ML053630045

From kanterella
Jump to navigation Jump to search
December 2005 Monthly Operating Report for Donald C. Cook, Units 1 and 2
ML053630045
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/14/2005
From: Fadel D
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-61
Download: ML053630045 (8)


Text

.1 Indiana Michigan Power Company Nuclear Generation Group INDIANA One Cook Place MICHIGAN Bridgman, Ml 49106 POWER aep.com December 14, 2005 AEP:NRC:2691-61 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT In accordance with the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 5.6.4, the attached Monthly Operating Report for November 2005 is submitted.

There are no new commitments associated with this submittal.

Should you have any questions, please contact Mr. Michael K Scarpello, Regulatory Affairs Supervisor, at (269) 466-2649.

Sincerely, Engineering Vice President JEN/jen Attachment 2P1

1 A

U. S. Nuclear Regulatory Commission AEP:NRC:2691-61 Page 2 c: R. Aben - Department of Labor and Economic Growth ANI Nuclear Engineering Department L. Brandon - MDEQ - WHMD/RPMWS D. P. Fadel G. T. Gaffriey - Canton R. A. F. Harris INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies R. D. Lingle D. H. Malin K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus M. A. Peifer W. H. Schalk L. J. Weber J. A. Zwolinski

NRC OPERATING DATA REPORT DOCKET NO. 50-315 DATE 12/4/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name Donald C. Cook Nuclear Plant Unit 1 Notes:
2. Reporting Period Nov-05
3. Licensed Thermal Power (MWt) 3304
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000 . .
8. IfChanges Occur in Capacity Ratings (Items no. 3 through 7)Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 720.0 8016.0 271008.0
12. No. of Hrs. Reactor Was Critical 720.0 7256.4 189757.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 720.0 7198.1 186966.6
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 2376432.9 23535314.0 563207372.0
17. Gross Elect. Energy Gen. (MWH) 772880.0 7535879.0 182712602.0
18. Net Elect. Energy Gen. (MWH) 747264.0 7281472.7 175958234.4
19. Unit Service Factor 100.0 89.8 69.5
20. Unit Availability Factor 100.0 89.8 69.5
21. Unit Capacity Factor (MDC Net) 103.8 90.8 66.3
22. Unit Capacity Factor (DER Net) 101.8 89.1 65.0
23. Unit Forced Outage Rate 0.0 0.3 17.8
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Page 1 of 6

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 04-Dec-05 COMPLETED BY R. Harris TELEPHONE 269-465-5901 MONTH Nov-05 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 11/1/2005 1029 11/17/2005 1051 11/2/2005 1034 11/18/2005 1059 11/3/2005 1034 11/19/2005 1017 11/4/2005 1036 11/20/2005 1021 11/5/2005 1032 11/21/2005 1055 11/6/2005 1043 11/22/2005 1040 11/7/2005 1031 11/23/2005 1038 11/8/2005 1033 11/24/2005 1070 11/9/2005 1026 11/25/2005 1012 11/10/2005 1039 11/26/2005 1039 11/11/2005 1026 11/27/2005 1052 11/12/2005 1043 11/28/2005 1031 11/13/2005 1036 11/29/2005 1078 11/14/2005 1040 11/30/2005 1009 11/15/2005 1041 11/16/2005 1039 Page 2 of 6

DOCKET NO. 50-315 UNIT NAME Donald C. Cook Nuclear Plant Unit 1 DATE December 4, 2005 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 3 of 6 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit l: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

NRC OPERATING DATA REPORT DOCKET NO. 50-316 DATE 12/4/2005 COMPLETED BY R.Harris TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name Donald C. Cook Nuclear Plant Unit 2 Notes:
2. Reporting Period Nov-05
3. Licensed Thermal Power (MWt) 3468
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7)Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 720.0 8016.0 245154.0
12. No. of Hrs. Reactor Was Critical 658.6 7900.6 163649.8
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Une 635.5 7860.1 159622.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2178681.3 27107721.5 505990059.3
17. Gross Elect. Energy Gen. (MWH) 716790.0 8864610.0 164180178.0
18. Net Elect. Energy Gen. (MWH) 694258.0 8586022.0 158389436.6
19. Unit Service Factor 88.3 98.1 65.7
20. Unit Availability Factor 88.3 98.1 65.7
21. Unit Capacity Factor (MDC Net) 91.0 101.0 62.1
22. Unit Capacity Factor (DER Net) 88.5 98.3 60.3
23. Unit Forced Outage Rate 11.7 1.1 21.8
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Scheduled refueling outage - March 2006

25. If Shut Down At End of Report Period, Esrd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Page 4 of 6

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-316 UNIT TWO DATE 4-Dec-05 COMPLETED BY R. Harris TELEPHONE 269-465-5901 MONTH Nov-05 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 11/1/2005 1098 11/17/2005 1107 11/2/2005 1104 11/18/2005 1113 11/3/2005 1101 11/19/2005 1106 11/4/2005 1104 11/20/2005 1103 11/5/2005 1106 11/21/2005 1106 11/6/2005 1095 11/22/2005 1117 11/7/2005 1098 11/23/2005 1124 11/8/2005 183 11/24/2005 1107 11/9/2005 0 11/25/2005 1114 11/10/2005 0 11/26/2005 1113 11/11/2005 84 11/27/2005 1113 11/12/2005 981 11/28/2005 1115 11/13/2005 1093 11/29/2005 1122 11/14/2005 1097 11/30/2005 1099 11/15/2005 1108 11/16/2005 1115 Page 5 of 6

DOCKET NO. 50 - 316 UNIT NAME Donald C. Cook Nuclear Plant Unit 2 DATE December 4, 2005 COMPLETED BY J. Newmiller TELEPHONE 269-465-5901 PAGE 6 of 6 UNIT SHUTDOWNS AND POWER REDUCTIONS - November 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO. CODE 4 CODE 5 TO PREVENT RECURRENCE 224 051108 F 84.5 A 3 2005-001-00 TL EXC Reactor trip due to Main Generator Exciter failure.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit l: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)