Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER June 10, 2004 AEP:NRC:2691-43 Docket Nos.
50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for May 2004 is submitted.
There are no new commitments associated with this submittal.
Should you have any questions, please contact Mr. Toby K. Woods, Compliance Supervisor, at (269) 466-2798.
Sincerely, John A. Zwolinski Safety Assurance Director JEN/jen Attachment
U. S. Nuclear Regulatory Commission AEP:NRC:2691-43 Page 2 c: R. Aben - Department of Labor and Economic Growth ANI Nuclear Engineering Department L. Brandon - MDEQ - WHMD/HWRPS D. P. Fadel M. J. Finissi G. T. Gaffney - Canton INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region m NRC Resident Inspector D. W. Paul - Columbus T. C. Pham W. H. Schalk J. A. Zwolinski
- I Ir. ;i '*
I '
I.@::
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 6/3/2004 COMPLETED BY T.Pham TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 1 Notes:
- 2. Reporting Period May-04
- 3. Licensed Thermal Power (MWt) 3304
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
- 11. Hours in Reporting Period 744.0
- 12. No. of Hrs. Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2455250.0
- 17. Gross Elect. Energy Gen. (MWH) 793700.0
- 18. Net Elect. Energy Gen. (MWH) 767677.0
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (MDC Net) 103.2
- 22. Unit Capacity Factor (DER Net) 101.2
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Yr. to Date 3648.0 3462.9 0.0 3451.9 0.0 11349105.2 3684980.0 3563851.8 94.6 94.6 97.7 95.8 0.0 Cumm.
257856.0 177364.2 463.0 174631.5 321.0 522717632.7 169726783.0 163409135.7 68.2 68.2 64.8 63.5 18.8
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315
" i ONE 03-Jun-04 T.Pham 269-465-5901 MONTH May-04 AVERAGE DAILY POWER LEVEL DAY DAY 5/1/2004 5/2/2004 5/3/2004 5/4/2004 5/5/2004 5/6/2004 5/7/2004 5/8/2004 5/9/2034 5/10/2004 5/11/2004 5/12/2004 5/13/2004 5/14/2004 5/15/2004 5/16/2004 1038 1044 1023 1033 1036 1034 1040 1032 1035 1027 1035 1023 1030 1032 1042 1054 5/17/2004 5/18/2004 5/19/2004 5/20/2004 5/21/2004 5/22/2004 5/23/2004 5/24/2004 5/25/2004 5/26/2004 5/27/2004 5/28/2004 5/29/2004 5/30/2004 AVERAGE DAILY POWER LEVEL 1006 1034 1030 1026 1055 998 1027 1036 1032 1027 1030 1034 1034 1027
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit 1 June 3, 2004 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER F:EDUCTIONS - May 2004 METHOD OF k
SHUTTING UCENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON2 REACTOR 3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE None.
I TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and Ucense Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit l: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 6/3/2004 COMPLETED BY T.Pham TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2 Noaes:
- 2. Reporting Period May-04
- 3. Licensed Thermal Power (MWt) 3468
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
- 11. Hours In Reporting Period 744.0
- 12. No. of Hrs. Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Une 744.0
- 15. Unit Reserve Shutdown Hours 0.3
- 16. Gross Therm. Energy Gen. (MWH) 2577869.8
- 17. Gross Elect. Energy Gen. (MWH) 844840.0
- 18. Net Elect. Energy Gen. (MWH) 818450.0
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (MDC Net) 103.8
- 22. Unit Capacity Factor (DER Net) 100.9
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):_
Yr. to Date 3648.0 3393.0 0.0 3359.2 0.0 11439647.4 3770338.0 3650667.5 92.1 92.1 94.4 91.8 7.9 Cumm.
232002.0 151676.3 0.0 147713.4 0.0 465115506.9 150884368.0 145515574.2 64.3 64.3 60.3 58.6 23.1
- 25. If Shut Down At End of Report Period, Est'd Date of Startu
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
,f DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 K
TWO 3-Jun-04 T.Pham 269-465-5901 MONTH May-04 AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL DAY 5/11/2004 5/2/2004 5/3/2004 5/4/2004 5/5/2004 5/6/2004 5/7/2004 5/8/2004 5/9/2004 5/10/2004 5/11/2004 5/12/2004 5/13/2004 5/14/2004 5/15/2004 5/16/2004 1109 1107 1108 1111 1110 1107 1109 1107 1104 1101 1100 1100 1098 1097 1101 1099 5/17/2004 5/18/2004 5/19/2004 5/20/2004 5/21/2004 5/2212004 5/23/2004 5/24/2004 5/25/2004 5/26/2004 5/27/2004 5/28/2004 5/29/2004 5/30/2004 1102 1098 1092 1094 1093 1092 1095 1092 1093 1091 1097 1099 1106 1095
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 June 3, 2004 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - May 2004 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT I, SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON2 REACTOR 3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE None.
I TVPF:
2 REAS:zn q METHOWD:
A SVYTEM:
5 CMPONENT:
F: Forced S: Scheduled A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)
Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161)
Exhibit l: Same Source