Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1373 INDIANA MICHIGAN POWER September 13, 2002 AEP:NRC:2691-19 Docket Nos.
50-315 50-316 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 MONTHLY OPERATING REPORT Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for August 2002 is submitted.
Sincerely, Scot A. Greenlee Director, Nuclear Technical Services
/pae Attachments
U. S. Nuclear Regulatory Commission AEP:NRC:2691-19 Page 2 c: ANI Nuclear Engineering Department A. C. Bakken, III L. Brandon - Department of Health G. T. Gaffney - Canton S. A. Greenlee S. Hamming - Department of Labor RAF Harris INPO Records Center B. Lewis - McGraw-Hill Companies D. H. Malin B. A. McIntyre NRC Project Manager - NRR NRC Region III NRC Resident Inspector D. W. Paul - Columbus J. E. Pollock W. H. Schalk
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-315 DATE 9/4/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.C. Cook Unit I Notes:
- 2. Reporting Period Aug-02
- 3. Licensed Thermal Power (MWt) 3250
- 4. Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity (GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
- 11. Hours in Reporting Period 744.0
- 12. No. of Hrs. Reactor Was Critical 744.0
- 13. Reactor Reserve Shutdown Hours 0.0
- 14. Hours Generator on Line 744.0
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2416003.2
- 17. Gross Elect. Energy Gen. (MWH) 7700700
- 18. Net Elect. Energy Gen. (MWH) 743796.0
- 19. Unit Service Factor 100.0
- 20. Unit Availability Factor 100.0
- 21. Unit Capacity Factor (MDC Net) 1000
- 22. Unit Capacity Factor (DER Net) 98.0
- 23. Unit Forced Outage Rate 00
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Yr. to Date 5831.0 4898.3 0.0 4854.5 0.0 15371233.8 4965490.0 4799189.6 83.3 83.3 82.3 80.7 2.0
- 25. If Shut Down At End of Report Period, Est'd Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Cumm.
2425190 164419.6 463 0 161759.9 321.0 480876540.8 156198310.0 150333483.5 67.2 67.2 63 5 622 19.5
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-315 ONE 04-Sep-02 RAF Harris 616-465-5901 MONTH Aug-02 AVERAGE DAILY POWER LEVEL 992 992 988 996 998 1038 1015 1022 1014 1004 1000 1002 986 992 992 989 DAY 8/17/02 8/18/02 8/19/02 8120/02 8/21/02 8/22/02 8123/02 8/24/02 8/25/02 8/26/02 8/27/02 8/28/02 8/29/02 8/30/02 8/31/02 AVERAGE DAILY POWER LEVEL 985 988 984 989 988 981 992 989 990 993 1011 1026 1021 1017 1018 DAY 811/02 8/2/02 8/3/02 8/4/02 8/5/02 8/6/02 8/7/02 8/8/02 8/9102 8/10/02 8/11/02 8/12/02 8/13/02 8/14/02 8/15/02 8/16/02
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C. Cook Unit 1 September 9, 2002 N. Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - August 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON 2 REACTOR 3 REPORT NO.
CODE 4 CODE5 TO PREVENT RECURRENCE None 1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source
N.R.C. OPERATING DATA REPORT DOCKET NO.
50-316 DATE 9/4/02 COMPLETED BY RAF Harris TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D. C Cook Unit 2 Notes:
- 2. Reporting Period Aug-02
- 3. Licensed Thermal Power (MWt) 3411
- 4. Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090
- 6. Maximum Dependable Capacity (GROSS MWe) 1100
- 7. Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)
- 10. Reasons For Restrictions.
This Mo.
- 11. Hours in Reporting Period 744.0
- 12. No. of Hrs. Reactor Was Critical 692.4
- 13. Reactor Reserve Shutdown Hours 00
- 14. Hours Generator on Line 682.4
- 15. Unit Reserve Shutdown Hours 0.0
- 16. Gross Therm. Energy Gen. (MWH) 2279896.0
- 17. Gross Elect. Energy Gen. (MWH) 728400.0
- 18. Net Elect. Energy Gen. (MWH) 703787.7
- 19. Unit Service Factor 91.7
- 20. Unit Availability Factor 91.7
- 21. Unit Capacity Factor (MDC Net) 89.2
- 22. Unit Capacity Factor (DER Net) 86.8
- 23. Unit Forced Outage Rate 8.3
- 24. Shutdowns Scheduled over Next Six Months (Type,Date,and Duration):
Yr. to Date Cumnm.
5831.0 2166650 4534.1 138639.1 0.0 0.0 4409.6 134811.5 0.0 0.0 14417281.9 421244631.2 4674380.0 136500890.0 4519651.4 131584705.3 75.6 62.9 75.6 62.9 73 1 58.5 71.1 56.9 9.4 24.2
- 25. If Shut Down At End of Report Period, Ested Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-316 TWO 4-Sep-02 RAF Harris 616-465-5901 MONTH Aug-02 AVERAGE DAILY POWER LEVEL 0
0 83 678 1064 1080 1091 1086 1070 1062 1056 1050 1045 1041 1044 1041 DAY 8/17/02 8/18/02 8/19/02 8/20/02 8/21/02 8/22/02 8/23/02 8/24/02 8/25/02 8/26/02 8/27/02 8/28/02 8/29/02 8/30/02 8/31/02 AVERAGE DAILY POWER LEVEL 1042 1041 1040 1041 1047 1039 1041 1048 1044 1048 1070 1085 1086 1083 1080 DAY 8/1/02 8/2/02 8/3/02 8/4/02 8/5/02 8/6/02 8/7/02 8/8/02 8/9/02 8/10/02 8/11/02 8/12/02 8/13/02 8/14/02 8/15/02 8/16/02
DOCKET NO.
UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C. Cook Unit 2 August 9, 2002 N Jackiw 616-465-5901 1 of 1 UNIT SHUTDOWNS AND POWER REDUCTIONS - August 2002 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO.
DATE TYPE1 HOURS REASON2 REACTOR 3 REPORT NO.
CODE 4 CODE5 TO PREVENT RECURRENCE 0208 020727 F
61.6 A
1 NIA NN V
Continuation of Unit 2 shutdown to replace #23 circulating water pump discharge valve.
1 TYPE:
F: Forced S: Scheduled 2 REASON:
A: Equipment Failure (Explain)
B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain) 3 METHOD:
1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain) 4 SYSTEM:
Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5 COMPONENT:
Exhibit I: Same Source