MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20207G2961986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20133N6201985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program 05000286/LER-1994-010, :on 941007,concluded That at Least Two EDGs Inoperable During June 1992 Surveillance Test of Carbon Dioxide Fire Protection Sys.Caused by Inadequate Procedural Guidance.Surveillance Test Revised1994-11-0707 November 1994
- on 941007,concluded That at Least Two EDGs Inoperable During June 1992 Surveillance Test of Carbon Dioxide Fire Protection Sys.Caused by Inadequate Procedural Guidance.Surveillance Test Revised
ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20044B8461993-03-0404 March 1993 Part 21 Rept Re Possible Safety Implications in Motor Operated Valve Evaluation Software Program Re Use of Total Thrust Multiplier.Utils Advised of Problem & Recommended Corrective Action in Encl Customer Bulletin 92-06 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program JPN-90-035, New York Power Authority Annual Rept for 19891989-12-31031 December 1989 New York Power Authority Annual Rept for 1989 ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 05000286/LER-1989-013-01, :on 890702,contractor Security Guard Was Found Asleep at Duty Post.Caused by Cognitive Personnel Error. Contract Security Officer Involved in Event Was Dismissed. All Security Personnel Reapprised of Responsibilities1989-07-28028 July 1989
- on 890702,contractor Security Guard Was Found Asleep at Duty Post.Caused by Cognitive Personnel Error. Contract Security Officer Involved in Event Was Dismissed. All Security Personnel Reapprised of Responsibilities
ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point 05000286/LER-1989-007, :on 890321,unauthorized Access Into Protected Area by Former Employee Utilizing Photo Identification Badge of Another Contract Employee Occurred.Caused by Security Guard Error.Security Retrained1989-04-17017 April 1989
- on 890321,unauthorized Access Into Protected Area by Former Employee Utilizing Photo Identification Badge of Another Contract Employee Occurred.Caused by Security Guard Error.Security Retrained
ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept 05000286/LER-1989-001, :on 890204,initiated Safety Injection Via High Steam Flow Safety Injection Logic.Caused by Uneven Refilling of Steam Flow Instrumentation Lines.Safety Injecton Terminated & Plant Cooldown Proceeded1989-03-0303 March 1989
- on 890204,initiated Safety Injection Via High Steam Flow Safety Injection Logic.Caused by Uneven Refilling of Steam Flow Instrumentation Lines.Safety Injecton Terminated & Plant Cooldown Proceeded
ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed 05000286/LER-1989-003-01, :on 890205,security Gate Found Unlocked.Caused by Cognitive Personnel Error.Upgrade of Security Procedure 4, Compensatory Measures to Clearly Define Methods of Establishing,Maintaining & Closing Posts Performed1989-02-23023 February 1989
- on 890205,security Gate Found Unlocked.Caused by Cognitive Personnel Error.Upgrade of Security Procedure 4, Compensatory Measures to Clearly Define Methods of Establishing,Maintaining & Closing Posts Performed
ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 1999-02-09
[Table view] |
Text
9 OPERA TLNG DATA REPORT DOCKET NO.
50-286 3
DATE 9-4-81 COMPLETED BY C. Connell TELEPHONE (914) 739-8200 OPERATING STATUS Notes
- 1. Unit Name: Indian Pnin e Nn _1 Nnc1 g,v pnugr pl an e
- 2. Reporting Period:
Annunt 1981
- 3. Licensed Thermal Power (MWt):
1025
- 4. Nameplate Rating (Gross MWe):
1013 S. Design Electrical Rating (Net MWe):
965
- 6. Sf aximum Dependable Capacity (Gross 5tWe):
926
- 7. Maximum Dependable Capacity (Net MWe):
891
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NONE
- 9. Power Level To Which Restricted. If Any (Net MWe):
607 MWE (At Unity Factor)
- 10. Reasons For Restrictions. If Any:
Unit load restricted to the capacity of one main transformer.
This Month Yr..to.Dat e Cumulative
- 11. H:urs in Reporting Period 744 5831 43.872
- 12. Number Of Hours Reactor Was Critical 734_2 4370.7 11.1?n_7
- 13. Reactor Resene Shutdown Hours 0
0 0)
- 14. H:urs Generator On-Line 727.1 4284.7 29,987.8
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1,441,828 8,852,173 76,483,443
- 17. Gross Electrical Energy Generated (MWH) 398,220 2,454,480 24,045,981
- 18. nit Electrical Energy Generated (MWH) 374 452 Mfi.,2,3 7 23,03(r;397
- 19. Unit Service Factor 97.7 73.5 6fi. 4
- 20. Unit Availability Factor 97.7 73.5 68.4
- 21. Unit Capacity Factor (Using MDC Net) -
56.5 44.6 58.9
- 22. Unit Capacity Factor (Using DER Net) 52.2 41.2 54.4
- 23. Unit Forced Outage Rate 2.2 21.0
' ' 5^_ 2
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
m une in Sentember to connect new inain transformer.
Rofnelino outane in Januarv.
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast.
Ac'hieve'd '
INITIA L CRITICALITY N/A N/A INITIA L ELECTRICITY N/A N/A
~
COMM ERCIA L OPERATION N/A N/A s-(9/771 8203310467 B10914 PDR ADOCK 05000286
~
AVI:lt AGl; DAILY UNII POWI:lt 1.1. VEL DOCKET NO.
