Text

HIGHPRESSURESAFETYINJECTIONPUMPAB PRESUBMITTAL PUBLICMEETING RELIEFREQUESTPER50.55a(z)(2)

WATERFORD3 JUNE8,2017 1

HPSIABReliefRequest PreSubmittalMeeting

Introductions

JohnJarrell-RegulatoryAssuranceManager BenSheppard-InServiceTestingEngineer MichelleGroome - SystemsEngineer MariaZamber-RegulatoryAssurance 2

HPSIABReliefRequest PreSubmittalMeeting

  • Overview
  • AdverseCondition,Testing,andCorrectiveAction Requirements
  • PreviousReliefRequest
  • ProblemwithRefurbishment
  • PumpPerformanceData/Analysis
  • ProposedAlternative 3

Agenda

Overview

  • Entergyisrequestingreliefoftherequirementtoperformthe ISTComprehensiveTestoftheHPSIABpump.
  • Testisrequiredtobeperformedata39weekfrequencydueto therequirement(ISTB6200(a))todoublethefrequencyifa parametervalue(inthiscase,vibration)fallswithintheAlert range.
  • HighvibrationnotedduringRF20(Nov2015)andrelief previouslygrantedforCycle21.
  • PumpcouldnotberefurbishedduringRF21,thereforereliefis againbeingrequestedforCycle22.

4

HighPressureSafetyInjectionPumpAB

  • PumpSIMPMP0002ABistheinstalledspare(maybe alignedtoeithertrain).
  • Safetyrelated,horizontallymounted,ninestage, centrifugalpump.
  • ManufacturerisIngersollRand(Model4X9C9).
  • Ratedfor405gpmwith2830feetofheadat3575 rpm.
  • GroupBpump.

5

AdverseCondition-HighVibration

  • ComprehensivePumpTestperformedduring RF20(Nov2015)identifiedhighvibrationinthe alertrangeatvibrationpoints3H(inboard bearing)and4H(outboardbearing).
  • Causeofhighvibrationattributedtobeginning stagesofendoflife.

6

TestandCorrectiveActionRequirements

  • ComprehensivePumpTestrequiredtobeperformed on18monthfrequencyduetolengthofWF3 OperatingCycles.
  • Correctiveactionrequiresthatiftestparametervalue fallswithinalertrange,frequencyshallbedoubled untilthecauseofthedeviationisdeterminedandthe conditioniscorrected.
  • Comprehensivetestcanonlybeperformedwhen reactorisshutdown(Mode6).

7

PreviousReliefRequest/Precedent

  • ReliefpreviouslygrantedforWaterford3onJuly6, 2016forOperatingCycle21[ML16182A270].
  • ApprovalgrantedtoperformGroupAtestona quarterlybasisinordertomonitorvibrationwhile onlineinordertoidentifyiftheconditionwas worsening.
  • Pumprefurbishmentwasscheduledtobe performedduringthe21strefuelingoutage (RF21).

8

ProblemwithRefurbishment

  • NewHPSIABshaftdamagedbyfabricatorand deemedunusable
  • PumpisuniquetoWaterford3andArkansasNuclear Oneandsparematerialsnotavailable.
  • Leadtimeforanewshaftwasbeyondthestartdate ofOperatingCycle22.
  • Inpreparationforrefurbishment,pumpwas uncoupledfrommotor,thenrecoupledwhen refurbishmentcouldnotbecompleted.Noadditional maintenancewasperformed.

9

PumpPerformance

  • Pumpexhibitssatisfactoryhydraulicperformancewithno degradingtrend.
  • TSflowsurveillancerequirementsaresatisfactory.
  • VibrationmeasurementsobservedduringCycle21Group Atestingwereelevatedyetacceptable.
  • Aftertheuncouplingandrecouplingofthepumpjust priortoRF21,thevibrationswerenotedtohavebeen reducedsignificantly,andareofthesamemagnitudeas vibrationmeasurementsrecordedduringthe comprehensivetestofRF21.

10

ChangeinVibrationReadings Engineeringevaluationdeterminedthatthe uncouplingandrecouplingperformedatthebeginning oftherefurbishmentattemptaffectedthevibration readings;however,thisisnotthemostlikelycauseof theincreasedvibrationsidentifiedinNovember2015 andthereforeEntergycannotsaythattheoriginal conditionhasbeenresolved.Duetothecircumstances presentedbythefactthattheHPSIABpumpcouldnot berefurbished,theoriginalconditionthatcausedthe elevatedvibrationhasnotbeencorrected.

