ML051160220

From kanterella
Jump to navigation Jump to search
March 2005 Monthly Operating Report for D.C. Cook, Units 1 and 2
ML051160220
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/14/2005
From: Jensen J
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-53
Download: ML051160220 (8)


Text

.7 INDIANAIndiana Michigan Power INDIANACook Nuclear Plant MICHIGAN One Cook Place POWER POWER4AEP~corn BridgmanMI 49106 A unit of American Electric Power April 14, 2005 AEP:NRC:2691-53 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT In accordance with the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for March 2005 is submitted.

There are no new commitments associated with this submittal.

Should you have any questions, please contact Mr. Toby K. Woods, Compliance Supervisor, at (269) 466-2798.

Sincerely, Is. ensen Site Vice President JEN/jen Attachment

U. S. Nuclear Regulatory Commission AEP:NRC:269 1-53 Page 2 c: R. Aben - Department of Labor and Economic Growth ANI Nuclear Engineering Department L. Brandon - MDEQ - WHMD/HWRPS D. P. Fadel M. J. Finissi G. T. Gaffney - Canton R. A. F. Harris INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector. . .

D. W. Paul - Columbus W. H. Schalk J. A. Zwolinski

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 4/2/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1 Notes:
2. Reporting Period Mar-05
3. Licensed Thermal Power (MWt) 3304
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

1i1 Hours in Reporting Period 744.0 2160.0 265152.0

12. No. of Hrs. Reactor Was Critical 600.2 2016.2 184517.4
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 600.2 2016.2 181784.7
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 1934559.8 6608198.1 546280256.1
17. Gross Elect. Energy Gen. (MWH) 631370.0 2155500.0 177332223.0
18. Net Elect. Energy Gen. (MWH) 610381.0 2084765.0 170761526.7
19. Unit Service Factor 80.7 93.3 69.0
20. Unit Availability Factor 80.7 93.3 69.0
21. Unit Capacity Factor (MDC Net) 82.0 96.5 65.8
22. Unit Capacity Factor (DER Net) 80.4 94.6 64.5
23. Unit Forced Outage Rate 0.0 0.0 18.2
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup: Week of April 25, 2005
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 02-Apr-05 COMPLETED BY R. Harris TELEPHONE 269-465-5901 MONTH Mar-05 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 3/1/2005 1039 3/17/2005 1056 3/2/2005 1045 3/18/2005 1055 3/3/2005 1045 3/19/2005 1029 3/4/2005 1040 3/20/2005 1046 3/5/2005 1054 3/21/2005 1047 3/6/2005 1031 3/22/2005 1043 3/7/2005 1041 3/23/2005 1049 3/8/2005 1045 3/24/2005 960 3/9/2005 1042 3/25/2005 459 3/10/2005 1042 3/26/2005 0 3/11/2005 1048 3/27/2005 0 3/12/2005 1043 3/28/2005 0 3/13/2005 -1043 3/29/2005 0 3/14/2005 1044 3/30/2005 0 3/15/2005 1046 3/31/2005 0 3116/2005 1042

DOCKET NO. 50 - 315 UNIT NAME D.C. Cook Unit 1 DATE April 2, 2005 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - March 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE- TO PREVENT RECURRENCE 351 050326 S 143.8 C 1 N/A N/A N/A Scheduled refueling outage 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit l: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 DATE 4/2/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C.Cook Unit 2 Notes:
2. Reporting Period Mar-05
3. Licensed Thermal Power (MWt) 3468
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 2160.0 ;239298.0
12. NO. of Hrs. Reactor Was Critical 744.0 2135.0 157884.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 .2
14. Hours Generator on Line 744.0 2125.4 153887.7
15. Unit Reserve Shutdown Hours 0.0 0.0  ; 0.0
16. Gross Therm. Energy Gen. (MWH) 2573422.8 7315541.7 486197879.4
17. Gross Elect. Energy Gen. (MWH) 859810.0 2440910.0 157756478.0
18. Net Elect. Energy Gen. (MWH) 833291.0 2365603.0 152169017.6
19. Unit Service Factor 100.0 98.4 64.9
20. Unit Availability Factor 100.0 98.4 64.9
21. Unit Capacity Factor (MDC Net) 105.7 103.3 61.1
22. Unit Capacity Factor (DER Net) 102.8 100.5 59.4
23. Unit Forced Outage Rate 0.0 0.0 22.4
24. Shutdowns Scheduled over Next Six Months (Type.Dateand Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-316 UNIT TWO DATE 2-Apr-05 COMPLETED BY R. Harris TELEPHONE 269-465-5901 MONTH Mar-05 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 3/1/2005 1114 3/17/2005 1114 3/2/2005 1131 3/18/2005 1122 3/3/2005 1119 3/19/2005 1121 3/4/2005 1126 3/2012005 1123 3/5/2005 1119 3/21/2005 1133 3/6/2005 1115 3/22/2005 1113 317/2005 1136 3/23/2005 1123 3/8/2005 1115 3/24/2005 1126 3/9/2005 1112 3/25/2005 1126

. I ..

3/10/2005 1125 3/26/2005 1117 3/11/2005 1139 3/27/2005 1117 3/12/2005 1093 3/28/2005 1129 3/13/2005 1065 3/29/2005 1124 3/14/2005 1125 3/30/2005 1125 3/15/2005 1121 3/31/2005 1122 3/16/2005 1131 I

V DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE April 2, 2005 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - March 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE' HOURS REASON 2 REACTORS REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE None.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit l: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)