Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML24052A257 | 26 February 2024 | Summary of January 17, 2024, Partially Closed Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Entergy Fleet Regarding Implementation of an Online Monitoring Methodology | |
ML23047A382 | 21 March 2023 | Summary of December 15, 2022 Periodic Advanced Reactor Stakeholder Public Meeting | |
ML22217A007 | 29 July 2022 | NRC Regulatory Conference Summary - Licensee Entergy Operations Inc Date of Conference - July 29 2022 | Coronavirus Fuel cladding Preliminary White Finding Regulatory Conference |
ML22167A088 | 24 June 2022 | Summary of June 14, 2022, Public Meeting with Entergy Operations, Inc. to Discuss Upcoming Relief Request to Use Code Case N-752 for Grand Gulf Nuclear Station, Unit 1, River Bend Station, Unit 1, and Waterford Steam Electric Station, Unit | |
ML22147A093 | 6 June 2022 | 2021 Annual Assessment Public Meeting Summary | Pandemic Coronavirus |
ML21323A047 | 6 December 2021 | Summary of Public Meeting on November 5, 2021, with the National Organization of Test, Research, and Training Reactors on Operator Licensing for Research and Test Reactors | License Renewal |
ML21181A335 | 1 July 2021 | June 23, 2021, Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project | Probabilistic Risk Assessment |
ML21158A223 | 8 June 2021 | Meeting Summary for Ticap Workshop 3 | Probabilistic Risk Assessment License Renewal Maintenance Rule Program |
ML21140A389 | 24 May 2021 | Riv Column 1 EOC 2020 Public Meeting Summary | Coronavirus |
ML21132A295 | 14 May 2021 | Summary of Public Meeting to Discuss Technology Inclusive Content of Application Project | Probabilistic Risk Assessment License Renewal Maintenance Rule Program |
ML21112A249 | 7 May 2021 | Summary of April 14, 2021, Redacted - Partially Closed Observation Meeting with Entergy Operations Inc., LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Revision 2 (EPID L-2020-LLA-0164) (Non-Pro | Anticipated operational occurrence Post Accident Monitoring Cyber Security Surveillance Frequency Control Program Foreign Material Exclusion Power Uprate |
ML21085A865 | 8 April 2021 | Summary of March 17, 2021, Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (EPID L-2020-LLA-0164) Non | Post Accident Monitoring Cyber Security Surveillance Frequency Control Program Foreign Material Exclusion Manual Operator Action |
ML21075A032 | 2 April 2021 | Summary of Redacted - Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Revision 2, Licensing Processes | Post Accident Monitoring Probabilistic Risk Assessment Operator Manual Action Cyber Security Surveillance Frequency Control Program Foreign Material Exclusion |
ML21071A286 | 1 April 2021 | Summary of Cat. 1 Public Meeting with Entergy Operations,Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital Instrumentation and Control Interim Staff Guidance No.06,Rev.2,Licensing Processes NON-PROPRIETARY | Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Cyber Security Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion Power Uprate |
ML21039A268 | 22 February 2021 | Summary of Category 1 Meetings with Entergy Operations, Inc. LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station, Unit 3 | Post Accident Monitoring Cyber Security Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion Power Uprate |
ML21032A013 | 19 February 2021 | 01/06 and 01/21/2021 Summary of - Category 1 Meetings with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C ISG No. 06, Rev. 2 for Waterford Steam Electric Station | Post Accident Monitoring Probabilistic Risk Assessment Cyber Security Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion |
ML21013A336 | 26 January 2021 | December 17, 2020, Summary of Category 1 Public Pre-Application Meeting with Entergy Operations,Inc. Regarding Proposed LAR to Adopt Risk-Informed TS Allowed Outage Times for Waterford Steam Electric Station, Unit 3 | Ultimate heat sink Probabilistic Risk Assessment FLEX Large early release frequency |