11

HPSIABComprehensiveData 12 Date Outage Flow Rate (gpm)

DP (psid)

Pump Bearing Vibrations (in/sec) 3H 3V 4H 4V 4A 10/28/2009 RF16 404.0 1202.0 0.267 0.191 0.252 0.266 0.050 04/16/2011 RF17 422.8 1184.2 0.235 0.161 0.241 0.250 0.058 12/18/2012 RF18 411.0 1215.0 0.249 0.166 0.226 0.234 0.049 04/19/2014 RF19 411.2 1190.7 0.090 0.083 0.070 0.072 0.058 11/03/2015 RF20 406.0 1194.5 0.332 0.191 0.336 0.230 0.088 11/23/2015 RF20 408.5 1202.2 0.397 0.225 0.399 0.179 0.078 4/21/2017 RF21 411.6 1194.7 0.213 0.124 0.219 0.141 0.042 Note:Alertrangeis0.325<V0.700in/sec

HPSIABTSDPSurveillanceData 13 Cycle 20 Cycle 21 Date DP (psid)

Date DP (psid) 06/10/2014 1491.0 03/09/2016 1492.3 09/09/2014 1462.0 06/07/2016 1466.2 12/12/2014 1491.5 09/09/2016 1467.4 03/05/2015 1466.5 12/01/2016 1470.1 06/02/2015 1471.6 03/10/2017 1474.1 09/04/2015 1497.0 04/07/2017 1468.5 Note:TSrequiresaDPgreaterthanorequalto1429psid.

HPSIABTSFlowSurveillanceData 14 Note:TSrequiresthatthesumofinjectionlineflowratesshallbe> 675gpm.Eachpump mustperformwithahotlegflowrategreaterthanorequalto436gpmandwithin+/-10%ofcoldlegflow.

Date Outage TS 4.5.2(h)

Cold Leg Flow (gpm)

Cold Leg Flow (gpm)

Hot/Cold Leg Flow (gpm) 90%

Cold Leg Flow Hot Leg Flow 110%

Cold Leg Flow 10/28/2009 RF16 687 441.0 396.90 463.7 485.10 04/16/2011 RF17 695 466.0 419.40 455.0 512.60 12/18/2012 RF18 706 451.0 405.00 458.0 496.00 04/19/2014 RF19 (Header B) 708 422.0 379.80 455.2 464.20 05/06/2014 RF19 (Header A) 689 459.0 413.00 441.0 505.00 11/03/2015 RF20 (Header A) 680 454.0 408.60 445.0 499.40 11/23/2015 RF20 (Header B) 694 442.0 397.80 462.0 486.20 4/21/2017 RF21 (Header B) 678 417.8 376.00 457.5 459.60 4/21/2017 RF21 (Header A) 679.8 443.5 399.2 457.9 487.8

HPSIABGroupATestData(Cycle21) 15 Date DP (psid)

Pump Bearing Vibrations 3H 3V 4H 4V 4A 03/09/2016 1376.2 0.278 0.220 0.310 0.292 0.062 06/07/2016 1347.5 0.282 0.210 0.231 0.286 0.072 09/09/2016 1335.2 0.270 0.200 0.290 0.290 0.070 12/01/2016 1340.5 0.260 0.200 0.240 0.300 0.060 03/10/2017 1336.6 0.280 0.250 0.230 0.310 0.050 04/07/2017 1345.0 0.143 0.142 0.151 0.223 0.050 Note:At250gpm,eachHPSIPumpmustachieveaminimumof1312.1psid,whichincludesinstrument accuracy,inordertofulfilltherequirementsofDesignBasisCalculationECM05003.

Analysis

  • Pumpdischargeflowhasconsistentlyachieved TSflowrequirements.
  • PumphasachievedTSDPrequirementsduring eachquarterlysurveillanceduringOperating Cycle20andOperatingCycle21.
  • PumphasbeenwithinISTComprehensivetest DPacceptancecriteriawithnodegradingtrend inpumphydraulicperformance.

16

Conclusion 17 Theprecedinginformationdemonstrates thateventhoughtheHPSIABpumpisinthe beginningstagesofendoflife,itisremains capableofperformingitssafetyfunctionfor itsmissiontime.

ProposedAlternative 18

  • Reliefwillberequestedtoallowperformanceof theGroupAtestonaquarterlybasisinlieuof theComprehensiveTestforthedurationofCycle 22,essentiallyidenticaltothereliefgrantedfor Cycle21.
  • Datawillbeanalyzedtoensurethatthe performanceisintheexpectedrange,providing assurancethatthepumpwillcontinuetobe operationallyreadyforthedurationofthecycle.

Closing

  • ExpectedsubmittaldateisJuly6,2017.
  • ApprovalrequestedbyFebruary3,2018to ensurethatreliefisobtainedpriortothetime thattestingwouldneedtobeperformed,which is39weeksfollowingtheprevioustestdueto theincreasedtestingfrequencyrequirement.
  • Thankyouforyourtimeandconsideration.
  • Questions?