January 2003 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 & 2
ML030580467
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/14/2003
From: Greenlee S
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-27
Download: ML030580467 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER February 14, 2003 Docket Nos.

AEP:NRC:2691-27 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for January 2003 is submitted.

Sincerely, Scot A. Greenlee Director, Nuclear Technical Services BWO/jen Attachments

U. S. Nuclear Regulatory Commission AEP:NRC:2691-27 Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health M. J. Finissi G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 2/4/03 COMPLETED BY RAF Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit 1 Notes:
2. Reporting Period Jan-03 Licensed Thermal Power
3. Licensed Thermal Power (MWt) 3304 from 3250 MWt to 3304 !*
4. Name Plate Rating (Gross MWe) 1152 2003 @ 17:59 hours.
5. Design Electrical Rating (Net MWe) 1020 Electrical Ratings to be a
6. Maximum Dependable Capacity(GROSS MWe) 1056 following unit 2 thermal p
7. Maximum Dependable Capacity (Net MWe) 1000 change and additional te=
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons I irtoneri Th*rmni Pnwor r-tinn rh~nnnrl frnm RAgn MWt tn '1104 MWt nn Ann A 2qn0n a 17:59 hours.

Electrical Ratinas to be adiusted followina unit 2 thermal oower ratina chanae and additional testina.

9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Yr. to Date

11. Hours in Reporting Period 744.0 744.0
12. No. of Hrs. Reactor Was Critical 356.2 356.2
13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Line 356.2 356.2
15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 1165632.3 1165632.3
17. Gross Elect. Energy Gen. (MWH) 381690.0 381690.0
18. Net Elect. Energy Gen. (MWH) 369158.7 369158.7
19. Unit Service Factor 47.9 47.9
20. Unit Availability Factor 47.9 47.9
21. Unit Capacity Factor (MDC Net) 49.6 49.6
22. Unit Capacity Factor (DER Net) 48.6 48.6
23. Unit Forced Outage Rate 52.1 52.1
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup:

Tht-Unit Pntprpri Mndrp 1 nn Februtrv 4. 2003.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION rating changed AWt on Jan 3, djusted ower rating sting.

Cumm.

246192.0 167704.8 463.0 165045.1 321.0 491434706.9 159624120.0 153644355.2 67.5 67.5 63.9 62.6 19.3 Flectrical Ratinas to be adiusted followino unit 2 thermal power rating change and additional testing.

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 04-Feb-03 RAF Harris 269-465-5901 MONTH Jan-03 AVERAGE DAILY POWER LEVEL 1030 1034 1034 1030 1036 1023 1035 1029 1046 1041 1040 1046 1040 1045 871 0

DAY 1/17103 1/18/03 1/19103 1/20103 1/21103 1/22/03 1/23/03 1/24/03 1/25/03 1/26/03 1/27/03 1/28/03 1/29103 1/30/03 1/31/03 AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

DAY 1/1/03 1/2/03 1/3/03 1/4/03 1/5/03 116/03 1/7/03 1/8/03 1/9103 1/10/03 1/11/03 1/12/03 1/13/03 1/14/03 1/15/03 1/16103

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1 February 6, 2003 B. O'Rourke 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - January 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.

CODE 4 CODE' TO PREVENT RECURRENCE 347 030115 F

387.8 A

3 315/2003-001 EL XFMR The unit was shutdown due to a fault and subsequent fire in the Unit 1 main transformer. The cause of the fault is under investigation. The main transformer has been replaced. Actions to prevent recurrence will be identified once the cause of the transformer fault is known.

..A ovi-r, 9

MP ONl NT 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3* ME' I HODL.:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)

-+

0 112

-II Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit I: Same Source

N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 2/4/03 COMPLETED BY RAF Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit 2 Notes:
2. Reporting Period Jan-03
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

Y

11. Hours in Reporting Period 744.0
12. No. of Hrs. Reactor Was Critical 665.2
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator on Line 654.3
15. Unit Reserve Shutdown Hours 0.0
16. Gross Therm. Energy Gen. (MWH) 2184958.3
17. Gross Elect. Energy Gen. (MWH) 723090.0
18. Net Elect. Energy Gen. (MWH) 700625.9
19. Unit Service Factor 87.9
20. Unit Availability Factor 87.9
21. Unit Capacity Factor (MDC Net) 88.8
22. Unit Capacity Factor (DER Net) 86.4
23. Unit Forced Outage Rate 12.1
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Rpfi hpInn nitfnpc.* hPdiklp~d fnr Anril 2003

r. to Date 744.0 665.2 0.0 654.3 0.0 2184958.3 723090.0 700625.9 87.9 87.9 88.8 86.4 12.1
25. If Shut Down At End of Report Period, Est'ed Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.

220338.0 142233.3 0.0 138394.8 0.0 433408655.6 140496790.0 135453365.2 63.5 63.5 59.2 57.5 23.8

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 4-Feb-03 RAF Harris 269-465-5901 MONTH Jan-03 AVERAGE DAILY POWER LEVEL 1099 1109 1106 1107 1102 1094 1103 1104 1109 1094 1111 1096 1106 1111 1093 1098 DAY 1/17/03 1/18/03 1/19/03 1/20/03 1/21/03 1/22103 1/23/03 1/24/03 1/25/03 1/26/03 1/27/03 1/28/03 1/29/03 1/30/03 1/31/03 AVERAGE DAILY POWER LEVEL 1096 1097 1105 1100 1099 1098 1098 1097 1107 110 0

0 4

486 1054 DAY 1/1/03 1/2103 1/3103 1/4103 1/5103 1/6/03 1/7/03 1/8/03 119103 1/10/03 1/11/03 1/12/03 1/13/03 1/14/03 1/15/03 1/16/03

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 February 6, 2003 B. O'Rourke 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - January 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE 209 030126 F

89.7 A

1 316/2003-001 EK 65 The unit was shutdown in accordance with Technical Specifications when the CD EDG could not be returned to service within the allowed outage time following scheduled maintenance due to failure of the electronic governor. The cause of the governor failure is under investigation. Actions to prevent recurrence will be identified once the cause of the fault is known.

1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT: