MONTHYEARML23047A3822023-03-21021 March 2023 Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting ML22217A0072022-07-29029 July 2022 NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022 ML22167A0882022-06-24024 June 2022 Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML21323A0472021-12-0606 December 2021 Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors ML21181A3352021-07-0101 July 2021 June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21158A2232021-06-0808 June 2021 Meeting Summary for Ticap Workshop 3 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21132A2952021-05-14014 May 2021 Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project ML21112A2492021-05-0707 May 2021 Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro ML21085A8652021-04-0808 April 2021 Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non ML21075A0322021-04-0202 April 2021 Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes ML21071A2862021-04-0101 April 2021 Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY ML21039A2682021-02-22022 February 2021 Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 ML21032A0132021-02-19019 February 2021 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station ML21013A3362021-01-26026 January 2021 December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 ML21012A2022021-01-15015 January 2021 Summary of December 15, 2020, Category 1 Public Pre-Application Meeting with Entergy Operations, Inc. Regarding Proposed LAR to Relocate Specific Technical Specifications for Waterford Steam Electric Station, Unit 3 ML20325A2412020-12-17017 December 2020 Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes ML20325A3212020-12-17017 December 2020 Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) ML20315A2672020-12-17017 December 2020 Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) ML20288A7422020-10-22022 October 2020 Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) ML20182A4472020-07-0808 July 2020 Summary of June 11, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Waterford Steam Electric Station, Unit 3 Regarding Adoption of 10 CFR 50.69 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20113E8362020-04-23023 April 2020 Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station ML20106E8882020-04-20020 April 2020 Summary of Public Meeting with Entergy Operations, Inc. Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes ML20059K1562020-03-19019 March 2020 Discussion Topics for March 19, 2020 Fourth Partially Closed Public Meeting Regarding a Planned License Amendment Request to Install a Digital Modification to CPC and Ceac Systems Entergy Operations, Inc ML20013G2592020-02-0707 February 2020 Summary of December 11, 2019 Partially Closed Presubmittal Meeting with Entergy Operations, Inc., to Discuss the Effect of a Planned LAR for Digital Instrumentation and Control Modification on Accident Analyses at Waterford (L-2019-LRM-0079 ML19298B9182019-11-0505 November 2019 Summary of 9/19/19 Presubmittal Meeting with Entergy Operations, Inc. Re Request to Replace Core Protection Calculator and CEA Calculator Systems with Digital Systems in Accordance with DI&C-ISG-06, Revision 2 for Waterford Unit 3 ML19247C3882019-09-10010 September 2019 Summary of August 29, 2019, Category 1 Public Meeting with Entergy a Request for a Fee Waiver for the Review of a Planned Digital Instrumentation and Control License Amendment Request ML18323A4212018-11-26026 November 2018 Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components ML18120A3112018-05-10010 May 2018 Summary of April 17, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Relief Request for Visual Inspection of Charging Pipes for the Waterford Steam Electric Station, Unit 3 ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18059A0152018-03-0505 March 2018 Summary of February 8, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Unit 3 Updated Final Safety Analysis Report Section 15.4.3.1 ML18005A0992018-01-25025 January 2018 Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 ML17353A1542017-12-22022 December 2017 Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) ML17331A0882017-12-0606 December 2017 Summary of Public Meeting with Entergy Operations, Inc. Neutron Fluence Calculation Method for the Waterford Steam Electric Station, Unit 3 ML17174B1922017-06-29029 June 2017 Summary of June 8, 2017, Category 1 Teleconference with Entergy Regarding Planned Request for Alternative Regarding High Pressure Safety Injection Pump for Waterford Steam Electric Station, Unit 3 ML17174B2262017-06-28028 June 2017 Summary of June 1, 2017, Public Meeting with Entergy Regarding Planned License Amendment Request to Revise Technical Specification (TS) Table 3.7-3 and TS 3/4.7.4, Ultimate Heat Sink for Waterford Steam Electric Station ML17090A0472017-03-31031 March 2017 Summary of Telecon Held on March 28, 2017, Between the NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) - Updated with ADAMS Accession Nos ML17088A1852017-03-30030 March 2017 Summary of Telecon Held on March 28, 2017, Between NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) ML16364A2902017-01-24024 January 2017 12/8/16, Summary of Public Meeting with Entergy Operations, Inc., Regarding the License Amendment Request to Revise Technical Specification Table 4.3-2 to Relocate ESFAS Subgroup Relays to the SFCP for Waterford Steam Electric Station, Unit ML16323A2292017-01-24024 January 2017 08/23-25/2016 Summary of Teleconference Meetings with Entergy Operations Inc., Concerning RAI Set 1 Pertaining to the Waterford Steam Electric Station, Unit 3 License Renewal Application ML16356A5822016-12-30030 December 2016 12/07/2016 Summary of Teleconference with Entergy Operations, Inc. Concerning Requests for Additional Information Set 10 Pertaining to the Waterford Steam Electric Station Unit 3 License Renewal Application ML16341B0632016-12-21021 December 2016 November 30, 2016 Summary of Teleconference Held Between NRC and Entergy Operations, Inc. Concerning RAI Set 9 Pertaining to the Waterford Steam Electric Station, Unit 3, License Renewal Application ML16125A0832016-05-0404 May 2016 Summary of Annual Assessment Meeting with Entergy Operations Inc Regarding Waterford-3 2015 Performance ML15239A7392015-08-31031 August 2015 Summary of Public Meeting with Entergy Operations, Inc. to Discuss Main Control Room Abandonment Regarding NFPA-805 License Amendment Request ML15196A4152015-07-15015 July 2015 Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment ML15117A5032015-05-0606 May 2015 April 22, 2015, Summary of Pre- Application Public Meeting with Entergy Operations, Inc., Waterford, Unit 3, to Discuss the License Amendment Request to Modify Technical Specification 3.1.3.4 and the Final Safety Analysis Report ML15099A5632015-04-0909 April 2015 Public Meeting Summary - Regulatory Conference with Entergy Operations, Inc., for Waterford Steam Electric Station, Unit 3 2023-03-21
[Table view] |
Text
July 8, 2020 LICENSEE: Entergy Operations, Inc.