4 9- "f.
l eid s.iM'iii n t UNIT 180 3 DATE 9-4-81 COh1PLETED Ily C. _Conne11 TELEPl!ONE 914-739-8200 A!ONTl!
Auoust 1981 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (51We Net)
(51We Net)
I 515 j7 516 2
s17 IS 514 3
516 19 516 4
516
~
516 20 5
515 21 519 515 6
521 22 7
518 23 515 8
518 24 516
~
9 519 513 25 10 518 26 283 519 27 355 12_
518 28 515 13 517 29 518 521 14 514 30 520 15 514 3g 16 -
517 INST 110CTIONS 1
01: t!iis fossiiat. list alie aserage daily unit power levelisi h!Wc. Net for cach day in the reporting inonth. CornPure to the nearest syhole niegawatt.
(9/77) l
=
UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-286 UNIT N ole _Inatan om nt tinit 3 DATE 9/4 /81 COMPLETED DY r conne!!
REPORT MONT11 wme ioni TELEPI(ONE 914-739-9200 "L
.=E ?
g
.,.s X Licensee E*
ei c
E Cause & Currective E."1 No.
Date g
3g jg5 Event u?
o Action to 8: 3 j di j Report #.
rE0
}O Prevent Recurrence
=
O 07 810826 F
16.9 B
3 N/A IA CKTBKR Malfunction of reactor trip breaker A
Cell switch during surveillance testing. Modified reactor trip breaker Cell switch mounting.
8 i
I I
2 3
4 F: Forced
' Reason:
Method:
Exhibit F Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B Maintenance or Test 2 Manual Scram.
Entry Sheets for Licensee C Refocling 3 Automatic Scram.
Event Repor (LER) File (NUREG-D Regulatory Restrietion 4 Other(Explain) 0161)
E Operator Training & License Examination F Administrative 5
G-Operational Errut (Explain)
(9/77)
Il O her(Explain)
Exhibi.H - Same Source
9 N
h O
t I
n T
o C
M A
1 8
9 E
1 V
I t
T s
C u
E t
g R
e r
r u
R k
e e
A O
s p
w C
a i
o G
W l
B d
d e
d e
t c
e t
l a
n s
i l
a
~u u
p e
j b
e l
d e
R C
A R
O 9
NO I
T T
R C
e t
N C
a U
P t
E E
o n
I r
e R
A d
E M
o e
C k
t z
N a
i A
e t
e N
L l
S u
E t
c r
T e
P i
e N
n A
f w
I n
f o
A o
i i
l M
B H
D B
Y r
L e
3 I
I t
1 T
s N
y R
O S
M r
e o
l t
p i
m n
T a
o N
S r
r M
E e.
e M
t r
n n
P n
i i
o I
a a
a i
U l
r r
t Q
o t
t a
E oF S
S i
C6 d
5 n
n a
r9 r
r R
o u
u t e Z
Z t
cv n
al 1
6 a
ea 3
3 l
RV P
5 R.
8 7
1 9
8 2
2 0
W 1
2 2
2 2
2 2
2 E
1 3
3 4
T 2
1 0
2 A
D 7
8 8
7 e
MO!1T11LY I & C CATEGORY I REPORT August 1981 Month Date W.R.
Fquipment Malfunction Corrective Action 4-18-81 IC-1-1217-2 TM-431-D rod Insertion Ifi Limit Trim Potentiometer Replaced Potentiometer inoperable 5-13-81 IC-1-1267-2 Reactor Protection Instru-Test Signal Erratic Replaced Test Potentiometer mentation Test Signal Potentiometer 7-22-81 IC-1-1319-2 CCR Air Conditioner Thermostat Malfunctions Cleaned & Repaired Thermostat 7-22-81 IC-1-1244-2 Instrument Air Cooling LCV Controller No't Functioning Blowdown Air lines & cleaned Expansion Tank Level Con-controllers trol valve 7-22-81 IC-1-1264-2 Nuclear Instrumentation Percent Power meter on Drawer Replaced meter Power Range No. 43 reads 2% high 7-22-81 IC-1-1231-IC Boric Acid IIeat Trace Alco Temp. Alarm up with Circuit Tightened loose connection &
Circuit #6 Deenergized recalibration switch 7-22-81 IC-1-1262-2 Computer No output from points Y9055A Rewired points to revised Y9058A, Y9061A, Y9054A, Y9057A prints Y9060A 7-22-81 IC-1-1238-2 Pasquill Indicator Display has superimposed digits Tightened loose connector on Circuit Board 7-22-81 IC-1-1035-2 Flo. 34 Steam Generator Indication Failed Iligh Replace thermocouple Temperature wire at Manway of 34 S.G.
s f
SUMMARY
OF OPERATING EXPERIENCE AUGUST 1981 Indian Point Unit 3 was synchronized to the bus for a total of 727.1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, producing a gross generation of 348,220 MWE for this reporting period.
The Uni _t experienced one trip on August 26, at 1341 hours0.0155 days <br />0.373 hours <br />0.00222 weeks <br />5.102505e-4 months <br />. The problem occurred while restoring the reactor trip breakers to a normal status at the completion of reactor protection system testing.
The cause was founa to be improperly supported cell switches associated with main reactor trip breaker "B".
A modification was performed to improve the support to the cell switches.
The unit was returned to service at 0635 hours0.00735 days <br />0.176 hours <br />0.00105 weeks <br />2.416175e-4 months <br /> on August 27