HIGHPRESSURESAFETYINJECTIONPUMPAB PRESUBMITTAL PUBLICMEETING RELIEFREQUESTPER50.55a(z)(2)
WATERFORD3 JUNE8,2017 1
HPSIABReliefRequest PreSubmittalMeeting
Introductions
JohnJarrell-RegulatoryAssuranceManager BenSheppard-InServiceTestingEngineer MichelleGroome - SystemsEngineer MariaZamber-RegulatoryAssurance 2
HPSIABReliefRequest PreSubmittalMeeting
- Overview
- AdverseCondition,Testing,andCorrectiveAction Requirements
- PreviousReliefRequest
- ProblemwithRefurbishment
- PumpPerformanceData/Analysis
- ProposedAlternative 3
Agenda
Overview
- Entergyisrequestingreliefoftherequirementtoperformthe ISTComprehensiveTestoftheHPSIABpump.
- Testisrequiredtobeperformedata39weekfrequencydueto therequirement(ISTB6200(a))todoublethefrequencyifa parametervalue(inthiscase,vibration)fallswithintheAlert range.
- HighvibrationnotedduringRF20(Nov2015)andrelief previouslygrantedforCycle21.
- PumpcouldnotberefurbishedduringRF21,thereforereliefis againbeingrequestedforCycle22.
4
HighPressureSafetyInjectionPumpAB
- PumpSIMPMP0002ABistheinstalledspare(maybe alignedtoeithertrain).
- Safetyrelated,horizontallymounted,ninestage, centrifugalpump.
- ManufacturerisIngersollRand(Model4X9C9).
- Ratedfor405gpmwith2830feetofheadat3575 rpm.
- GroupBpump.
5
AdverseCondition-HighVibration
- ComprehensivePumpTestperformedduring RF20(Nov2015)identifiedhighvibrationinthe alertrangeatvibrationpoints3H(inboard bearing)and4H(outboardbearing).
- Causeofhighvibrationattributedtobeginning stagesofendoflife.
6
TestandCorrectiveActionRequirements
- ComprehensivePumpTestrequiredtobeperformed on18monthfrequencyduetolengthofWF3 OperatingCycles.
- Correctiveactionrequiresthatiftestparametervalue fallswithinalertrange,frequencyshallbedoubled untilthecauseofthedeviationisdeterminedandthe conditioniscorrected.
- Comprehensivetestcanonlybeperformedwhen reactorisshutdown(Mode6).
7
PreviousReliefRequest/Precedent
- ReliefpreviouslygrantedforWaterford3onJuly6, 2016forOperatingCycle21[ML16182A270].
- ApprovalgrantedtoperformGroupAtestona quarterlybasisinordertomonitorvibrationwhile onlineinordertoidentifyiftheconditionwas worsening.
- Pumprefurbishmentwasscheduledtobe performedduringthe21strefuelingoutage (RF21).
8
ProblemwithRefurbishment
- NewHPSIABshaftdamagedbyfabricatorand deemedunusable
- PumpisuniquetoWaterford3andArkansasNuclear Oneandsparematerialsnotavailable.
- Leadtimeforanewshaftwasbeyondthestartdate ofOperatingCycle22.
- Inpreparationforrefurbishment,pumpwas uncoupledfrommotor,thenrecoupledwhen refurbishmentcouldnotbecompleted.Noadditional maintenancewasperformed.
9
PumpPerformance
- Pumpexhibitssatisfactoryhydraulicperformancewithno degradingtrend.
- TSflowsurveillancerequirementsaresatisfactory.
- VibrationmeasurementsobservedduringCycle21Group Atestingwereelevatedyetacceptable.
- Aftertheuncouplingandrecouplingofthepumpjust priortoRF21,thevibrationswerenotedtohavebeen reducedsignificantly,andareofthesamemagnitudeas vibrationmeasurementsrecordedduringthe comprehensivetestofRF21.
10
ChangeinVibrationReadings Engineeringevaluationdeterminedthatthe uncouplingandrecouplingperformedatthebeginning oftherefurbishmentattemptaffectedthevibration readings;however,thisisnotthemostlikelycauseof theincreasedvibrationsidentifiedinNovember2015 andthereforeEntergycannotsaythattheoriginal conditionhasbeenresolved.Duetothecircumstances presentedbythefactthattheHPSIABpumpcouldnot berefurbished,theoriginalconditionthatcausedthe elevatedvibrationhasnotbeencorrected.
