ML24256A147
| ML24256A147 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/06/2024 |
| From: | Kaspar T Indiana Michigan Power Co |
| To: | Travis Iskierka-Boggs NRC/RGN-III |
| Travis Iskierka-Boggs | |
| Shared Package | |
| ML22335A447 | List: |
| References | |
| Download: ML24256A147 (1) | |
Text
INDIANA MICHIGAN POWER-An MP Company May 6, 2024 U.S. Nuclear Regulatory Commission Attn: Mr. Travis lskierka-Boggs Region Ill Examiner 2443 Warrenville Road, Suite 21 O Lisle, Illinois 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 2024 NRC EXAMINATION SUBMITTAL Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106
Reference:
Letter from April M. Nguyen, Nuclear Regulatory Commission, to Q. Shane Lies, Indiana Michigan Power Company, "Donald C. Cook Nuclear Power Plant, Units 1 and 2 - Confirmation of Initial License Examination," dated December 5, 2023.
Indiana Michigan Power Company, the licensee for D.C. Cook Nuclear Plant (CNP) Units 1 and 2, is providing as enclosures to this letter the Initial License Examination based on 3 Senior Reactor Operator (SRO) (U), 6 SRO (I), and 8 Reactor Operator (RO) candidates.
The examination, currently scheduled July 2024, is being prepared in accordance with NU REG 1021, Revision 12.
The following items are enclosed:
- 1)
Form 1.3-1 Examination Security Agreement Forms
- 2)
Form 2.3-2 Operating Test Quality Checklist Form
- 3)
Form 3.2-1 Administrative Topics (JPM) Outline Form (SRO)
- 4)
Form 3.2-1 Administrative Topics (JPM) Outline Form (RO)
- 5)
Form 3.2-2 Control Room/In-Plant Systems (JPM) Outline Form (SRO-I)
- 6)
Form 3.2-2 Control Room/In-Plant Systems (JPM) Outline Form (SRO-U)
- 7)
Form 3.2-2 Control Room/In-Plant Systems (JPM) Outline Form (RO)
- 8)
Form 3.2-3 Admin JPM Exams a)
NRC RO34-A1a-RO b)
NRC RO34-A 1 a-SRO c)
NRC RO34-A 1 b-RO d)
NRC RO34-A1b-SRO e)
NRC RO34-A2-RO f)
NRC RO34-A2-SRO g)
NRC RO34-A3-RO h)
NRC RO34-A3-SRO i)
NRC RO34-A4-SRO
- 9)
Form 3.2-3 System JPM Exams a)
NRC RO34-SIM-a b)
NRC RO34-SIM-b c)
NRC RO34-SIM-c d)
NRC RO34-SIM-d e)
NRC RO34-SIM-e f)
NRC RO34-SIM-f
U.S. Nuclear Regulatory Commission May 3, 2024 Page 2 g) NRC RO34-SIM-g h)
NRC RO34-SIM-h i)
NRC RO34-INP-i j)
NRC RO34-INP-j k)
NRC R034-INP-k
- 10)
Form 3.3-1 Scenario Outline:
a) NRC2024-01 b)
NRC2024-02 c)
NRC2024-Spare
- 11)
Form 3.3-2 Required Operator actions - NRC2024-01
- 12)
Form 3.3-2 Required Operator actions - NRC2024-02
- 13)
Form 3.3-2 Required Operator actions - NRC2024-Spare
- 14)
Form 3.4-1 Event and Evolution Checklist-Crew 1
- 15)
Form 3.4-1 Event and Evolution Checklist - Crew 2
- 16)
Form 3.4-1 Event and Evolution Checklist-Crew 3
- 17)
Form 3.4-1 Event and Evolution Checklist - Crew 4
- 18)
Form 3.4-1 Event and Evolution Checklist - Crew 5
- 19)
Form 3.4-1 Event and Evolution Checklist - Crew 6
- 20)
Form 2.3-4 Written Examination Quality Checklist
- 21)
CNP 2024 NRC Written Examination (100 questions with references)
- 22)
CNP 2024 NRC Written Examination Key (no references)
A complete electronic copy of documents with initials or signatures for the Public Document Room (ADAMS) has been provided. This contains an electronic PDF version of the SRO examination Key that is to be administered. No paper copies of any material will be supplied per your request. The full Written Examination Outline (Rev. 1) has been previously submitted and is not included in this package None of these materials are to go to the Public Document Room (ADAMS) until after the examination has been completed.
If you have any questions, please contact Todd Valley or Tim Johansen at (269) 465-5901, extension 3738, or myself at (269) 466-3084.
Sincerely,
~~
Tod Kaspar Operations Training Manager Enclosures