Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER March 15, 2002 AEP:NRC:2691-08 Docket Nos.
50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P 1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for February 2002 is submitted.
Sincerely, Scot A. Greenlee Director, Nuclear Technical Services IJ/pae Attachments
U. S. Nuclear Regulatory Commission Page 2 c: ANI Nuclear Engineering Department G. P Arent A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock R. P. Powers M. W. Rencheck W. H. Schalk AEP:NRC:2691-08
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 3/5/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 1
- 2. Reporting Period Feb-02
- 3. Licensed Thermal Power (MWt) 3250
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7)
Notes:
Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date Cumm
- 11. Hours in Reporting Period 672.0 1416.0 238104.1
- 12. No. of Hrs. Reactor Was Critical 672.0 1416.0 160937.:
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 463.(
- 14. Hours Generator on Line 672.0 1416.0 158321.,
- 15. Unit Reserve Shutdown Hours 0.0 0.0 321.(
- 16. Gross Therm. Energy Gen. (MWH) 2182252.8 4553304.6 470058611.1
- 17. Gross Elect. Energy Gen. (MWH) 714670.0 1490860.0 152723680.1
- 16. Net Elect. Energy Gen. (MWH) 692089.0 1443140.0 146977434.1
- 19. Unit Service Factor 100.0 100.0 67.(
- 20. Unit Availability Factor 100.0 100.0 67.(
- 21. Unit Capacity Factor (MDC Net) 103.0 101.9 63.,
- 22. Unit Capacity Factor (DER Net) 101.0 99.9 62.(
- 23. Unit Forced Outage Rate 0.0 0.0 19.ý
- 24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
Refuelina outaee 18 is scheduled to beain durina the second auarter of 2002. The prooosed lenath of the outaae is 35 days.
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved 0
3 6
0 0
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 05-Mar-02 RAF Harris 616-465-5901 MONTH Feb-02 AVERAGE DAILY POWER LEVEL 1029 1029 1032 1032 1032 1038 1029 1030 1033 1033 1032 1033 1030 1034 1033 1037 DAY 2/17/02 2/18/02 2/19/02 2/20/02 2/21/02 2/22/02 2/23/02 2/24/02 2/25/02 2/26/02 2/27/02 2/28/02 AVERAGE DAILY POWER LEVEL 1029 1032 1031 1036 1023 1025 1020 1025 1025 1028 1016 1029 DAY 2/1/02 2/2/02 2/3/02 2/4/02 2/5/02 216/02 2/7102 2/8/02 2/9102 2/10/02 2/11/02 2/12/02 2/13/02 2/14/02 2/15/02 2/16/02
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50- 315 D.C. Cook Unit 1 March 11, 2002 N Jackiw 616-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - February 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE 5 TO PREVENT RECURRENCE I TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 3/5/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.C. Cook Unit 2 Notes:
- 2. Reporting Period Feb-02
- 3. Licensed Thermal Power (MWt) 3411
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date
- 11. Hours in Reporting Period 672.0 1416.0
- 12. No. of Hrs. Reactor Was Critical 85.4 517.5
- 13. Reactor Reserve Shutdown Hours 0.0 0.0
- 14. Hours Generator on Line 18.5 450.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 27833.8 1343609.3
- 17. Gross Elect. Energy Gen. (MWH) 3520.0 434540.0
- 18. Net Elect. Energy Gen. (MWH) 2972.7 419209.7
- 19. Unit Service Factor 2.8 31.8
- 20. Unit Availability Factor 2.8 31.8
- 21. Unit Capacity Factor (MDC Net) 0.4 27.9
- 22. Unit Capacity Factor (DER Net) 0.4 27.2
- 23. Unit Forced Outage Rate 4.1 0.2
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
- 25. If Shut Down At End of Report Period, Est'ed Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Commenced power escalation on 2/28/02.
Achieved Cumm.
212250.0 134622.5 0.0 130852.5 0.0 408170958.6 132261050.0 127484263.6 62.3 62.3 57.8 56.3 24.6
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 5-Mar-02 RAF Harris 616-465-5901 MONTH Feb-02 AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 DAY 2/17/02 2/18/02 2/19/02 2/20/02 2/21/02 2/22/02 2/23/02 2/24/02 2/25/02 2/26/02 2/27/02 2/28/02 AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
0 0
0 0
124 DAY 2/1/02 2/2/02 2/3/02 2/4/02 2/5/02 2/6/02 2/7/02 2/8/02 2/9/02 2/10102 2/11/02 2/12/02 2/13/02 2/14/02 2/15/02 2/16102
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 March 11, 2002 IN Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - February 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON2 REACTOR3 REPORT NO.
CODE 4 CODE5 TO PREVENT RECURRENCE 340 020201 S
652.7 C
2 Continuation of Unit 2 scheduled Refueling Outage (U2C13),
341 020228 F
0.8 A
4 Power reduction from approximately 28% to 2.5 % to adjust steam generator stop valve 2-MRV-220. Reactor remained in Mode 2.
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source