Category:Letter
MONTHYEARML24289A0312024-11-0808 November 2024 – Issuance of Amendments Related to the Removal of License Condition 2.F as Part of the Consolidated Line-Item Improvement Process (CLIIP) IR 05000382/20240032024-11-0808 November 2024 Integrated Inspection Report 05000382/2024003 05000382/LER-2024-001-01, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-11-0707 November 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure IR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 ML24229A1042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24228A2612024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 IR 05000382/20230042024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 IR 05000382/20230032024-01-23023 January 2024 Acknowledgment of Reply to a Notice of Violation NRC Inspection Report 05000382/2023003 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23312A1832023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation 2024-09-06
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24248A2362024-09-0404 September 2024 2023 Annual Assessment Meeting Slides ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR ML22271A7502022-09-29029 September 2022 Preapplication Meeting Slides: Technical Specification Change to Support Elimination of ESFAS Single Point Vulnerability ML22224A2462022-08-19019 August 2022 Entergy Slides for Regulatory Conference (Enc 3) ML22217A0082022-07-29029 July 2022 Regulatory Conference - NRC Slides (Enc 2) ML22076A1962022-03-17017 March 2022 Presentation March23, 2022 NRC Di_C Workshop ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21013A3372020-12-17017 December 2020 Risk-Informed Allowed Outage Time (Riaot) License Amendment Request -NRC Pre-Submittal Meeting, Licensee Slide Presentation, December 17, 2020 EPID L-2020-LRM-0110 ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20288A7292020-09-22022 September 2020 Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-03-12012 March 2020 Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0082, Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-12-0505 December 2019 Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0068, Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-09-12012 September 2019 Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18037B1102018-02-0808 February 2018 Presentation Slides for February 8 2018 Preapplication Meeting to Discuss Chapter 15 Fuel Misload ML17290A6552017-10-19019 October 2017 Public Meeting, Licensee Presentation Slides Regarding Waterford, Unit 3, Fluence Methodology ML16190A0842016-06-0808 June 2016 Public Meeting, June 8, 2016 (Pmc Comments1) ML15222A3472015-08-11011 August 2015 Presentation for 8-11-15 Public Meeting on Main Control Room Abandonment ML15196A4152015-07-15015 July 2015 Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment ML15113A7872015-04-22022 April 2015 CEA Drop Time Technical Specification Change Request April 22, 2015 Revised Public Meeting Slides ML15110A0622015-04-22022 April 2015 CEA Drop Time T.S. Change Request April 22,2015 Public Meeting Slides ML14035A0942014-02-0404 February 2014 2/4/2014 Waterford Steam Electric Station, Unit 3 - Meeting Slides - NFPA 805 LAR Supplement ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12261A1962012-09-16016 September 2012 Summary of Meeting with Waterford Steam Electric Station to Discuss the Performance of the Waterford Steam Electric Station, Unit 3, for the Period of July 1, 2011 Through June 30, 2012 ML1129205202011-10-19019 October 2011 Regulatory Conference Summary ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1031403752010-11-10010 November 2010 Handouts for the 11/10/10 Meeting Regarding Surge Line Leak-Before Break RCS Leakage Detection ML1014606312010-05-26026 May 2010 Summary of Public Meeting with Entergy Operations on Waterford Steam Electric Station Unit 3 2009 Performance ML1006903722010-03-0808 March 2010 Licensee Slides from 3/8/2010 Meeting Generic Letter 2004-02 Response to RAIs ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0821401432008-07-31031 July 2008 Summary of Public Meeting with Entergy on Waterford, Unit 3, 2007 Performance ML0805102512008-02-20020 February 2008 Summary of Meeting with Entergy Operations, Inc. Degraded Batwings Metal Support Structures for Tubes in Waterford 3's Steam Generators ML0729806702007-10-24024 October 2007 Meeting Presentation on GEH Chemical Effects Testing Update ML0729806642007-10-24024 October 2007 Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits ML0726701082007-10-10010 October 2007 9/06/2007 Waterford Steam Electric Station, Unit No. 3 - Meeting Handouts ML0712005272007-04-30030 April 2007 Nrc/Entergy Operations, Inc. Management Meeting to Discuss the Performance of Arkansas Nuclear One, Cooper, Grand Gulf, River Bend and