February 2004 Monthly Operating Report for Donald C. Cook, Units 1 and 2
ML040780621
Person / Time
Site: Cook  
Issue date: 03/09/2004
From: Zwolinski J
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2691-40
Download: ML040780621 (8)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, Ml 49107 1395 INDIANA MICHIGAN POWER March 9, 2004 AEP:NRC:2691 -40 Docket Nos.

50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for February 2004 is submitted.

There are no new commitments associated with this submittal.

Should you have any questions, please contact Mr. Toby K. Woods, Compliance Supervisor, at (269) 466-2798.

Sincerely, grj 4,.

John A. Zwolinski Director of Design Engineering and Regulatory Affairs JEN/jen Attachment

-119A

U. S. Nuclear Regulatory Commission AEP:NRC:2691-40 Page 2 c: R. Aben - Department of Consumers and Industry Services ANI Nuclear Engineering Department L. Brandon - MDEQ - WHMD/HWRPS M. J. Finissi G. T. Gaffney - Canton INPO Records Center J. N. Jensen J. T. King - MPSC B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny M. K. Nazar NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus T. C. Pham W. H. Schalk J. A. Zwolinski

41 N.R.C. OPERATING DATA REPORT DOCKET NO.

50-315 DATE 3/2/2004 COMPLETED BY T.Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit I Notes:
2. Reporting Period Feb-04
3. Licensed Thermal Power (MWt) 3304
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity(GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo.

11. Hours in Reporting Period 696.0
12. No. of Hrs. Reactor Was Critical 696.0
13. Reactor Reserve Shutdown Hours 0.0
14. Hours Generator on Line 696.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Therm. Energy Gen. (MWH) 2297117.9
17. Gross Elect. Energy Gen. (MWH) 747670.0
18. Net Elect. Energy Gen. (MWH) 723088.0
19. Unit Service Factor 100.0
20. Unit Availability Factor 100.0
21. Unit Capacity Factor (MDC Net) 103.9
22. Unit Capacity Factor (DER Net) 101.9
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):

Yr. to Date 1440.0 1440.0 0.0 1440.0 0.0 4753581.1 1547190.0 1496368.0 100.0 100.0 103.9 101.9 0.0 Cumm.

255648.0 175341.3 463.0 172619.6 321.0 516122108.6 167588993.0 161341651.9 68.0 68.0 64.5 63.3 19.0

25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-Mar-04 T.Pham 269-465-5901 MONTH Feb-04 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY DAY 2/1/2004 2/2/2004 2/3/2004 2/4/2004 2/512004 2/6/2004 2/7/2004 2/8/2004 2/9/2004 2/10/2004 2/11/2004 2/12/2004 2/13/2004 2/14/2004 2/15/2004 2/16/2004 1040 1037 1045 1038 1041 1042 1050 1030 1038 1040 1038 1042 1042 1035 1040 1038 2/17/2004 2/18/2004 2/19/2004 2/20/2004 2/21/2004 2/22/2004 2/23/2004 2/24/2004 2/25/2004 2/26/2004 2/27/2004 2/2812004 2/2912004 1039 1038 1042 1036 1039 1040 1036 1040 1040 1045 1028 1041 1031

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit 1 March 2, 2004 J. Newmiller 269-465-5901 1 of I UNIT SHUTDOWNS AND POWER REDUCTIONS - February 2004 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE' HOURS REASON 2 REACTOR3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit l: Same Source

1 A N.R.C. OPERATING DATA REPORT DOCKET NO.

50-316 DATE 3/2/2004 COMPLETED BY T.Pham TELEPHONE 269-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2 Notes:
2. Reporting Period Feb-04
3. Licensed Thermal Power (MWt) 3468
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity(GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe) 1 0. Reasons For Restrictions.

This Mo.

Yr. to Date Cumm.

1 1. Hours in Reporting Period 696.0 1440.0 229794.0

12. No. of Hrs. Reactor Was Critical 696.0 1366.6 149649.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 696.0 1361.1 145715.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2412387.9 4689690.4 458365549.9
17. Gross Elect. Energy Gen. (MWH) 802380.0 1556460.0 148670490.0
18. Net Elect. Energy Gen. (MWH) 777733.0 1507959.8 143372866.4
19. Unit Service Factor 100.0 94.5 64.0
20. Unit Availability Factor 100.0 94.5 64.0
21. Unit Capacity Factor (MDC Net) 105.4 98.8 60.0
22. Unit Capacity Factor (DER Net) 102.5 96.1 58.3
23. Unit Forced Outage Rate 0.0 5.5 23.2
24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
25. If Shut Down At End of Report Period, Estd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

p AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-Mar-04 T.Pham 269465-5901 MONTH Feb-04 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY 2/1/2004 2/2/2004 2/3/2004 2/4/2004 2/5/2004 2/6/2004 2/7/2004 2/8/2004 2/9/2004 2/10/2004 2/11/2004 2/12/2004 2/13/2004 2/14/2004 2/15/2004 2/16/2004 DAY 1117 1118 1119 1116 1115 1117 1122 1123 1118 1115 1121 1120 1115 1114 1117 1124 2/17/2004 2/18/2004 2/19/2004 2/20/2004 2/21/2004 2/22/2004 2/23/2004 2/24/2004 2/25/2004 2/26/2004 2/27/2004 2/28/2004 2/29/2004 1113 1116 1117 1125 1115 1116 1116 1112 1115 1125 1112 1120 1114

)

DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 March 2, 2004 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - February 2004 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.

DATE TYPE' HOURS REASON2 REACTOR 3 REPORT NO.

CODE4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:

F: Forced S: Scheduled 2 REASON:

A: Equipment Failure (Explain)

B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain) 3 METHOD:

1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:

Exhibit G - Instructions for preparation of data entry sheets for Ucensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:

Exhibit l: Same Source