January 2002 Monthly Operating Report for Donald C. Cook, Units 1 & 2
ML020510026
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/14/2002
From: Greenlee S
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-03
Download: ML020510026 (6)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1373 INDIANA MICHIGAN POWER February 14, 2001 AEP:NRC:2691-03 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for January 2002 is submitted.

Sincerely, Scot A. Greenlee Director, Nuclear Technical Services

/pae Attachments

U. S. Nuclear Regulatory Commission AEP:NRC:2691-03 Page 2 c: ANI Nuclear Engineering Department G. P. Arent A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock R. P. Powers M. W. Rencheck W. H. Schalk

NRC OPERATING DATA REPORT DOCKET NO. 50-315 DATE February 1,2002 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS Note:

1. Unit Name D.C. Cook Unit 1
2. Reporting Period Jan - 2002
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 744.0 237432.0 744.0 744.0 160265.3
12. No. of Hrs. Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 744.0 744.0 157649.4
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0 2371051.8 2371051.8 467876358.8
16. Gross Thermal Energy Gen. (MWH)
17. Gross Electrical Energy Gen. (MWH) 776190.0 776190.0 152009010.0 751051.0 751051.0 146285345.0
18. Net Electrical Energy Gen. (MWH) 100.0 100.0 66.9
19. Unit Service Factor 100.0 100.0 66.9
20. Unit Availability Factor Unit Capacity Factor (MDC Net) 100.9 100.9 63.1 21.
22. Unit Capacity Factor (DER Net) 99.0 99.0 61.9 0.0 0.0 19.8
23. Unit Forced Outage Rate
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

Refueling outage 18 is scheduled to begin during the second quarter of 2002. The proposed length of the outage is 35 days.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit I DATE February 12, 2002 COMPLETED BY N Jackiw TELEPHONE 616-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - January 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE 1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE 341 020108 S B 4 Power reduction (- 20%) to plug condenser tubes.

4. ....... : 3 W
  • NI--

1 TYPE: 2 REASON: 3 METHOD: 4 S.YSTIEIM: Ex hbUMtIUSa:N IS:

1: Manual Exhibit G - Instructions Exhibit 1: Same Source F: Forced A: Equipment Failure (Explain)

B: Maintenance or Test 2: Manual Scram for preparation of data S: Scheduled C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

NRC OPERATING DATA REPORT DOCKET NO. 50- 316 DATE February 1, 2002 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS Note for Unit 2: A 20.1 GWHr

1. Unit Name D.C. Cook Unit 2 adjustment was made for Unit 2 due to a
2. Reporting Period Jan - 2002 gross generation metering circuit problem.
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Mo. Yr. to Date Cumm.

744.0 744.0 211578.0

11. Hours in Reporting Period
12. No. of Hrs. Reactor Was Critical 432.1 432.1 134537.1 0.0 0.0 0.0
13. Reactor Reserve Shutdown Hours 432.1 432.1 130834.0
14. Hours Generator on Line 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours 1315775.5 1315775.5 408143124.8
16. Gross Thermal Energy Gen. (MWH) 431020.0 431020.0 132257530.0
17. Gross Electrical Energy Gen. (MWH) 416237.0 416237.0 127481290.9
18. Net Electrical Energy Gen. (MWH) 58.1 58.1 62.5
19. Unit Service Factor 58.1 58.1 62.5
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net) 52.8 52.8 58.0 51.3 51.3 56.4
22. Unit Capacity Factor (DER Net) 0.0 0.0 24.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

Refueling outage 13 began on January 19, 2002. The proposed length of the outage is 45 days.

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

DOCKET NO. 50 -316 UNIT NAME D.C. Cook Unit 2 DATE February 1, 2002 COMPLETED BY IN Jackiw TELEPHONE 616-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - January 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODES TO PREVENT RECURRENCE 340 011219 S 311.9 C 1 Scheduled Unit2 Refueling Outage (U2C13).

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source F: Forced S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)