/82 between yourself and Mr. Bill Buckner (CP&L),

7 find attached a copy of Deficiency and Disposition Report (DDR) #841 con-cerning the stamping used on Items 12 and 17 of the above referenced CP&L purchase order number.

Due to the nature of this problem, CP&L has reported this deficiency to the Nuclear Regulatory Commission (NRC) under the requirements of 10CFR 50.55E. .

In keeping with proper procedures for resolution of such deficiencies,

, McJunkin is hereby requested to submit to CP&L a Corrective Action Report addressing the following:

a) Method of resolution provided with back-up information.

b) The cause of this problem (is it an isolated incident or a generic problem).

, c) What preventative measures are being taken to avoid re-occurrence of this problem, i Your prompt attention concerning this matter is appreciated.

Very truly yours, A- '

oQ Tom L. Harrington Principal Buyer -

Harris Project

, TLH/WB/sd i Attachment cc: T. Alderson W. T. Buckner B. B. Ford

t.AdVL.INA l'UW a 6 1.1 ten i t.UnrAa 1 (A-1 iih p,II 1 CORPOPATE QUALITY ASSURANCE DEPARTMENT 5/8/81 \

DDR Na. 841 3ev a DEFICIENCY AND DISPOSITION REPORT _

Page 1 of 1 te:/Ac tivity Name or Description Shop Order Code Quantity Unit Quality Assurance Nur Migr. 5.ress Stamping of SA-403, Class 2 Each (Purchase Order & It<

- 2 ^ :. , Fel , S c h . 40 Fittines N/A 3 4 Total 1,2 No.) OA H-28910-12, crial, Heat or Other Identification Supplier or Manufacturer Type of Procurement CCCP&L PO OTrans fe r Ca (S pe cif y) Item 12 - 51794 'McJunkin Corp.

Item 17 - 56077 Charleston, W. VA C3 A-E Po ONSSS PO rioistion (Specificatson, Drawing, Procedure or Other) NCR No. Reporting Inspector ASME Code Section III N/A D. J. Holler hficiency Details: DDR EVALUATION X Construction Phase Heat numbers on subject fittings were applied by the vendor

  • Engineering Phase with non-low stress stamps. This was determined during a QA Program Violation 100% reinspection of stamping techniques utilized on vendor X Specification Deviati supplied ASME stock pipe and fittings currently in Warehouse # "* "## * ""U" storage. Unacceptable Work =ane Damage Subject items had been previously accepted by QA. O the r Item 12 - 2" straight tee, .154" wall thickness Not Reportable
  • Site QA Engr. HE QA/QC Item 17 - 2" X 3/4" Conc. Reducer, .154" X .113" wall thickness Evaluated by Da te "Under evaluation by NPCD.

h '

_Ua SECTION lil /b /4/Z m 3,,0,82 QA/Q8 Specialist

& Hold Tags Applied

-inal Di sro si tion: VerifiedQ Hold / Reject tags removed Q kma rk s :

QA/QC Inspector Date Accepted By:

OA/QC Soecialist Date Distr.tution:

ANI Concurrence ( ASME Code Section III Items Only):

Orig: Director - QA/QC - SHh7 cc: Site Mgr./Sr. Res. Engr.

Initiating QA/QC Specialist Accounting Authorized Nuclear Inspector Date Mgr. - ESC QA/QC Rep et Closed:

OM . - HPES D A-E Site QA Representative O SSSS Site Representative Date n 0:t X E. '<lillett Director QA/QC - SHNP

[i 14li i 4 in ~JL-v #~4-+~

GEN CN AL OF FIC ES. CH AHL CSTON W. VA, DN ANCH[5 GN PRINflPAL INDU5f HaAL CENTENb P. O . D O X 583

  • CHARLCSTON*WCST ViRG1N1A* 25322 April 19, 1982 Carolina Power 6 Light Company ,

PO Box 101 New 11111, NC 27562 Attention: Mr. Tom L. Ilarrington

Subject:

CP6L Order #11-28910 DDR #841

Dear Mr. liarrington:

Enclosed is a copy of CAR #154 issued by McJunkin to Flowline Corporation who manufactured and marked the material in question and a copy of their resolution to the problem.

We hope that this resolves the problem satisfactorily, and we apologize for any inconvenience the problem has caused.

Sincerely, P. E. Peters QA Manager PEP /pw Enclosures cc: Bob Maxwell T. Alderson

e

__ .- Whtf M V,/

, ,,GLN CHAL of f SCC 5. CH ARLC&1uN. W. VA. DRANCHC5 IN PRINCIPAL ANDUSTHIAL CLh1LHb p,o.uOx 583

  • GHARLCSTON.WCST V i H G i N 4 A
  • 2 b 3 i' 4 March 29, 1982 Flow 11ne Corporation PO Box 860 -

New Castle, PA 16103 Attention: Mr. Robert Mohn Subj ect : McJunkin Order #16-71378 Flowline Order #8-8372 Carolina Power & Light Order #H-28910 McJunkin CAR #154

Dear Mr. Mohn:

McJunkin's attached Corrective Action Request (CAR #154) is <

result of having received a Deficiency and Dispositlun Report (DD.

f rom Carolina Power & I ight concerning the stamping used on Items 4.