Waterford, Unit 3 ML0708706752007-03-22022 March 2007 Meeting Slides, Entergy Meeting with NRC, Topic: Waterford 3 Batwings ML0615000942006-05-30030 May 2006 Summary of Meeting with Entergy Operations Re Waterford Steam Electric Station, Unit 3, Annual Performance Assessment ML0610103332006-04-0505 April 2006 Slides Presented at April 6, 2006 Waterford 3 Meeting ML0427901372004-10-0404 October 2004 Meeting Summary for the September 29, 2004, Public Meeting to Discuss General Engineering Related Topics ML0323705292003-08-22022 August 2003 Summary of Nrc/Entergy Operations, Inc. Management Meeting ML0323201802003-08-14014 August 2003 8/14/03, EOI Will Discuss Its May 8, June 11, & July 1, 2003, Relaxation Requests from Nrc'S Vessel Head Inspection Order ML0310102992003-04-0101 April 2003 Enclosures to 04/01/2003 Waterford End-of-Cycle Meeting Summary. Includes Attendance List & Copy of Slides Presented 2024-09-04
[Table view] Category:Meeting Summary
MONTHYEARML24052A2572024-02-26026 February 2024 Summary of January 17, 2024, Partially Closed Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Entergy Fleet Regarding Implementation of an Online Monitoring Methodology ML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22217A0072022-07-29029 July 2022 NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022 ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21112A2492021-05-0707 May 2021 Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non ML21075A0322021-04-0202 April 2021 Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes ML21071A2862021-04-0101 April 2021 Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 ML21032A0132021-02-19019 February 2021 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A2022021-01-15015 January 2021 Summary of December 15, 2020, Category 1 Public Pre-Application Meeting with Entergy Operations, Inc. Regarding Proposed LAR to Relocate Specific Technical Specifications for Waterford Steam Electric Station, Unit 3 ML20325A2412020-12-17017 December 2020 Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes ML20315A2672020-12-17017 December 2020 Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) ML20325A3212020-12-17017 December 2020 Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) ML20288A7422020-10-22022 October 2020 Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) ML20182A4472020-07-0808 July 2020 Summary of June 11, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Waterford Steam Electric Station, Unit 3 Regarding Adoption of 10 CFR 50.69 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML20106E8882020-04-20020 April 2020 Summary of Public Meeting with Entergy Operations, Inc. Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes ML20059K1562020-03-19019 March 2020 Discussion Topics for March 19, 2020 Fourth Partially Closed Public Meeting Regarding a Planned License Amendment Request to Install a Digital Modification to CPC and Ceac Systems Entergy Operations, Inc ML20013G2592020-02-0707 February 2020 Summary of December 11, 2019 Partially Closed Presubmittal Meeting with Entergy Operations, Inc., to Discuss the Effect of a Planned LAR for Digital Instrumentation and Control Modification on Accident Analyses at Waterford (L-2019-LRM-0079 ML19298B9182019-11-0505 November 2019 Summary of 9/19/19 Presubmittal Meeting with Entergy Operations, Inc. Re Request to Replace Core Protection Calculator and CEA Calculator Systems with Digital Systems in Accordance with DI&C-ISG-06, Revision 2 for Waterford Unit 3 ML19247C3882019-09-10010 September 2019 Summary of August 29, 2019, Category 1 Public Meeting with Entergy a Request for a Fee Waiver for the Review of a Planned Digital Instrumentation and Control License Amendment Request ML18323A4212018-11-26026 November 2018 Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML18120A3112018-05-10010 May 2018 Summary of April 17, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Relief Request for Visual Inspection of Charging Pipes for the Waterford Steam Electric Station, Unit 3 ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18059A0152018-03-0505 March 2018 Summary of February 8, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Unit 3 Updated Final Safety Analysis Report Section 15.4.3.1 ML18005A0992018-01-25025 January 2018 Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 ML17353A1542017-12-22022 December 2017 Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) ML17331A0882017-12-0606 December 2017 Summary of Public Meeting with Entergy Operations, Inc. Neutron Fluence Calculation Method for the Waterford Steam Electric Station, Unit 3 ML17174B1922017-06-29029 June 2017 Summary of June 8, 2017, Category 1 Teleconference with Entergy Regarding Planned Request for Alternative Regarding High Pressure Safety Injection Pump for Waterford