FACILITY: Waterford Steam Electric Station, Unit 3
SUBJECT:
SUMMARY
OF JUNE 11, 2020, TELECONFERENCE MEETING WITH ENTERGY OPERATIONS, INC. TO DISCUSS PROPOSED LICENSE AMENDMENT REQUEST FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 REGARDING ADOPTION OF 10 CFR 50.69 (EPID L-2020-LRM-0043)
On June 11, 2020, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives from Entergy Operations, Inc. (the licensee) via teleconference. The purpose of the meeting was to discuss a proposed license amendment request (LAR) to adopt Title 10 of the Code of Federal Regulations (10 CFR) Section 50.69 (10 CFR 50.69), Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors, for the Waterford Steam Electric Station, Unit 3 (Waterford 3). The meeting notice and agenda, dated May 28, 2020, are available in NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML20149K642. A list of attendees and the meeting presentation material are enclosed.
The licensee presented information regarding its planned LAR to modify the Waterford 3 license to adopt 10 CFR 50.69. Enclosure 2 of this meeting summary contains the presentation slides that the licensee provided to the NRC staff. The licensee plans to submit the LAR in late July 2020 and to request a 12-month review and approval from NRC to support a refueling outage. The licensee gave an overview of its planned submittal, discussed its probabilistic risk assessment (PRA) technical adequacy, and discussed planned exceptions to the Nuclear Energy Institute (NEI) guidance document NEI 00-04, 10 CFR 50.69 SSC [Structure, System, and Component] Categorization Guideline, Revision 0, dated July 2005 (ADAMS Accession No. ML052900163).
The licensee stated that the technical adequacy of its PRA models was previously evaluated by the NRC during the reviews of previous risk-informed LARs related to fire protection and a technical specifications surveillance frequency control program. The licensee provided updates on its PRA that occurred after issuance of these amendments and stated that additional peer reviews and facts and observations closure reviews were conducted. To support an efficient licensing review, the NRC staff encouraged the licensee to provide the complete information on PRA technical adequacy in its planned LAR. The NRC staff also asked if the licensee will provide any PRA sensitivity studies for the categorization process. The NRC staff encouraged the licensee to include a clear overview of the process used for reviewing PRA uncertainties in its planned LAR.
The NRC staff asked the licensee if it was planning to credit FLEX equipment in its PRA and, if so, encouraged the licensee to include the information on FLEX credit in the submittal. The licensee stated that it was planning to credit FLEX in its internal events model but not in the fire
PRA. The NRC staff informed the licensee that the guidance for incipient detection credit provided in National Fire Protection Association Standard 805 Frequently Asked Question No. 08-0046 has been superseded and asked if the licensees fire PRA model implements the current guidance. In response, the licensee clarified that no incipient detection is credited in its fire PRA model.
The licensee stated that its planned LAR and 10 CFR 50.69 program will follow the guidance in NEI 00-04 except for passive component categorization and seismic considerations. The licensee discussed how passive components and passive functions of active components would be evaluated and mentioned the NRCs prior approval of that planned method for another site.
The licensee also stated that its seismic justification as a Tier 1 plant will reference the Electric Power Research Institute Topical Report No. 3002012988, Alternative Approaches for Addressing Seismic Risk in 10 CFR 50.69 Risk-Informed Categorization, dated July 2018 (this report is not publicly available but can be ordered from www.epri.com). The licensee stated that conclusions and results from existing seismic studies, as they apply to the system being categorized, will be provided to the integrated decision-making panel. The NRC staff discussed requirements for alternative seismic Tier 1 plants that the seismic risk and seismic risk relative to total plant risk must be low. The licensee stated that it is aware of the requirements and plans to follow the process being used by the lead Tier 1 plant (i.e., Calvert Cliffs).
The NRC staff did not make any regulatory decisions or commitments at the meeting. Two members of the public identified themselves on the teleconference but did not have any questions or comments.
Any inquiries can be directed to me at 301-415-0489 or via e-mail at Audrey.Klett@nrc.gov.