11
HPSIABComprehensiveData 12 Date Outage Flow Rate (gpm)
DP (psid)
Pump Bearing Vibrations (in/sec) 3H 3V 4H 4V 4A 10/28/2009 RF16 404.0 1202.0 0.267 0.191 0.252 0.266 0.050 04/16/2011 RF17 422.8 1184.2 0.235 0.161 0.241 0.250 0.058 12/18/2012 RF18 411.0 1215.0 0.249 0.166 0.226 0.234 0.049 04/19/2014 RF19 411.2 1190.7 0.090 0.083 0.070 0.072 0.058 11/03/2015 RF20 406.0 1194.5 0.332 0.191 0.336 0.230 0.088 11/23/2015 RF20 408.5 1202.2 0.397 0.225 0.399 0.179 0.078 4/21/2017 RF21 411.6 1194.7 0.213 0.124 0.219 0.141 0.042 Note:Alertrangeis0.325<V0.700in/sec
HPSIABTSDPSurveillanceData 13 Cycle 20 Cycle 21 Date DP (psid)
Date DP (psid) 06/10/2014 1491.0 03/09/2016 1492.3 09/09/2014 1462.0 06/07/2016 1466.2 12/12/2014 1491.5 09/09/2016 1467.4 03/05/2015 1466.5 12/01/2016 1470.1 06/02/2015 1471.6 03/10/2017 1474.1 09/04/2015 1497.0 04/07/2017 1468.5 Note:TSrequiresaDPgreaterthanorequalto1429psid.
HPSIABTSFlowSurveillanceData 14 Note:TSrequiresthatthesumofinjectionlineflowratesshallbe> 675gpm.Eachpump mustperformwithahotlegflowrategreaterthanorequalto436gpmandwithin+/-10%ofcoldlegflow.
Date Outage TS 4.5.2(h)
Cold Leg Flow (gpm)
Cold Leg Flow (gpm)
Hot/Cold Leg Flow (gpm) 90%
Cold Leg Flow Hot Leg Flow 110%
Cold Leg Flow 10/28/2009 RF16 687 441.0 396.90 463.7 485.10 04/16/2011 RF17 695 466.0 419.40 455.0 512.60 12/18/2012 RF18 706 451.0 405.00 458.0 496.00 04/19/2014 RF19 (Header B) 708 422.0 379.80 455.2 464.20 05/06/2014 RF19 (Header A) 689 459.0 413.00 441.0 505.00 11/03/2015 RF20 (Header A) 680 454.0 408.60 445.0 499.40 11/23/2015 RF20 (Header B) 694 442.0 397.80 462.0 486.20 4/21/2017 RF21 (Header B) 678 417.8 376.00 457.5 459.60 4/21/2017 RF21 (Header A) 679.8 443.5 399.2 457.9 487.8
HPSIABGroupATestData(Cycle21) 15 Date DP (psid)
Pump Bearing Vibrations 3H 3V 4H 4V 4A 03/09/2016 1376.2 0.278 0.220 0.310 0.292 0.062 06/07/2016 1347.5 0.282 0.210 0.231 0.286 0.072 09/09/2016 1335.2 0.270 0.200 0.290 0.290 0.070 12/01/2016 1340.5 0.260 0.200 0.240 0.300 0.060 03/10/2017 1336.6 0.280 0.250 0.230 0.310 0.050 04/07/2017 1345.0 0.143 0.142 0.151 0.223 0.050 Note:At250gpm,eachHPSIPumpmustachieveaminimumof1312.1psid,whichincludesinstrument accuracy,inordertofulfilltherequirementsofDesignBasisCalculationECM05003.
Analysis
- Pumpdischargeflowhasconsistentlyachieved TSflowrequirements.
- PumphasachievedTSDPrequirementsduring eachquarterlysurveillanceduringOperating Cycle20andOperatingCycle21.
- PumphasbeenwithinISTComprehensivetest DPacceptancecriteriawithnodegradingtrend inpumphydraulicperformance.
16
Conclusion 17 Theprecedinginformationdemonstrates thateventhoughtheHPSIABpumpisinthe beginningstagesofendoflife,itisremains capableofperformingitssafetyfunctionfor itsmissiontime.
ProposedAlternative 18
- Reliefwillberequestedtoallowperformanceof theGroupAtestonaquarterlybasisinlieuof theComprehensiveTestforthedurationofCycle 22,essentiallyidenticaltothereliefgrantedfor Cycle21.
- Datawillbeanalyzedtoensurethatthe performanceisintheexpectedrange,providing assurancethatthepumpwillcontinuetobe operationallyreadyforthedurationofthecycle.
Closing
- ExpectedsubmittaldateisJuly6,2017.
- ApprovalrequestedbyFebruary3,2018to ensurethatreliefisobtainedpriortothetime thattestingwouldneedtobeperformed,which is39weeksfollowingtheprevioustestdueto theincreasedtestingfrequencyrequirement.
- Thankyouforyourtimeandconsideration.
- Questions?
19