Steam Electric Station, Unit 3 ML17174B2262017-06-28028 June 2017 Summary of June 1, 2017, Public Meeting with Entergy Regarding Planned License Amendment Request to Revise Technical Specification (TS) Table 3.7-3 and TS 3/4.7.4, Ultimate Heat Sink for Waterford Steam Electric Station ML17090A0472017-03-31031 March 2017 Summary of Telecon Held on March 28, 2017, Between the NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) - Updated with ADAMS Accession Nos ML17088A1852017-03-30030 March 2017 Summary of Telecon Held on March 28, 2017, Between NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) ML16364A2902017-01-24024 January 2017 12/8/16, Summary of Public Meeting with Entergy Operations, Inc., Regarding the License Amendment Request to Revise Technical Specification Table 4.3-2 to Relocate ESFAS Subgroup Relays to the SFCP for Waterford Steam Electric Station, Unit ML16323A2292017-01-24024 January 2017 08/23-25/2016 Summary of Teleconference Meetings with Entergy Operations Inc., Concerning RAI Set 1 Pertaining to the Waterford Steam Electric Station, Unit 3 License Renewal Application ML16356A5822016-12-30030 December 2016 12/07/2016 Summary of Teleconference with Entergy Operations, Inc. Concerning Requests for Additional Information Set 10 Pertaining to the Waterford Steam Electric Station Unit 3 License Renewal Application ML16341B0632016-12-21021 December 2016 November 30, 2016 Summary of Teleconference Held Between NRC and Entergy Operations, Inc. Concerning RAI Set 9 Pertaining to the Waterford Steam Electric Station, Unit 3, License Renewal Application ML16125A0832016-05-0404 May 2016 Summary of Annual Assessment Meeting with Entergy Operations Inc Regarding Waterford-3 2015 Performance ML15239A7392015-08-31031 August 2015 Summary of Public Meeting with Entergy Operations, Inc. to Discuss Main Control Room Abandonment Regarding NFPA-805 License Amendment Request ML15196A4152015-07-15015 July 2015 Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment ML15117A5032015-05-0606 May 2015 April 22, 2015, Summary of Pre- Application Public Meeting with Entergy Operations, Inc., Waterford, Unit 3, to Discuss the License Amendment Request to Modify Technical Specification 3.1.3.4 and the Final Safety Analysis Report 2024-02-26
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24248A2362024-09-0404 September 2024 2023 Annual Assessment Meeting Slides ML24096B4992024-04-0101 April 2024 Slides: Pre-Submittal Meeting for License Amendment Request to Modify Selected Surveillance Requirements in Support of the Surveillance Frequency Control Program ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23296A1002023-10-24024 October 2023 Entergy Presentation Slides for Pre-Submittal Meeting on 10/24/23, Mtc LAR ML23122A1012023-05-0202 May 2023 Assessment Presentation 2022 ML22271A7502022-09-29029 September 2022 Preapplication Meeting Slides: Technical Specification Change to Support Elimination of ESFAS Single Point Vulnerability ML22224A2462022-08-19019 August 2022 Entergy Slides for Regulatory Conference (Enc 3) ML22217A0082022-07-29029 July 2022 Regulatory Conference - NRC Slides (Enc 2) ML22164A8012022-06-13013 June 2022 Entergy Fleet (GGNS, RBS, and WF-3) - Code Case N-752 RR 6-14-22 Pre-Submittal Public Meeting Presentation Slides ML22076A1962022-03-17017 March 2022 Presentation March23, 2022 NRC Di_C Workshop ML21319A2452021-11-15015 November 2021 Natrium Energy Island Decoupling Strategy - 11-17-2021 ML21312A0342021-11-0909 November 2021 Combined Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21306A3162021-11-0909 November 2021 Digital IC Presentation 11/09/2021 ML21309A0622021-11-0909 November 2021 NRC Slides for November 9, 2021, Technology Inclusive Content of Application Project Public Meeting ML21200A1792021-07-31031 July 2021 Scale/Melcor Non-LWR Source Term Demonstration Project - High Temperature Gas-Cooled Reactor ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A1982021-01-15015 January 2021 Relocate Toxic Gas Monitoring Technical Specifications to Technical Requirements Manual License Amendment Request - NRC Pre-submittal Meeting ML21013A3372020-12-17017 December 2020 Risk-Informed Allowed Outage Time (Riaot) License Amendment Request -NRC Pre-Submittal Meeting, Licensee Slide Presentation, December 17, 2020 EPID L-2020-LRM-0110 ML20344A0572020-12-10010 December 2020 Combined Industry and NRC Slides for the December 10, 2020, Public Meeting on Technology Inclusive Content of Application Project, Advanced Reactor Content of Application Project and Applicability of Regulations to Non-Light Water Reactors ML20269A3452020-09-28028 September 2020 Pre-submittal Meeting for Request for One-Time Exemption from 10 CFR Part 50, Appendix E, Biennial EP Exercise (Offsite) Due to COVID-19- Entergy Presentation Slides