Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 INDIANA MICHIGAN POWER May 15, 2003 Docket Nos.
AEP:NRC:2691-30 50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit I and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for April 2003 is submitted.
Sincer ly, Jo n B. Giess r irector, Nuclear Technical Projects JEN/jen Attachment I
"'S16"--2
U. S. Nuclear Regulatory Commission AEP:NRC:2691-30 Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, mII L. Brandon - Department of Health M. J. Finissi G. T. Gaffney - Canton J. B. Giessner S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin K. L. Matheny B. A. McIntyre NRC Project Manager - NRR NRC Region Im NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 5(2/2003 COMPLETED BY T Pham TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 1 Notes:
- 2. Reporting Period Apr-03
- 3. Licensed Thermal Power (MWt) 3304
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity(GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
- 11. Hours in Reporting Period 719.0
- 12. No. of Hrs. Reactor Was Critical 554.5
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Line 554.5
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 1834782.6
- 17. Gross Elect. Energy Gen. (MWH) 593030.0
- 18. Net Elect. Energy Gen. (MWH) 573904.4
- 19. Unit Service Factor 77.1
- 20. Unit Availability Factor 77.1
- 21. Unit Capacity Factor (MDC Net) 79.8
- 22. Unit Capacity Factor (DER Net) 78.3
- 23. Unit Forced Outage Rate 22.9
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
currently scheduled for October, 2003 and the duration is planned for 33 days.
Yr. to Date 2879.0 2249.7 0.0 2228.1 0.0 7308788.5 2370490.0 2292419.9 77.4 77.4 79.6 78.1 22.6
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Refueling Outage Cumm.
248327.0 169598.3 463.0 166917.0 321.0 497577863.1 161612920.0 155567616.4 67.7 67.7 64.1 62.8 19.2 May-03 Forecast Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 02-May-03 T Pham 269-465-5901 MONTH Apr-03 AVERAGE DAILY POWER LEVEL 1035 1040 1037 1030 1034 1035 1034 1034 1038 1038 1041 1029 1032 1027 1041 1031 DAY AVERAGE DAILY POWER LEVEL 4/17/2003 4/18/2003 4/19/2003 4/20/2003 4/21/2003 4/22/2003 4/23/2003 4/24/2003 4/25/2003 4/26/2003 4/27/2003 4/28/2003 4/29/2003 4/30/2003 1031 1043 1029 1030 1038 1029 1049 151 0
0 0
0 0
0 DAY 4/1/2003 4/2/2003 4/3/2003 4/4/2003 4/5/2003 4/6/2003 4/7/2003 4/8/2003 4/9/2003 4/10/2003 4/11/2003 4/12/2003 4/13/2003 4/14/2003 4/15/2003 4/16/2003
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 315 D.C. Cook Unit I May 8, 2003 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE' HOURS REASON 2 REACTOR3 REPORT NO.
CODE 4 CODE5 TO PREVENT RECURRENCE 348 030424 F
164.5 H
2 315/2003-003 n/a n/a A large influx of alewives caused a high DP on the traveling screens. The unit was manually tripped due to degraded circulating water conditions. The investigation is ongoing.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit : Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 512/2003 COMPLETED BY T Pham TELEPHONE 269-465-5901 OPERATING STATUS
- 1. Unit Name D. C. Cook Unit 2 Notes:
- 2. Reporting Period Apr-03
- 3. Licensed Thermal Power (MWt) 3411
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity(GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no: 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe) 1 0. Reasons For Restrictions.
This Mo.
- 11. Hours in Reporting Period 719.0
- 12. No. of Hrs. Reactor Was Critical 554.5
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Line 554.5
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 1896854.4
- 17. Gross Elect. Energy Gen. (MWH) 624660.0 1 8. Net Elect. Energy Gen. (MWH) 606109.8
- 19. Unit Service Factor 77.1
- 20. Unit Availability Factor 77.1
- 21. Unit Capacity Factor (MDC Net) 79.5
- 22. Unit Capacity Factor (DER Net) 77.3
- 23. Unit Forced Outage Rate 22.9
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
began on May 5. 2003 scheduled for 33 days.
Yr. to Date 2879.0 2439.1 0.0 2403.6 0.0 8112296.7 2685240.0 2603597.6 83.5 83.5 85.3 83.0 16.5 Cumm.
222473.0 144007.2 0.0 140144.1 0.0 439335993.9 142458940.0 137356336.9 63.6 63.6 59.4 57.8 23.7 Refueling Outage
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
June, 2003
- 26. Units in Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 2-May-03 T Pham 269-465-5901 MONTH Apr-03 AVERAGE DAILY POWER LEVEL 1107 1095 1102 1097 1099 1101 1095 1099 1101 1096 1094 1100 1093 1098 1094 1086 DAY AVERAGE DAILY POWER LEVEL 4/17/2003 4/18/2003 4/19/2003 4/20/2003 4/21/2003 4/22/2003 4/23/2003 4/24/2003 4/25/2003 4/26/2003 4/27/2003 4/28/2003 4/29/2003 4/30/2003 1082 1089 1066 1082 1087
,1089 1087 162 0
0 0
0 0
0 DAY 4/1/2003 4/2/2003 4/3/2003 4/4/2003 4/5/2003 4/6/2003 4/7/2003 4/8/2003 4/9/2003 4/10/2003 4/11/2003 4/12/2003 4/13/2003 4/14/2003 4/15/2003 4/16/2003
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50 - 316 D.C. Cook Unit 2 May 8, 2003 J. Newmiller 269-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 2003 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON 2 REACTOR3 REPORT NO.
CODE4 CODE5 TO PREVENT RECURRENCE 212 030424 F
164.5 H
2 315-2003/003 n/a n/a A large influx of alewives caused a high DP on the traveling screens. The unit was manually tripped due to degraded circulating water conditions. The investigation is ongoing.
I TVDE*
')
CACMk.
iAT:n-%r, A
VC-TA.
A rfuInIlr F: Forced S: Scheduled A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) o ivIlu L.
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)
- . 'VIVIr jIN I I.
Exhibit l: Same Source