INDIANA MICHIGAN POWER Indiana Michigan Power Company Nuclear Generation Group One Cook Place Bridgman,MI 49106 aep.com November 11, 2005 Docket Nos. 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001 AEP:NRC:2691-60 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT In accordance with the requirements of Donald C. Cook Nuclear Plant Unit I and Unit 2 Technical Specification 5.6.4, the attached Monthly Operating Report for October 2005 is submitted.
There are no new commitments associated with this submittal.
Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Supervisor, at (269) 466-2649.
Sincerely, Site Vice President JEN/jen Attachment
-2,4
U. S. Nuclear Regulatory Commissidn AEP:NRC:2691-60 Page 2 c: R. Aben - Department of Labor and Economic Growth ANI Nuclear Engineering Department L. Brandon - MDEQ - WHMD/RPMWS D. P. Fadel G. T. Gaffney - Canton R. A. F. Harris INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus W. H. Schalk L. J. Weber J. A. Zwolinski
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 1 1/7/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 1 Notes:
- 2. Reporting Period Oct-05
- 3. Licensed Thermal Power (MWt) 3304
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
- 11. Hours in Reporting Period 745.0
- 12. No. of Hrs. Reactor Was Critical 745.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Line 745.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2458872.4
- 17. Gross Elect. Energy Gen. (MWH) 791369.0
- 18. Net Elect. Energy Gen. (MWH) 765125.0
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (MDC Net) 102.7
- 22. Unit Capacity Factor (DER Net) 100.7
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Yr. to Date 7296.0 6536.4 0.0 6478.1 0.0 21158881.2 6762999.0 6534208.7 88.8 88.8 89.6 87.8 0.3 Cumm.
270288.0 189037.6 463.0 186246.6 321.0 560830939.1 181939722.0 175210970.4 69.4 69.4 66.2 64.9 17.8
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 07-Nov-05 R. Harris 269-465-5901 MONTH Oct-05 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 10/1/2005 10/2/2005 10/3/2005 10/4/2005 10/5/2005 10/6/2005 10/7/2005 1018/2005 10/9/2005 10/10/2005 10/11/2005 10/12/2005 10/13/2005 10/14/2005 10/15/2005 10/16/2005 1041 1014 1028 1021 1031 1017 1026 1032 1031 1042 1026 1030 1040 1013 1031 1027 10/17/2005 10/18/2005 10/19/2005 10/20/2005 10/21/2005 10/22/2005 10/23/2005 10/24/2005 10/25/2005 10/26/2005 10/27/2005 10/28/2005 10/29/2005 10/30/2005 10/31/2005 1029 1022 1026 1035 1023 1029 1028 1032 1031 1021 1032 1027 1026 991 1037
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit 1 November 7, 2005 J. Newmiller 269.465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G-Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit l: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 1117/2005 COMPLETED BY R. Harris TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2 Notes:
- 2. Reporting Period Oct-05
- 3. Licensed Thermal Power (MWt) 3468
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
1 1. Hours in Reporting Period 745.0
- 12. No. of Hrs. Reactor Was Critical 745.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Line 745.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2579686.0
- 17. Gross Elect. Energy Gen. (MWH) 840540.0
- 18. Net Elect. Energy Gen. (MWH) 813792.0
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (MDC Net) 103.1
- 22. Unit Capacity Factor (DER Net) 100.2
- 23. Unit Forced Outage Rate 0.0
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Yr. to Date 7296.0 7242.0 0.0 7224.6 0.0 24929040.3 8147820.0 7891764.0 99.0 99.0 102.0 99.2 0.0 Cumm.
244434.0 162991.2 0.0 158986.9 0.0 503811378.0 163463388.0 157695178.6 65.7 65.7 62.0 60.3 21.8
- 25. If Shut Down At End of Report Period. Est'd Date of Startup-
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 7-Nov-05 R. Harris 269-465-5901 MONTH Oct-05 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 10/1/2005 10/2/2005 10/3/2005 10/4/2005 10/5/2005 10/6/2005 10/7/2005 10/8/2005 10/9/2005 10/10/2005 10/11/2005 10/12/2005 10/13/2005 10/14/2005 10/15/2005 10/16/2005 1122 1053 1093 1092 1088 1073 1087 1093 1111 1143 1056 1102 1096 1096 1092 1087 10/17/2005 10/18/2005 10/19/2005 10/20/2005 10/21/2005 10/22/2005 10/23/2005 10/24/2005 10/25/2005 10/26/2005 10/27/2005 10/28/2005 10/29/2005 10/30/2005 10/31/2005 1092 1088 1103 1077 1099 1082 1089 1101 1101 1107 1090 1097 1099 1057 1097
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 November 7, 2005 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - October 2005 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON 2 REACTOR 3 REPORT NO.
CODE 4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit i: Same Source