ML20288A7292020-09-22022 September 2020 Presentation Cpc/Ceac Replacement License Amendment Request - September 22, 2020 W3F1-2020-0017, Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-03-12012 March 2020 Transmittal of Slides for Fourth Partially Closed Pre-submittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2020-0002, Transmittal of Slides for Third Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2020-01-0808 January 2020 Transmittal of Slides for Third Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0082, Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-12-0505 December 2019 Transmittal of Slides for Second Partially Closed Presubmittal Meeting with Entergy Operations, Inc. to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification W3F1-2019-0068, Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification2019-09-12012 September 2019 Transmittal of Slides for Presubmittal Public Meeting to Discuss a Planned License Amendment Request for Digital Instrumentation and Control Modification ML18107A3342018-04-10010 April 2018 Tech Spec 3.3.5.2a Change Pre-Submittal Meeting Presentation Slides ML18075A1232018-03-20020 March 2018 Entergy Nuclear Operations - March 20, 2018, Presentation Slides for Surveillance Frequency Control Program, UFSAR Change Considerations ML18037B1102018-02-0808 February 2018 Presentation Slides for February 8 2018 Preapplication Meeting to Discuss Chapter 15 Fuel Misload ML17318A1232017-11-16016 November 2017 Licensee Presentation Slides for November 16, 2017, Category 1 Public Meeting Regarding Engineered Safety Features Actuation System ML17306A1652017-11-0202 November 2017 Updated Licensee Slide Presentation for October 19, 2017 Category 1 Meeting Regarding Raptor ML17290A6552017-10-19019 October 2017 Public Meeting, Licensee Presentation Slides Regarding Waterford, Unit 3, Fluence Methodology ML17158B1502017-06-0808 June 2017 Meeting Slides for High Pressure Safety Injection Pump AB Pre-submittal Public Meeting Relief Request Per 50.55a(Z)(2)for Waterford Steam Electric Station, Unit 3 ML17151A2952017-06-0101 June 2017 6/1/2017, Meeting Slide for Pre-Submittal Meeting Regarding Ultimate Heat Sink Technical Specification Change Request for Waterford 3 ML17101A6482017-04-11011 April 2017 Public Meeting Slides ML16190A0842016-06-0808 June 2016 Public Meeting, June 8, 2016 (Pmc Comments1) ML15222A3472015-08-11011 August 2015 Presentation for 8-11-15 Public Meeting on Main Control Room Abandonment ML15196A4152015-07-15015 July 2015 Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment ML15113A7872015-04-22022 April 2015 CEA Drop Time Technical Specification Change Request April 22, 2015 Revised Public Meeting Slides ML15110A0622015-04-22022 April 2015 CEA Drop Time T.S. Change Request April 22,2015 Public Meeting Slides ML14035A0942014-02-0404 February 2014 2/4/2014 Waterford Steam Electric Station, Unit 3 - Meeting Slides - NFPA 805 LAR Supplement ML12275A5492012-10-0101 October 2012 Summary of Meeting with Entergy Operations, Inc., to Discuss the Performance of the Subject Facilities, Recent Organizational Changes, and Current Regulatory Issues ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12261A1962012-09-16016 September 2012 Summary of Meeting with Waterford Steam Electric Station to Discuss the Performance of the Waterford Steam Electric Station, Unit 3, for the Period of July 1, 2011 Through June 30, 2012 ML11321A2912011-11-17017 November 2011 Final Significance Determination of White Finding, NRC Inspection ML1110401532011-04-13013 April 2011 Licensee Slides from 4/13/11 Meeting with Entergy Operations, Inc., to Discuss Proposed National Fire Protection Programs Standards 805 License Amendment Submittal for Arkansas Nuclear One, Units 1 & 2 ML1031403752010-11-10010 November 2010 Handouts for the 11/10/10 Meeting Regarding Surge Line Leak-Before Break RCS Leakage Detection ML1014606312010-05-26026 May 2010 Summary of Public Meeting with Entergy Operations on Waterford Steam Electric Station Unit 3 2009 Performance ML1006903722010-03-0808 March 2010 Licensee Slides from 3/8/2010 Meeting Generic Letter 2004-02 Response to RAIs ML0935201272009-12-18018 December 2009 Nrc/Entergy Operations, Inc., Management Meeting ML0909603272009-04-0606 April 2009 Summary of Public Meeting with Entergy on Waterford Steam Electric Station Unit -3 2008 Performance 2024-09-04
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511 July 15, 2015 Mr. Michael R. Chisum, Site Vice President Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751
SUBJECT:
SUMMARY
OF ANNUAL PERFORMANCE ASSESSMENT MEETING WITH ENTERGY CORPORATION
Dear Mr. Chisum:
This summary refers to the public meeting conducted at Saint Charles Parish Emergency Operations Center, Hahnville, Louisiana, on July 7, 2015, between the NRC and your staff.
