August 2005 Monthly Operating Report for Donald C. Cook Units 1 and 2
ML052700238
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/14/2005
From: Jensen J
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-58
Download: ML052700238 (8)


Text

INDIANA MICHIGAN A unit of American Electric Powver Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman,MI 49106 AERcom September 14,2005 Docket Nos.

50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P I-17 Washington, DC 20555-0001 AEP:NRC:2691-58 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT In accordance with the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for August 2005 is submitted.

There are no new commitments associated with this submittal.

Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Supervisor, at (269) 466-2649.

Sincerely, ns.

ensen Site Vice President JEN/jen Attachment 5g2'4

U. S. Nuclear Regulatory Commission Page 2 c: R. Aben - Department of Labor and Economic Growth ANI Nuclear Engineering Department L. Brandon - MDEQ - WHMD/HWRPS D. P. Fadel G. T. Gaffney - Canton R. A. F. Harris INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus W. H. Schalk L. J. Weber J. A. Zwolinski AEP:NRC:2691-58

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 9/6/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1 Notes:
2. Reporting Period Aug-05
3. Licensed Thermal Power (MWt) 3304
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date

11. Hours in Reporting Period 744.0 5831.0
12. No. of Hrs. Reactor Was Critical 744.0 5088.8
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Line 744.0 5035.4
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2455843.2 16423547.5
17. Gross Elect. Energy Gen. (MWH) 771000.0 5253947.0
18. Net Elect. Energy Gen. (MWH) 744622.0 5076043.7
19. Unit Service Factor 100.0 86.4
20. Unit Availability Factor 100.0 86.4
21. Unit Capacity Factor (MDC Net) 100.1 87.1
22. Unit Capacity Factor (DER Net) 98.1 85.3
23. Unit Forced Outage Rate 0.0 0.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Cumm.

268823.0 187590.0 463.0 184803.9 321.0 556095605.5 180430670.0 173752805.4 692 69.2 66.0 64.7 17.9

25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

il.

i:+*.

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 06-Sep-05 R. Harris 269-465-5901 MONTH Aug-05 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY 8/1/2005 8/2/2005 8/3/2005 8/4/2005 8/5/2005 8/6/2005 8/7/2005 8/8/2005 8/9/2005 8/10/2005 8/11/2005 8112/2005 8/13/2005 8/14/2005 8/15/2005 8/16/2005 DAY 989 999 982 993 955 1051 981 1000 996 985 990 989 995 1020 1018 1014 8/17/2005 8/18/2005 8/19/2005 8/20/2005 8/21/2005 8/22/2005 8/23/2005 8/24/2005 8/25/2005 8126/2005 8/27/2005 8/28/2005 8/29/2005 8/30/2005 8/31/2005 1000 1005 1003 992 995 1004 1012 1019 1014 1012 1014 1019 979 999 1004

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit 1 September 6, 2005 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - August 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE' HOURS REASON 2 REACTOR3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and Ucense Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit l: Same Source

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 9/6/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2 Notes:
2. Reporting Period Aug-05
3. Licensed Thermal Power (MWt) 3468
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. It Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 5831.0 242969.0
12. No. of Hrs. Reactor Was Critical 744.0 5806.0 161555.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 744.0 5796.4 157558.7
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2576048.7 20022808.3 498905146.0
17. Gross Elect. Energy Gen. (MWH) 817280.0 6561490.0 161877058.0
18. Net Elect. Energy Gen. (MWH) 791115.0 6356451.0 156159865.6
19. Unit Service Factor 100.0 99.4 65.5
20. Unit Availability Factor 100.0 99.4 65.5
21. Unit Capacity Factor (MDC Net) 100.3 102.8 61.7
22. Unit Capacity Factor (DER Net) 97.6 100.0 60.0
23. Unit Forced Outage Rate 0.0 0.0 22.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Estd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 6-Sep-05 R. Harris 269-465-5901 MONTH Aug-05 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL DAY 8/1/2005 8/2/2005 8/3/2005 8/4/2005 8/5/2005 8/6/2005 8/7/2005 8/8/2005 8/9/2005 8/10/2005 8/11/2005 8/12/2005 8/13/2005 8/14/2005 8/15/2005 8/16/2005 1046 1041 1038 1043 1044 1047 1040 1051 1041 1040 1052 1046 1056 1102 1096 1073 8/17/2005 8/18/2005 8/19/2005 8/20/2005 8/21/2005 8/22/2005 8/23/2005 8/24/2005 8/25/2005 8/26/2005 8/27/2005 8/28/2005 8/29/2005 8/30/2005 8/31/2005 1077 1065 1063 1052 1055 1068 1083 1106 1087 1094 1083 1075 1066 1079 1057

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 September 6, 2005 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - August 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO.

CODE4 CODE' TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit l: Same Source