IR 05000315/2024402

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401
ML24254A341
Person / Time
Site: Cook, 07200072  
Issue date: 09/10/2024
From: Michael Ziolkowski
NRC/RGN-III
To: Lies Q
Indiana Michigan Power Co
References
IR 2024402
Download: ML24254A341 (1)


Text

SUBJECT:

DONALD C. COOK NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000315/2024402 AND 05000316/2024402, INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200072/2024401

Dear Q. Shane Lies:

On August 1, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

September 10, 2024 This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket Nos. 05000315; 05000316; 07200072 License Nos. DPR-58, DPR-74, General License (ISFSI)

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000315; 05000316; 07200072

License Numbers:

DPR-58; DPR-74; General License (ISFSI)

Report Numbers:

05000315/2024402; 05000316/2024402; 07200072/2024401

Enterprise Identifier:

I-2024-402-0053; I-2024-401-0081

Licensee:

Indiana Michigan Power Company

Facility:

Donald C. Cook Nuclear Plant and ISFSI

Location:

Bridgman, MI

Inspection Dates:

July 15, 2024, to August 01, 2024

Inspectors:

G. Bonano, Physical Security Inspector

N. Egan, Sr. Physical Security Inspector

Approved By:

Michael E. Ziolkowski, Chief

Security, Emergency Preparedness, and Incident

Response Branch

Division of Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

The NRC also conducted an independent spent fuel storage installation security inspection, in accordance with the Spent Fuel Storage Oversight Process. The Spent Fuel Storage Oversight Process is the NRCs program for overseeing the safe storage of spent nuclear fuel.

Refer to https://www.nrc.gov/waste/spent-fuel-storage/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors and IMC 2690, Inspection Program for Dry Storage of Spent Reactor Fuel at Independent Spent Fuel Storage Installations and for Title 10 of the Code of Federal Regulations, Part 71 Transportation Packaging. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All requirements
  • Tier II: 02.09 a; 02.11 a, d; 02.12 a
  • Tier III: 02.15 b, c

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) July 1, 2023, through June 30,

OTHER ACTIVITIES

- INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

===81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations The inspectors evaluated the ISFSI Security Program. The following elements were evaluated:

Physical Security Requirements for Independent Spent Fuel Storage Installations===

(1)02.01 a-c; 02.02 a-h; 02.03 a-m; 02.04; 02.05 a-t; 02.06; 02.07 a-b; 02.08 a-c

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 1, 2024, the inspectors presented the security baseline inspection results to Q. Shane Lies and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

AR 2024-5636

07/16/2024

AR 2024-5661

07/17/2024

AR 2024-5715

07/18/2024

AR 2024-5716

07/18/2024

Corrective Action

Documents

Resulting from

Inspection

AR 2024-5717

07/18/2024

SPP-2060-SFI-

307

Security Equipment Maintenance

SPP-2060-SFI-

308

Non-Routine Tests of Security Equipment

SPP-2060-SFI-

308-1

UPS Surveillance

SPP-2060-SFI-

308-2

Delta Barrier Testing

SPP-2060-SFI-

308-3

Illumination Testing

SPP-2060-SFI-

308-5

HGU and Card Reader Tests

SPP-2060-SFI-

308-6

Communications, Duress, Camera, and Security Computer

Return to Service Testing

SPP-2060-SFI-

308-7

Search Equipment Testing

SPP-2060-SFI-

308-8

Perimeter Intrusion Detection System Testing

SPP-2060-SFI-

308-9

Door, Gate, and Turnstile Testing

Procedures

SPP-2060-SFI-

503

Security Firearms Maintenance and Accountability

71130.04

Self-Assessments

GT-2023-8767-2

Security Equipment Performance Testing, and Maintenance

71151

Procedures

SPP-2060-SFI-

101

Performance Indicator Data Gathering and Reporting

Corrective Action

Documents

Resulting from

Inspection

AR 2024-5638

07/16/2024

Donald C. Cook Nuclear Plant Security Plan

Nov 2022 - Appendix D, CNP Security Plan for ISFSIs,

Indiana Michigan Power Co. (I & M)

Letter of

Agreement (LOA)

Berrien Country Sheriff's Office/Dept Manpower & Equipment

Availability for Response to Emergencies

06/04/2024

Miscellaneous

Report SL-

014566

American Electric Power, Donald

C. Cook Nuclear Plant,

Evaluation of Revised Vehicle Barrier System Layout

Project No.: 13471-625, Aug. 2,2018

Procedures

SPP-2060-SFI-

308-4

OCA/ISFSI Diesel Generator Surveillance

81311

Self-Assessments

GT 2023-8766-1

Security ISFSI Inspection Readiness

0