ML21012A202 | 15 January 2021 | Summary of December 15, 2020, Category 1 Public Pre-Application Meeting with Entergy Operations, Inc. Regarding Proposed LAR to Relocate Specific Technical Specifications for Waterford Steam Electric Station, Unit 3 | Probabilistic Risk Assessment |
ML20325A241 | 17 December 2020 | Summary of November 18, 2020, REDACTED- Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes | Cyber Security Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion |
ML20315A267 | 17 December 2020 | Summary of October 21,2020, Redacted Category 1 Public Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06,Rev.2, Licensing Processes(NON-PROPRIETARY) | Incorporated by reference Surveillance Frequency Control Program |
ML20325A321 | 17 December 2020 | Summary of November 4, 2020, Nonproprietary - Category 1 Meeting with Entergy Operations, Inc. Regarding LAR to Install Digital Upgrade in Accordance with Digital I&C Interim Staff Guidance No. 06, Rev. 2, Licensing Processes (Redacted) | Probabilistic Risk Assessment Cyber Security Incorporated by reference Surveillance Frequency Control Program Foreign Material Exclusion |
ML20288A742 | 22 October 2020 | Summary of September 22, 2020, Meeting License Amendment Request to Install Digital Upgrade (EPID L-2020-LLA-0164) (Non-proprietary Version) | Cyber Security Surveillance Frequency Control Program |
ML20182A447 | 8 July 2020 | Summary of June 11, 2020, Teleconference Meeting with Entergy Operations, Inc. to Discuss Proposed License Amendment Request for Waterford Steam Electric Station, Unit 3 Regarding Adoption of 10 CFR 50.69 | Probabilistic Risk Assessment FLEX Surveillance Frequency Control Program |
ML20189A283 | 7 July 2020 | Summary of Region IV Annual Assessment Public Meeting | Coronavirus COVID-19 |
ML20113E836 | 23 April 2020 | Summary of March 19, 2020, Category 1 Public Meeting with Entergy Operations Inc. a Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes at Waterford Steam Electric Station | Surveillance Frequency Control Program |
ML20106E888 | 20 April 2020 | Summary of Public Meeting with Entergy Operations, Inc. Planned LAR to Install Digital Systems in Accordance with Di&C ISG-06 Revision 2, Licensing Processes | |
ML20059K156 | 19 March 2020 | Discussion Topics for March 19, 2020 Fourth Partially Closed Public Meeting Regarding a Planned License Amendment Request to Install a Digital Modification to CPC and Ceac Systems Entergy Operations, Inc | |
ML20013G259 | 7 February 2020 | Summary of December 11, 2019 Partially Closed Presubmittal Meeting with Entergy Operations, Inc., to Discuss the Effect of a Planned LAR for Digital Instrumentation and Control Modification on Accident Analyses at Waterford (L-2019-LRM-0079 | |
ML19298B918 | 5 November 2019 | Summary of 9/19/19 Presubmittal Meeting with Entergy Operations, Inc. Re Request to Replace Core Protection Calculator and CEA Calculator Systems with Digital Systems in Accordance with DI&C-ISG-06, Revision 2 for Waterford Unit 3 | |
ML19247C388 | 10 September 2019 | Summary of August 29, 2019, Category 1 Public Meeting with Entergy a Request for a Fee Waiver for the Review of a Planned Digital Instrumentation and Control License Amendment Request | |
ML18323A421 | 26 November 2018 | Summary of Teleconference with Entergy Operations, Inc. License Amendment Request for Use of Tranflow Code for Determining Pressure Drops Across the Steam Generator Secondary Side Internal Components | |
ML18120A311 | 10 May 2018 | Summary of April 17, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Relief Request for Visual Inspection of Charging Pipes for the Waterford Steam Electric Station, Unit 3 | Stress corrosion cracking Thermal fatigue |
ML18107A497 | 27 April 2018 | April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements | |
ML18099A071 | 16 April 2018 | March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program | Surveillance Frequency Control Program Backfit |
ML18059A015 | 5 March 2018 | Summary of February 8, 2018, Category 1 Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Unit 3 Updated Final Safety Analysis Report Section 15.4.3.1 | |
ML18005A099 | 25 January 2018 | Summary of November 16, 2017, Public Meeting with Entergy Operations, Inc., Regarding Planned License Amendment Request to Revise the Waterford Steam Electric, Station Unit 3 Technical Specification 3/4.3.2 Table 4.3-2 | |
ML17353A154 | 22 December 2017 | Summary of Public Meeting with Entergy Operations, Inc., on Proposed Changes to Emergency Plans to Revise Emergency Action Levels for Arkansas; Grand Gulf; River Bend; and Waterford (EPID-L-2017-LRM-0060) | |
ML17331A088 | 6 December 2017 | Summary of Public Meeting with Entergy Operations, Inc. Neutron Fluence Calculation Method for the Waterford Steam Electric Station, Unit 3 | License Renewal |
ML17174B192 | 29 June 2017 | Summary of June 8, 2017, Category 1 Teleconference with Entergy Regarding Planned Request for Alternative Regarding High Pressure Safety Injection Pump for Waterford Steam Electric Station, Unit 3 | Mission time |
ML17174B226 | 28 June 2017 | Summary of June 1, 2017, Public Meeting with Entergy Regarding Planned License Amendment Request to Revise Technical Specification (TS) Table 3.7-3 and TS 3/4.7.4, Ultimate Heat Sink for Waterford Steam Electric Station | Ultimate heat sink Surveillance Frequency Control Program |
ML17090A047 | 31 March 2017 | Summary of Telecon Held on March 28, 2017, Between the NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) - Updated with ADAMS Accession Nos | Aging Management License Renewal |
ML17088A185 | 30 March 2017 | Summary of Telecon Held on March 28, 2017, Between NRC and Entergy Concerning RAI Pertaining to the Waterford Steam Electric Station License Renewal Application (Cac. No. MF7493) | Aging Management License Renewal |
ML16364A290 | 24 January 2017 | 12/8/16, Summary of Public Meeting with Entergy Operations, Inc., Regarding the License Amendment Request to Revise Technical Specification Table 4.3-2 to Relocate ESFAS Subgroup Relays to the SFCP for Waterford Steam Electric Station, Unit | Surveillance Frequency Control Program |
ML16323A229 | 24 January 2017 | 08/23-25/2016 Summary of Teleconference Meetings with Entergy Operations Inc., Concerning RAI Set 1 Pertaining to the Waterford Steam Electric Station, Unit 3 License Renewal Application | Coatings Aging Management Stress corrosion cracking Integrated leak rate test Moisture barrier License Renewal Dissimilar Metal Weld |
ML16356A582 | 30 December 2016 | 12/07/2016 Summary of Teleconference with Entergy Operations, Inc. Concerning Requests for Additional Information Set 10 Pertaining to the Waterford Steam Electric Station Unit 3 License Renewal Application | License Renewal |
ML16341B063 | 21 December 2016 | November 30, 2016 Summary of Teleconference Held Between NRC and Entergy Operations, Inc. Concerning RAI Set 9 Pertaining to the Waterford Steam Electric Station, Unit 3, License Renewal Application | License Renewal |
ML16125A083 | 4 May 2016 | Summary of Annual Assessment Meeting with Entergy Operations Inc Regarding Waterford-3 2015 Performance | Open House |
ML15239A739 | 31 August 2015 | Summary of Public Meeting with Entergy Operations, Inc. to Discuss Main Control Room Abandonment Regarding NFPA-805 License Amendment Request | Probabilistic Risk Assessment |
ML15196A415 | 15 July 2015 | Summary of Meeting with Entergy Corporation to Discuss Annual Performance Assessment | |
ML15117A503 | 6 May 2015 | April 22, 2015, Summary of Pre- Application Public Meeting with Entergy Operations, Inc., Waterford, Unit 3, to Discuss the License Amendment Request to Modify Technical Specification 3.1.3.4 and the Final Safety Analysis Report | Fire Protection Program |