Digitally signed by Audrey L. Audrey L. Klett Date: 2020.07.08 Klett 13:10:51 -04'00' Audrey L. Klett, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosures:
- 1. List of Attendees
- 2. Meeting Presentation Material cc: Listserv
Enclosure 1 List of Attendees
LIST OF ATTENDEES JUNE 11, 2020, TELECONFERENCE MEETING WITH ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 PROPOSED LICENSE AMENDMENT REQUEST TO ADOPT 10 CFR 50.69 U.S. Nuclear Regulatory Commission Mihaela Biro Jorge Cintron-Rivera Jennifer Dixon-Herrity Fred Forsaty Bart Fu Bernard Grenier Kaihwa Hsu Audrey Klett Ed Miller Tony Nakanishi Sunwoo Park Robert Pascarelli Steve Short (NRC contractor with PNNL)
Thomas Wengert Yuken Wong De (Wesley) Wu Entergy Operations, Inc.
Maria Zamber, Waterford 3 (WF3) Regulatory Assurance Alan Harris, Jensen Hughes Andy Spotts, Jensen Hughes Bob Clark, ANO Regulatory Assurance Cecil (Howard) Mahan, Entergy Corporate Regulatory Assurance Jessica Walker, Jensen Hughes Mark Thigpen, WF3 PRA Engineering Ronald Gaston, Licensing Director, Entergy Corporate Regulatory Assurance William Steelman, WF3 Design Engineering Manager Members of the Public Bob Burg, Engineering Planning and Management (EPM), Inc.
Andrew Burgess, Ameren Missouri Justin Hiller, Ameren Missouri Enclosure 1
Enclosure 2 Meeting Presentation Material
Waterford 3 10 CFR 50.69 License Amendment Request NRC Pre-submittal Meeting
Participants Entergy
- Ron Gaston, Director Fleet Regulatory Assurance
- Paul Wood, Waterford 3 Manager, Regulatory Assurance
- Billy Steelman, Waterford 3 Manager, Design Engineering
- Maria Zamber, Waterford 3 Regulatory Assurance
- Richard French, Waterford 3 Project Manager
- Mark Thigpen, Waterford 3 PRA Engineer
- Alan Harris, Jensen Hughes, Licensing Consultant
- Andy Spotts, Jensen Hughes, PRA Consultant 2
Agenda Introduction/Opening Remarks Waterford 10 CFR 50.69 Overview PRA Technical Adequacy Deviations from NEI 00-04 Passive Categorization Seismic Treatment Schedule Closing Remarks 3
Waterford 10 CFR 50.69 Overview LAR and Program follow NEI 00-04 (exceptions noted on later slides) 12 month approval requested 4
PRA Technical Adequacy Internal Events (Including Flooding and Fire)
Probabilistic Risk Assessment (PRA) model technical adequacy previously evaluated by the NRC for TSTF-425 and NFPA 805.
Facts & Observations (F&O) closure peer review performed in October 2017 in accordance with the NEI 05-04 Appendix X approach.
Additional updates/upgrades have been peer reviewed. A Flood and LERF Peer Review was conducted in August 2019.
Changes to the as-built, as-operated plant are reviewed periodically to determine if model impacts require an off-cycle update.
Sensitivity studies will be performed in accordance with NEI 00-04 for areas such as Human Reliability Analysis (HRA) and Common Cause Failures (CCF).
Additional sensitivity studies will be performed to address applicable uncertainties associated with specific system(s) being categorized.
5
Passive Categorization Passive components and the passive function of active components will be evaluated using the Arkansas Nuclear One (ANO) Risk-Informed Repair/Replacement Activities (RI-RRA) method.
The use of this method was previously approved by the NRC in the Vogtle 10 CFR 50.69 application.
ASME Code Class 1 SSCs with a pressure retaining function, as well as supports, will be assigned as high safety significant (HSS) for passive categorization. This will result in HSS for its risk-informed safety classification and cannot be changed by the integrated decision-making panel (IDP).
6
Deviations from NEI 00-04 Seismic Justification Referencing EPRI TR 3002012988 Waterford 3 will reference EPRI Technical Report (3002012988) for seismic considerations in the categorization process.
Waterford 3 will document justification for being a Tier 1 Plant and provide justification to the IDP.
Conclusions and results from existing seismic studies, as they apply to the system being categorized, will be included in information provided to the IDP.
Waterford 3 will review and incorporate lessons learned and additional considerations from the lead Tier 1 plant, Calvert Cliffs.
7
Schedule
- LAR Submittal expected by end of July 2020
- Requesting 12 month NRC review and approval to support refueling outage.
8
Closing Remarks
ML20182A439 (Package);
ML20182A447 (Meeting summary);
ML20182A704 (Presentation) *by e-mail OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA* NRR/DRA/APLA/BC*
NAME AKlett PBlechman RPascarelli DATE 07/02/2020 07/01/2020 07/02/2020 OFFICE NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM NAME JDixon-Herrity (SLee for) AKlett DATE 07/02/2020 07/08/2020