During the meeting, the NRC presented the results of the 2014 end-of-cycle assessment of safety performance at Waterford Steam Electric Station.
The meeting was classified as a Category 1 public meeting, as communicated in the meeting notice (ADAMS ML15168A239). An opportunity was provided for members of the public to discuss regulatory issues with the NRC after the business portion of the meeting, but before the meeting adjourned.
The attendance list for the meeting is enclosed with this summary as Enclosure 1. Copies of the presentations given by the NRC and by Entergy are also enclosed as Enclosures 2 and 3, respectively.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its enclosures, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely,
/RA/B. Hagar for Geoffrey B. Miller, Chief Project Branch D, Division of Reactor Projects Docket No. 50-382 License No. NPF-38
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Resident Inspector (Chris.Speer@nrc.gov)
WAT Administrative Assistant (Linda.Dufrene@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Mike.Orenak@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Congressional Affairs Officer/RI (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
State Liaison Officer (Bill.Maier@nrc.gov)
OEMail Resource ROPreports ADAMS ML ADAMS: No Yes SUNSI Review Complete Reviewer Initials:BP Publicly Available Non-Sensitive Non-publicly Available Sensitive PE:DRP/D PAO RSLO C:DRP/PBD BParks VLDricks WAMaier GMiller
/RA/ /RA/LUselding for /RA/ /RA/BHagar for 7/14/15 7/14/15 7/14/15 7/15/15 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Entergy Nuclear Excellence We Power Life
,_j/J NRC Public Meeting
Ran Gilmore Director, Regulatory and Performance Improvement NRC Public Meeting 1
Entergy ~
Nuclear Excellence ~
We Power Life
~
VERMONT YANKEE Vernon, VT JAMES A. FITZPATRICK Scriba, NY l
\
r::
INDIAN POINT EN GY CENTER 2 & 3 /:J PILGRIM 5 \
Plymouth, MA
~ \ \ Buchanan, NY -
COOPER-Brownville, NE f I ENTERGY NUCLEAR REGI I White Plains, NY ARKANSAS NUCLEAR ONE 1 & 2 ~---/
Russellville, AR - ~ ---;_; .t:. .
I ' ENTERGY NUCLEAR HEA J
RIVER BEND Jackson, MS\
St. Francisvilf~LA_ ~ b RAND GULF
..._ WATERFORD 3~-<. ~ort Gibson, MS Killona, LA --:~~~~
ENTERGY CORPORATION HEADQUARTERS New Orleans, LA NRC Public Meeting 2
Waterford 3 Steam Electric Station Generation
- Total site net generation: 1,178 MW
- Enough power to serve a city the size of New Orleans Site Features
- Site size: Approximately 3,600 acres in Killona, LA
- Commercial service: 1985 Community Impact
Approximately 600
- 2014 taxes paid: Approximately
$25 million property License Renewal
- Currently licensed until 2024
- Renewing license until 2044 NRC Public Meeting 3
Employee Contributions /Community Outreach
- Participated in the St. Charles Parish United Way Battle for the Paddle and St. Charles Parish Relay for Life.
- Raised over $159,000 for St. Charles Parish United Way and nonprofit organizations including Wounded Warriors, Alpha Daughters of Zion and American Cancer Society.
- Gave over $10,000 in grants to local charities and schools.
- Participated S.T.E.M. related programs for surrounding community schools including Hahnville High, Destrehan High and Xavier University.