17 of the subject purchase order.

We have been informed that, due to the nature of this problem.

Carolina Power & Light has reported this deficiency to the Nuclear Regi'latory Commision (NRC) under the requirements of 10CFR 50.55E.

Your prompt attention to this matter will be appreciated.

Sincerely, CPe.C%

P. E. Peters QA Manager PEP /pw Attachment

'MT

(

Hitlunkin c O R P O R ATl O N

@g connFFTTVP AFTTON REOHEST O_A_P. 1012 Dato Issued: a _. ? 9_ m>

CAR C l54 McJunkin/ Customer Purchase Order Carolina Power & T.icht 11-2 R 910 To: P1owline Corporation From: P. E Peters PO Box 860 Mc .T unk i n Ccrnoration New Castle. PA 16103 PO Tiox 511 Attn: Mr. R. Mohn chnvlonenn. WV 751??

Deficiency: Contract /PO x Product Inspection / Testing Specification System Procedurc x Other (Explain) Material Markine Technianon

References:

Flowline Order No. 8-8372 McJ. Order 16-71378 Item No. 12 - 2" Sch. 40 Tee llT. #51794 Item No. 17 - 2" x 3/4" Sch. 40 Conc. Red.11T #56077 CP&L DDR #841 .

Description of Deficiency: Heat Numbers on subject fittings were applied by the vendor with non-low stress stamps. This was determined during a 100% reinspection of stamping techniques utilized on vendor supplied ASME Stock pipe & fittings currently in CP6L warehouse storage.

Corrective Action Roquest: Please submit to McJunkin:

a) The cause of this problem (is it an isolated case or inherent problem).

b) Method of resolution provided with back-up information.

c) What prevenative measures will be taken to prevent recurrence.

McJunkin O.A. Evaluation of Action Taken:

Corrective Action Evaluation: [ Accepted Rejected Follow-up Verified Date '.

IT IS REQUESTED TIIAT A REPLY AS TO CORRECTIVE ACTION TAKEN 'DE ATTACHED TO THIS FORM AND SUBMITTED WITHIN 30 DAYS OF THE ABOVE ISSUED DATE, IN THE EVENT CORRECTIVE ACTION CANNOT T5~ COMPLETED WITHIN THE SPECIFIED DATE, REQUEST DATE SAME WILL DE CONCLUDED.

P. S. Peters

'9 ud

/ ,

Corporate QA Manager O

$[e O. -h-b FLOWLINE CBRR ,p 4_ (f -

NEW CASTLE. P E N N S Y LV A N I A '

16:o3 M ANUFACTURERS OF CORROSION-RESISTANT FLOWLINE, WELQiNG FITTINGS April 15, 1982 Mr. P. E. Peters Q. A. Manager McJunkin Corporation P.O. Box 513 Charleston, WV 25322

Reference:

Your Order #16-71378 Our Order #8-8372 Carolina Power & Light Order #H-28910 McJunkin CAR #154

Dear Mr. Peters:

Please refer to your CAR #154 regarding the marking of 2 pcs. of 2" Tees lit . #51794 and 2 pcs of 2"x3/4" Conc. Reducers Ht. #56077.

Review of our Production Order indicates that the instruction issued to our shop was that the heat number on both of these items was to be applied by using a low stress stamp. However, as reported by your customer, a non low stress stamp may have been used. As of this date, we have removed any non low stress steel stamps from our Marking Department so this problem should not occur in the future.

May we suggest that your customer return these parts to us for full credit or alternately we could remove the stamp by grinding and reapply the heat number by either electro etch or vibro tool marking. Unfortunately, we do not have in our inventory additional pieces to replace and quantity is not sufficient for production.

We would like to point out that the stamping was done prior to solution heat treatment and in our opinion the heat treatment after marking would have ndnimized any local stresses. We believe that the use of a non low stress steel stamp and subsequent solution annealing the parts would introduce less stress than by using a low stress stamp and not heat treating after marking.

Incidentally, the " Code" does not require heat treatment after low stress steel stamping which is detrimental to Stainless Steel.

CORPORATF APPROVED S;gn@ ; j

  • 4 DokA

FLOWLINE CORP.

N EW C A STLE. P E P4 N S Y LV A N I A Mr. P. E. Peters April 15, 1982 We hope that we have answered your complaint and apologize for any inconvenience we may have caused you.

Sincerely, FLOWLINE CORP.

Y///V/fVI)

E. H. Leimbacher Vice President - Operations and Q. A. Manager EllL: chm O