Text
.__
Alab:1na Pawer Company n
S005200 S y 600 N;rth 18tn Street Post Ofiic] Box 2641 Birmingham. Alabama 35291 Telephone 205 323-5341 k
/t n hbo#e',hi" int Alabama Power the scuinem etecinc system May 13, 1980 Docket No. 50-348 Director Office of Ma.nagement Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthlv Operating Data Report Attached are two (2) copies of the April, 1980 monthly operatiag report for Joseph M. Farley Nuclear Plant, Unit 1, as required b: Section l
6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a
" Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly, n
~
~_
'.*s. c m F. L. Clayton, Jr.
FLCJr/JRC:bhj Attachments l
THis DOCUMENT CONTAINS cc:
Mr. Ted Cintula (1 copy)
POOR QUAUTY PAGES Director, IE (10 copies)
Director, RII (1 copy) 00T
///
j JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS APRIL, 1980 There were seven (7) power reductions (one continued from 3/31/80) in the month of April.
The following safety-related maintenance was performed in April:
1.
Replaced "lC" diesel generator auxiliary jacket water pump.
2.
Replaced bearings and seals on "A" reactor makeup water pump.
l P
f i
.,. - -..