ML050820237
| ML050820237 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 03/15/2005 |
| From: | Jensen J Indiana Michigan Power Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| AEP:NRC:2691-52 | |
| Download: ML050820237 (8) | |
Text
Indiana Michigan Power INDIANA Cook Nuclear Plant MICHIGAN One Cook Place PVER' BridgmanMI 49106 A unit of American Electric Power March 15, 2005 AEP:NRC:2691-52 Docket Nos.
50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units I and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for February 2005 is submitted.
There are no new commitments associated with this submittal.
Should you have any questions, please contact Mr. Toby K. Woods, Compliance Supervisor, at (269) 466-2798.
Sincerely, Joseph N. Jensen Site Vice President JEN/jen Attachment
U. S. Nuclear Regulatory Commission AEP:NRC:2691-52 Page 2 c: R. Aben - Department of Labor and Economic Growth ANI Nuclear Engineering Department L. Brandon - MDEQ - WHMDJHWRPS D. P. Fadel M. J. Finissi G. T. Gaffney - Canton R. A. F. Harris INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region HI NRC Resident Inspector D. W. Paul - Columbus W. H. Schalk J. A. Zwolinski
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 3/3/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit I Notes:
- 2. Reporting Period Feb-S05
- 3. Licensed Thermal Power (MWt) 3304
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date Cumm.
- 11. Hours in Reporting Period 672.0 1416.0 264408.0
- 12. No. of Hrs. Reactor Was Critical 672.0 1416.0 183917.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
- 14. Hours Generator on Line 672.0 1416.0 181184.5
- 15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
- 16. Gross Therm. Energy Gen. (MWH) 2218229.8 4673638.4 544345696.3
- 17. Gross Elect. Energy Gen. (MWH) 724440.0 1524130.0 176700853.0
- 18. Net Elect. Energy Gen. (MWH) 700873.0 1474384.0 170151145.7
- 19. Unit Service Factor 100.0 100.0 69.0
- 20. Unit Availability Factor 100.0 100.0 69.0
- 21. Unit Capacity Factor (MDC Net) 104.3 104.1 65.7
- 22. Unit Capacity Factor (DER Net) 102.3 102.1 64.5
- 23. Unit Forced Outage Rate 0.0 0.0 18.2
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Refueling outage currently scheuled for Spring 2005 with a planned duration of approximately 35 days.
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 03-Mar-05 R. Harris 269-465-5901 MONTH Feb-05 AVERAGE DAILY POWER LEVEL DAY DAY 2/1/2005 2/2/2005 2/312005 2/4/2005 2/5/2005 2/6/2005 217/2005 2/8/2005 2/9/2005 2/10/2005 2/11/2005 2/12/2005 2/13/2005 2/14/2005 2/15/2005 2/16/2005 1050 1040 1041 1041 1053 1035 1040 1043 1044 1044 1041 1043 1045 1041 1045 1042 2/17/2005 2/18/2005 2/19/2005 2/20/2005 2/21/2005 2/22/2005 2/23/2005 2/24/2005 2/25/2005 2126/2005 2/27/2005 2/28/2005 AVERAGE DAILY POWER LEVEL 1044 1036 1049 1040 1043 1044 1047 1051 1058 1018 1043 1045
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1 March 3, 2005 J. Newmiller 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - February 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit l: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 3/3/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2 Notes:
- 2. Reporting Period Feb-05
- 3. Licensed Thermal Power (MWt) 3468
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur In Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
Yr. to Date Cumm.
- 11. Hours in Reporting Period 672.0 1416.0 238554.0
- 12. No. of Hrs. Reactor Was Critical 672.0 1391.0 157140.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator on Line 672.0 1381.4 153143.7
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2328157.8 4742118.8 483624456.6
- 17. Gross Elect. Energy Gen. (MWH) 777280.0 1581100.0 156896668.0
- 18. Net Elect. Energy Gen. (MWH) 753537.0 1532312.0 151335726.6
- 19. Unit Service Factor 100.0 97.6 64.8
- 20. Unit Availability Factor 100.0 97.6 64.8
- 21. Unit Capacity Factor (MDC Net) 105.8 102.1 61.0
- 22. Unit Capacity Factor (DER Net) 102.9 99.3 59.3
- 23. Unit Forced Outage Rate 0.0 0.0 22.4
- 24. Shutdowns Scheduled over Next Six Months (Type,Date.and Duration):
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 3-Mar-05 R. Harris 269-465-5901 MONTH Feb-05 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 211/2005 21212005 213/2005 214/2005 2/5/2005 2/6/2005 2/7/2005 218/2005 219/2005 211012005 2111/2005 2112/2005 2113/2005 2/14/2005 2/15/2005 2/16/2005 1117 1120 1133 1115 1114 1133 1105 1121 1119 1134 1109 1126 1126 1119 1112 1127 2117/2005 2/18/2005 2119/2005 2120/2005 2121/2005 2122/2005 2123/2005 2124/2005 2125/2005 2126/2005 2/27/2005 2128/2005 1125 1114 1162 1080 1121 1137 1102 1120 1124 1123 1123 1136
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 March 3, 2005 J. Newmiller 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - February 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE None.
I TYPE-2 PREAS.
' A ME-THOD-.
A SVYTEMM-5 R AMPKNFT.
F: Forced S: Scheduled A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit l: Same Source