Submits Interim Deficiency Rept on Omission of Rebar in Reactor Auxiliary Bldg.Corrective Action Wil Be Completed by 800301,at Which Time Final Rept Will Be Submitted
ML18003A781
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/05/1979
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To:
References
NUDOCS 8001030632
Download: ML18003A781 (5)


Text

REGULATORY ORMATION DISTRIBUTION SYS (RIDS)

ACCESSION NBRe6001030632 DOC ~ DATE: 79/12/OS NOTARIZED ~ NO DOCKET I'ACI'L:SO-000 Shearon Har ri s Nucl ear Powei Pl anti On) t 1i Carol ina OSO0OV05 AQTH ~ NAME AUTHOR AFFllrATION CHIAAGI<N,J. Carolina Power L Light Co.

RECIP NAME HEGIRA'IKNT AFFILIATION

SUBJECT:

Submits interim rept on ommission of rebar fn reactor auxiliary bldg. Corrective action will be comp)et'ed by 800)01iat which time final rept will'be submitted,

~ ~

DISTRIBUTION CODE ~ 8019S COPIES RECEIVED ~ leTR $ ENCL L SIZE!

TITLE: Construct)on Deficiency Report (10CFRSO ~ SEE)

  • ~ ~

,' ~

NO T K S ~ ~oaereemmwmaeeeeeweeewm~eeeeawwmweeeeeeweswm~ee~~'weewweammeemwwwww~eoeeaemwmm~ee RECIPIENT COPIES RECIPIENT COPIES ID COOKiNAME L'TrR ENCL Ib CODPNAME LTTA ENCl ACTION e iu PM MiAiER. 1 1 15 BC LiVkeg 20 lA 1 ~+M~ 1 1, 21 AD i i INTERNAL: G 1 1 02 NRC PDR 1 1 0 K 2 2 07 EDO L STAFF 1 1 oe MPA 1 09 DEPY DIR OPM i 10 QAB i, i 11 STANDRDS DEV i i i2 JORDAN<K/IE i 1 i 3F IFLD COOR/lE i i 16 AD FOR ENCA-. i i i7 'AD PLANT SYS 1 i 17 AD AEAC SF'fY i i 22 DIR DF'M i 23 OKLD i i AO/SITE tECH 1 1 DIREC TOR DSK 1 1 GEOSC IENCES BR

?aC SVS BR 1 1 NATL ENG BR i i MECH EAG UR 1 POHER SYS BR i i S HANAUE'R i STRUCT ENG BR i EXTFRNAL; 03 LPDR 1 1 04 NSIC 24 A'CRS 16 16 TOTAL NUMBER OF COPIES REQUlRED! LTTR 07 ENCL A7

h f l v 1 N I<

P, FI 1.

II PI g E

0 PQ(

Carolina Power & Light Company December 5, 1979 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 OMISSION OF REBAR IN THE REACTOR AUZILLARY BUILDING SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1

Dear Mr. O'Reilly:

In accordance with 10CFR50.55(e), the Region II office (Mr.-R. Bradley) was officially notified of the subject deficiency as being a "potentially reportable" item on October 29, 1979. On October 30, 1979, the Region II office (Mr. R. Bradley) was officially notified that the subject deficiency was considered reportable under the provisions of 10CFR50.55(e).

The intent of this letter is to inform you that due to the nature of the problem, all corrective action has not been completed on the subject deficiency and that it is anticipated that all action will be completed by March 1, 1980, at which time the final report will be submitted. The intent of this letter is to also document the November 26, 1979, telephone conversation between your Mr. C. E. Murphy and myself wherein it was agreed that this letter with its attachments (i.e. the November 1, 2, and 14, 1979, Carolina Power & Light Company's letters to the NRC which provide an update of the actions taken/planned to resolve the subject deficiency) would serve as the interim report..

Please note that although the attached letters also address a previously reported problem concerning missing No. 18 dowels in the containment wall, this problem was evaluated separately and was subsequently identified as non-reportable.

8OOj. OSO 336 Fayettevilte Street ~ P. O. Box 1551 ~ Raleigh, N. C. 27602 N OI<<<<<<(K>M OQPT'.

4 Mr. James P. O'Reilly December 5, 1979 If you have any questions regarding this matter, please do not hesitate to contact me.

Yours very truly, N. Chiang' Manager Enginee onstruction Quality Assurance KVH/bd (909726)