Monthly Operating Rept for Apr 1980
ML19305E859
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/01/1980
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML19305E856 List:
References
NUDOCS 8005200533
Download: ML19305E859 (5)


Text

_

l

. . . \

. l S0052 oo g33 O OPERATING DATA REPORT i

DOCKET NO. _50-348 DATE _3/ u du COMPLETED BY _W. G. Hairston, II 1

, TELEPHONE md) ovv-5156 1 OPERATING STATUS n _

1. Unit Narne: J seph M. Farley - Unit 1 dotes
  • 1/ Cumulative data since
2. Reporting Period: Aoril, 1980 ' 12/1/77, date of comm'ercial 2652 opera tion. {
3. Licensed Thermal Power (MWr): i

, 4. Nameplate Rating (Gross MWe): 860 S. Design Electrical Rating (Net MWe): 829 e

6. Maximum Dependable Capacity (Gross MWe): *860 *
7. Maximum Dependable Capacity (Net MWe): *829
8. If Chanj;es Occur in Capacity Ratings (items Number 3 Thmugh 7) Since Last Report. Give Reasons:

N/A 1

)

g l

9. Power Level To Which Restricted. If Any (Net MWe): N/A .
10. Reasons For Restrictions.If Any: N/A This.MontlL Yr,ts-Data. ' r.o., ore:,,,

II. Hours In Reporting Period c 719 2,903 . 21,167

12. Number Of Hours Reactor Was Critical 719- 2.466.6 13,402.1

' 13. Reactor Reserve Shutdown Hours 0 436.4 1,841.7

14. Hours Generator On-Line 719 2,403.7' 12,994.2
15. Unit Reserve Shutdown Hours .

- 16. Gross Thermal Energy Generated (MWH) 1,870,269.9 6,031,784.3 , 32,629,798.7 .

17. Gross Electrical Energy Generated (MWH) 602,082 _ 1,947,668 . 10,471,706 -
18. Net Electrical Energy Generated (MWH) _- 571._75 P 1.837,622 9 885,802
19. Unit Service Factor . 100 82.8 61.4

. 20. Unit Availabil*ty Factor 100 82.8 61.4

21. Unit Capacity Factor (Using MDC Net) -

'45.4 -

76.4 56.3

, 22. Unit Capacity Factor (Using DER Net) 95.9 76.4 56.3 -

23. Unit Forced Outage Rare 0.0 5.1 7.0
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Durst' ion of Eacht: l N/A
25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Foreca.st , Achiesed INITIAL CRITICALITY 8/6/77 -

8/9/77 INITIAL ELECTRICITY 8/20/77 Ne E COMMERCl,\L OPERATION 12/1/77 ,, 12/1((f

  • The Nameplate' Rating / Design Electrical Rating will be used .for the Maximum

)

Dependalle t Capacity until an accurate value can ,be determined frcm operating experier.c e. . .

)

(w/77)  !

t

  • O

. g ...

l

,,y,w- w --, ,- ,-

~

~

AVERAGE DAILY UNIT POWER LEVEL ,

50-348

. DOCKET NO.

1 WT DATE 5/1/80 COMPLETED BY W. G. Hairston, III

/ TELEPHONE (205) 899-5156 MO.Vni April ,

DAY AVERAGE DAILY POWER LEVEL. DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 651 805

!. 37 2 699 .

33 809 3

806 g, 796 4 806 20 806 5 816

  • 809 6 817 807 22 7 813 810 23 8 801 806 24 9 816 804 25 10 755 26 799 11 813 768 3 ,

12 796 812 3

13 795 811 14 809 811 30 15 780 ___

.. 3l 801 -

16  ;

INSTRUCTIONS On this format. list the aversge daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearen whole megswatt.

. (9(17)  :

I a . . .

. . . .m

s DOCKET NO. 50-348 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME J .M. Farlev - Unit 1

  • DATE s /1/Rn COMPLETED BY W. G. Itairston, III REPORT MONTil Anril TELEPHONE (205) 899-5156 e.

._ E c

, .5 ? 3 j Y"4 Licensee P, *g e. Cause & Currective Action to No. Date g 3g s jg5 Event g?

mV g3U F y: 5 j gg g Report a g Prevent Recurrence 6 -

032 800401 F 35.0 11 NA NA 1111 ZZZZZZ Continued power reduction from 3/31/80. Unit being held at 700 MWe for secondary side trouble-shooting and maintenance.

033 800402 F 6.2 11 NA NA lill ZZZZZZ Unit power increased and held at 770 MWe for secondary side trouble-shooting and maintenance.

034 800410 F 9.6 i: NA NA - IA INSTRU Unit power reduced and held at 700 MWe to troubleshoot Nuclear Instrumentation spiking on Channel N44. I&C concluded that the spiking probably resulted from a momentary dip in inverter voltage; however',.

the cause of the inverter dip i was'not determined, i 2 3 4 F Iorced Reason: Method: Exhibit G-Instructions

' Scheduled A Equipment Failure (Explain) l-Manual for Prepasation of Data

. B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG- ,

D Regulatory Restriction 4-Other (Explain) 0161)

E Operator Training & License Extmination F Administrative 5 G-Operational Error (Explain) Exhibit I- Same Source (9/77) Il-Other (Explain) i  ;

DOCKET NO. 50-348 UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME .T . M . Farley - Unit 1 DATE 3/1/6u ,

W.G. Hairston, III April COMPLETED BY REPORT MONTil TELEPilONE (205) 899-5156

- B E c a., Cause l Corrective

, .! E 3 jY5 Licensee h No. Date g-H 3g s ,g g 5

=

Event Report u 3,1 mu f3 o O Action to Prevent Recurrence f= 5.e if3! u 6

035 800412 S 5.1 B NA NA IIA VALVEX Unit was reduced to and held at 765 MWe for Main Turbine Governor Valve Testing.

036 800415 F 11.3 J NA NA lill ZZZZZZ Unit was reduced to and held at 770 MWe for secondary side trouble-shooting and maintenance.

037 800419 S 3.8 B NA NA IIA VAINEX Unit was reduced to and held at 770

038 800426 S 2.6 B NA NA lit. VALVEX Unit was reduced to and held at 762 MWe for Main Turbine Governor Valve Testing.

2 3 4 I

F: Forced Reason: Method: Exhibit G -Instructions A Equipment Failure (Explain) 1 Manual for Preparation of Data S: Scheduled 2-Manual Scram. Entry Sheets for Licensee

. B-Maintenance of Test C Refueling 3-Automatic Scram. Fvent ReporI(LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination 5

F-Administrative G-Opere;oi.::' Liror (Explain) Exhibit I - San Source (9/77) ll-01her (Explain)