May 2004 Monthly Operating Report for Donald C. Cook Nuclear Plant Units 1 and 2
ML041690137
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/10/2004
From: Zwolinski J
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-43
Download: ML041690137 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER June 10, 2004 AEP:NRC:2691-43 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for May 2004 is submitted.

There are no new commitments associated with this submittal.

Should you have any questions, please contact Mr. Toby K. Woods, Compliance Supervisor, at (269) 466-2798.

Sincerely, John A. Zwolinski Safety Assurance Director JEN/jen Attachment

U. S. Nuclear Regulatory Commission AEP:NRC:2691-43 Page 2 c: R. Aben - Department of Labor and Economic Growth ANI Nuclear Engineering Department L. Brandon - MDEQ - WHMD/HWRPS D. P. Fadel M. J. Finissi G. T. Gaffney - Canton INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region m NRC Resident Inspector D. W. Paul - Columbus T. C. Pham W. H. Schalk J. A. Zwolinski

-I -

Ir . ;i'* I' "

I.@::

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 6/3/2004 COMPLETED BY T.Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1 Notes:
2. Reporting Period May-04
3. Licensed Thermal Power (MWt) 3304
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 3648.0 257856.0
12. No. of Hrs. Reactor Was Critical 744.0 3462.9 177364.2
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 744.0 3451.9 174631.5
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2455250.0 11349105.2 522717632.7
17. Gross Elect. Energy Gen. (MWH) 793700.0 3684980.0 169726783.0
18. Net Elect. Energy Gen. (MWH) 767677.0 3563851.8 163409135.7
19. Unit Service Factor 100.0 94.6 68.2
20. Unit Availability Factor 100.0 94.6 68.2
21. Unit Capacity Factor (MDC Net) 103.2 97.7 64.8
22. Unit Capacity Factor (DER Net) 101.2 95.8 63.5
23. Unit Forced Outage Rate 0.0 0.0 18.8
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-315 "i UNIT ONE DATE 03-Jun-04 COMPLETED BY T.Pham TELEPHONE 269-465-5901 MONTH May-04 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 5/1/2004 1038 5/17/2004 1006 5/2/2004 1044 5/18/2004 1034 5/3/2004 1023 5/19/2004 1030 5/4/2004 1033 5/20/2004 1026 5/5/2004 1036 5/21/2004 1055 5/6/2004 1034 5/22/2004 998 5/7/2004 1040 5/23/2004 1027 5/8/2004 1032 5/24/2004 1036 5/9/2034 1035 5/25/2004 1032 5/10/2004 1027 5/26/2004 1027 5/11/2004 1035 5/27/2004 1030 5/12/2004 1023 5/28/2004 1034 5/13/2004 1030 5/29/2004 1034 5/14/2004 1032 5/30/2004 1027 5/15/2004 1042 5/16/2004 1054

DOCKET NO. 50 - 315 UNIT NAME D.C. Cook Unit 1 DATE June 3, 2004 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER F:EDUCTIONS - May 2004 METHOD OF k SHUTTING UCENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE None.

I TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit l: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

Ucense Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 DATE 6/3/2004 COMPLETED BY T.Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D.C. Cook Unit 2 Noaes:
2. Reporting Period May-04
3. Licensed Thermal Power (MWt) 3468
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur InCapacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours In Reporting Period 744.0 3648.0 232002.0
12. No. of Hrs. Reactor Was Critical 744.0 3393.0 151676.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Une 744.0 3359.2 147713.4
15. Unit Reserve Shutdown Hours 0.3 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2577869.8 11439647.4 465115506.9
17. Gross Elect. Energy Gen. (MWH) 844840.0 3770338.0 150884368.0
18. Net Elect. Energy Gen. (MWH) 818450.0 3650667.5 145515574.2
19. Unit Service Factor 100.0 92.1 64.3
20. Unit Availability Factor 100.0 92.1 64.3
21. Unit Capacity Factor (MDC Net) 103.8 94.4 60.3
22. Unit Capacity Factor (DER Net) 100.9 91.8 58.6
23. Unit Forced Outage Rate 0.0 7.9 23.1
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):_
25. If Shut Down At End of Report Period, Est'd Date of Startu
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

,f DOCKET NO. 50-316 K' UNIT TWO DATE 3-Jun-04 COMPLETED BY T.Pham TELEPHONE 269-465-5901 MONTH May-04 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 5/11/2004 1109 5/17/2004 1102 5/2/2004 1107 5/18/2004 1098 5/3/2004 1108 5/19/2004 1092 5/4/2004 1111 5/20/2004 1094 5/5/2004 1110 5/21/2004 1093 5/6/2004 1107 5/2212004 1092 5/7/2004 1109 5/23/2004 1095 5/8/2004 1107 5/24/2004 1092 5/9/2004 1104 5/25/2004 1093 5/10/2004 1101 5/26/2004 1091 5/11/2004 1100 5/27/2004 1097 5/12/2004 1100 5/28/2004 1099 5/13/2004 1098 5/29/2004 1106 5/14/2004 1097 5/30/2004 1095 5/15/2004 1101 5/16/2004 1099

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE June 3, 2004 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - May 2004 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT I, SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE None.

I TVPF: 2 REAS:zn q METHOWD: A SVYTEM: 5 CMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit l: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Ucensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)