Alab:1na Pawer Company n 600 N;rth 18tn Street Post Ofiic] Box 2641 S005200 S y Birmingham. Alabama 35291 Telephone 205 323-5341

/t kn hbo#e' ,hi" int Alabama Power the scuinem etecinc system May 13, 1980 Docket No. 50-348 Director Office of Ma.nagement Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthlv Operating Data Report Attached are two (2) copies of the April, 1980 monthly operatiag ,

report for Joseph M. Farley Nuclear Plant, Unit 1, as required b: Section l 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Summary of Operating Experience" is included in the attached l report. l If you have any questions, please advise.

Yours very truly, n - -, - _,

~

~_ -; .. % '.*s. cm F. L. Clayton, Jr.

FLCJr/JRC:bhj Attachments l THis DOCUMENT CONTAINS cc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies) POOR QUAUTY PAGES ,

Director, RII (1 copy) 00T

///

j JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS APRIL, 1980 There were seven (7) power reductions (one continued from 3/31/80) in the month of April.

The following safety-related maintenance was performed in April:

1. Replaced "lC" diesel generator auxiliary jacket water pump.
2. Replaced bearings and seals on "A" reactor makeup water pump.

l P