ML051730433
| ML051730433 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/14/2005 |
| From: | Jensen J Indiana Michigan Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| AEP:NRC:2691-55 | |
| Download: ML051730433 (8) | |
Text
INDIANA MICHIGAN POWERie A unit of American Electric Poster Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, MI 49106 AEPcom June 14, 2005 Docket Nos.
50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 AEP:NRC:2691-55 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT In accordance with the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for May 2005 is submitted.
There are no new commitments associated with this submittal.
Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Supervisor, at (269) 466-2649.
Sincerely, Jbs5ph N. Jensen Site Vice President JEN/jen Attachment
J' If
U. S. Nuclear Regulatory Commission AEP:NRC:269 1-55 Page 2 c: R. Aben - Department of Labor and Economic Growth ANI Nuclear Engineering Department L. Brandon - MDEQ - WHMDJHWRPS D. P. Fadel M. J. Finissi G. T. Gaffney - Canton R. A. F. Harris INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus W. H. Schalk J. A. Zwolinski
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 6/3/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 1 Notes:
- 2. Reporting Period May-05
- 3. Licensed Thermal Power (MWt) 3304
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
- 11. Hours in Reporting Period 744.0
- 12. No. of Hrs. Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2455223.0
- 17. Gross Elect. Energy Gen. (MWH) 788640.0
- 18. Net Elect. Energy Gen. (MWH) 762116.0
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (MDC Net) 102.4
- 22. Unit Capacity Factor (DER Net) 100.4
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Yr. to Date 3623.0 2880.8 0.0 2856.6 0.0 9262611.7 3004670.0 2904117.7 78.8 78.8 80.2 78.6 0.0 Cumm.
266615.0 185382.0 463.0 182625.1 321.0 548934669.6 178181393.0 171580879.4 69.0 69.0 65.7 64.5 18.1
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 03-Jun-05 R. Harris 269-465-5901 MONTH May-05 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 5/1/2005 5/2/2005 5/3/2005 5/4/2005 5/5/2005 5/6/2005 5/7/2005 5/8/2005 5/9/2005 5/10/2005 5/11/2005 5/12/2005 5/13/2005 5/14/2005 5/15/2005 5/16/2005 1017 1017 1016 1023 1017 1022 1031 1024 1032 1014 1027 1045 1002 1027 1032 1018 5/17/2005 5/18/2005 5/19/2005 5/20/2005 5/21/2005 5/22/2005 5/23/2005 5/24/2005 5/25/2005 5/26/2005 5/27/2005 5/28/2005 5/29/2005 5/30/2005 5/31/2005 1027 1024 1038 1020 1025 1026 1040 1011 1026 1033 1015 1028 1021 1060 997
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit 1 June 3, 2005 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - May 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE None.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit l: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 6/3/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2 Notes:
- 2. Reporting Period May-05
- 3. Licensed Thermal Power (MWt) 3468
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date Cumm.
1 1. Hours in Reporting Period 744.0 3623.0 240761.0
- 12. No. of Hrs. Reactor Was Critical 744.0 3598.0 159347.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator on Line 744.0 3588.4 155350.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2565723.0 12375322.7 491257660.4
- 17. Gross Elect. Energy Gen. (MWH) 847960.0 4119890.0 159435458.0
- 18. Net Elect. Energy Gen. (MWH) 821733.0 3992842.0 153796256.6
- 19. Unit Service Factor 100.0 99.0 65.2
- 20. Unit Availability Factor 100.0 99.0 65.2
- 21. Unit Capacity Factor (MDC Net) 104.2 104.0 61.4
- 22. Unit Capacity Factor (DER Net) 101.3 101.1 59.7
- 23. Unit Forced Outage Rate 0.0 0.0 22.2
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 3-Jun-05 R. Harris 269-465-5901 MONTH May-05 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 5/1/2005 5/2/2005 5/3/2005 5/4/2005 5/5/2005 5/6/2005 5/7/2005 5/8/2005 5/9/2005 5/10/2005 5/11/2005 5/12/2005 5/13/2005 5/14/2005 5/15/2005 5/16/2005 1115 1126 1108 1115 1112 1116 1116 1112 1115 1112 1117 1114 1116 1115 1118 1108 5/17/2005 5/18/2005 5/19/2005 5/20/2005 5/21/2005 5/22/2005 5/23/2005 5/24/2005 5/25/2005 5/26/2005 5/27/2005 5/28/2005 5/29/2005 5/30/2005 5/31/2005 1116 1096 1115 1112 998 1018 1111 1105 1117 1103 1103 1106 1116 1087 1099
A i
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 June 3, 2005 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - May 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON2 REACTOR 3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE None.
I 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit l: Same Source