- Supported Wetland Watcher Celebration
- Participated as Senior Project Panelist at Destrehan High School and Hahnville High School NRC Public Meeting 4
Community Outreach Hahnville High School Engineering and Robotics Club NRC Public Meeting 5
Community Outreach New Hope Baptist Church Outreach NRC Public Meeting 6
Community Outreach Wetland Watchers NRC Public Meeting 7
Community Outreach United Way / Battle for the Paddle Total Contribution to United Way: $159,312 NRC Public Meeting 8
Community Outreach Relay for Life - American Cancer Society NRC Public Meeting 9
Community Outreach Hahnville High School March of Dimes NRC Public Meeting 10
Community Outreach Satellite Center Plant Tour NRC Public Meeting 11
Community Outreach Satellite Center Plant Tour NRC Public Meeting 12
NRC Public Meeting 13 Entergy Nuclear Excellence We Power Life NRC Public Meeting Waterford 3 14
Michael Chisum Site Vice President Waterford 3 NRC Public Meeting 15
Waterford Steam Electric Station Annual Assessment Meeting Reactor Oversight Process - 2014 July 7, 2015 1
Agenda
- Waterfords Performance Results
- Review of Reactor Oversight Process 2
Nuclear Regulatory Commission
- All nominated by the President
- No more than 3 can be from same political party 3
Our Mission
- To license and regulate the nations civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment.
4
The NRC Regulates Nuclear Reactors Nuclear Materials 5
The NRC Regulates Nuclear Waste Nuclear Security 6
The Resident Inspector Program
- Introduced in 1978, expanded in response to Three Mile Island Accident of 1979
- Resident Inspectors are permanently stationed at the site
- Normally two inspectors per site, three for larger sites 7
Responsibilities of Resident Inspectors Scrutinize day-to-day plant conditions and operations to verify compliance with Federal Regulations 8
Responsibilities of Resident Inspectors Support the ROP by conducting baseline inspections and auditing the accuracy of performance indicators 9
Responsibilities of Resident Inspectors Communicate safety-significant issues to plant management for correction and, if necessary, to higher levels of NRC management for enforcement 10
Responsibilities of Resident Inspectors Respond to the site during emergencies to establish oversight and provide critical communications with the Region and Headquarters 11
Baseline Inspection
- The NRC conducted approximately 2,200 of direct inspection hours at Waterford in 2014
- Plus preparation and documentation 12
Reactor Oversight Process (ROP)
Licensee performance is evaluated based on:
- Performance Indicators Inspection Findings and Performance Indicators are assigned colors that reflect their safety significance:
Green White Yellow Red Increasing Safety Significance 13
Action Matrix Columns Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 14
Waterfords Assessment Results January 1 - December 31, 2014
- Regulatory Response Column - Column 2
- Open since 4Q2013
- Inspected in 10/2014 and 3/2015
- Closed 1Q2015 15
Waterfords Assessment Results January 1 - December 31, 2014
- All Performance Indicators were Green
- 19 non-cited violations
- 2 findings (no violation) 16
Noteworthy Findings
- Diesel Fuel Day Tank Corroded Vent
- Identified during Component Design Bases Inspection in 4Q2014
- Through-wall opening could have allowed water into day tank 17
Safety Significant Findings
- Test results demonstrated that:
- Roof drains remove water at a higher-than-predicted rate
- Diesel would continue to operate with higher-than-expected water contamination in fuel supply
- Finding is Green 18
Waterfords Annual Assessment Summary January 1 - December 31, 2014
- Entergy operated Waterford 3 in a manner that preserved public health and safety
- All cornerstone objectives were met with minimal degradation in safety performance 19
Waterfords Annual Assessment Summary January 1 - December 31, 2014
- No substantive cross-cutting issues
- NRC plans baseline inspections at Waterford 3 for the remainder of 2015 20
Licensee Response and Remarks Waterford 3 21
NRC Closing Remarks NRC 22
Questions 23
UNITED STATES NUCLEAR REGULATORY COMMISSION R E G I ON IV 612 EAST LAMAR BLVD , SUITE 400 ARLINGTON, TEXAS 76011-4125 ANNUAL PUBLIC ASSESSMENT MEETING ATIENDANCE SHEET LICENSEE/FACILITY Entergy Operations/Waterford 3 Nuclear Plant DATE/TIME July 7, 2015@ 5:00 p.m. - 7:00 p.m.
LOCATION St. Charles Parish Emergency Operations Center 15026 River Road Hahnville, LA 70057 ORGANIZATION Els