ML12261A196

From kanterella
Jump to navigation Jump to search
Summary of Meeting with Waterford Steam Electric Station to Discuss the Performance of the Waterford Steam Electric Station, Unit 3, for the Period of July 1, 2011 Through June 30, 2012
ML12261A196
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/16/2012
From: Allen D
NRC/RGN-IV/DRP/RPB-E
To: Jacobs D
Entergy Operations
Allen D
References
Download: ML12261A196 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 September 16, 2012 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751

SUBJECT:

SUMMARY

OF PUBLIC MEETING FOR WATERFORD STEAM ELECTRIC STATION UNIT-3

Dear Ms. Jacobs:

On August 22, 2012, representatives of the NRC met with Waterford Steam Electric Station, Unit 3 personnel at the Hyatt Regency hotel in New Orleans, LA to present the results of the 2011 End of Cycle review to the public. The purpose of the open house was for members of the community to meet individually with NRC staff members to discuss the performance of the Waterford Steam Electric Station, Unit 3, for the period of July 1, 2011 through June 30, 2012.

The list of attendees is included as Enclosure 1 and the meeting slides are included as .

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Public Electronic Reading Room page of the NRCs public web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Donald B. Allen, Chief Project Branch E Division of Reactor Projects Docket: 50-382 License: NPF-38

Enclosures:

1. Attendance List
2. Meeting Slides

D. Jacobs Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Arthur.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Allen.Howe@nrc.gov)

Acting DRS Director (Tom.Blount@nrc.gov)

Acting DRS Deputy Director (Patrick.Louden@nrc.gov)

Branch Chief, DRP/E (Don.Allen@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Senior Resident Inspector (Marlone.Davis@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Administrative Assistant (Lisa.Qualye@nrc.gov)

DRA Administrative Assistant (Anita.Tannenbaum@nrc.gov)

Project Engineer (Jim.Melfi@nrc.gov)

Project Engineer (Dan.Bradley@nrc.gov)

WAT Administrative Assistant (Linda.Dufrene@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Kaly.Kalyanam@nrc.gov)

Project Manager (Jennivine Rankin@nrc.gov)

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Congressional Affairs Officer (Silas.Kennedy@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

OEMail Resource RIV/ETA: OEDO (Silas.Kennedy@nrc.gov)

NSIR/DPR/EP (Eric.Schrader@nrc.gov)

Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)

RidsNrrDirsipab.Resource@nrc.gov ROPassessment.Resource@nrc.gov R:\_REACTORS\_WAT\2012\Public Meeting Summary.docx ML12261A196 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials DBA Publicly Avail Yes No Sensitive Yes No Sens. Type Initials DBA SPE:DRP/E C:DRP/PBE RAzua DAllen 09/14/2012 09/16/2012 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax 2